Sen Wei Chua 0 Report post Posted February 14, 2016 Hi Everyone,First time renovating my 4- room BTO flat, received quite a few quote, not sure if i missed out any other details.The scope of the renovation work-Kitchen (Cabinet, sliding to seperate kitchen and living room)-Windows grilles for the entire flat( Service Yard, Living Room,MBR, Bedroom 1 & 2)-Install sliding window at service yard.-Painting and general cleaning of the flat.-Electrical works-Glass panel for MBR toiletQuote No.1A Wet Work1 Supply labour & material to construct base for kitchen cabinet both side 1 lot 300.00B Plumbing Work1 Supply labour & materials to install kitchen sink and connect kitchen sink tap 1 lot 120.002 Supply labour to install bath room accessories 1 lot 60.00C Windows and doors works1 To fabricate and install entire whole house window grill in black color. *Note: only the middle porition of the window117 sqf 994.50**Optional: To increase height to cover full window height ( including top hung and fixpanel)(additional 42sqf S$357)2 To fabricate and install sliding window @ service balcony (black frame with green tintedglass)36 sqf 576.00D Wall Finishes1 Supply and paint the entire unit in selected emulsion paint (ICI Dulux Wash and wear)(max. 5 color)1 lot 1,400.00 1,400.00E Carpentry works (external in laminated finish with white PVC finish internally)Cabinet are equip with normal soft closing for swing door and drawerKitchen1 Fabricate and install top and bottom hung kitchen cabinet 25 ftr 120.00 3,000.002 Fabricate and install solid surface top to kitchen cabinet 16.5 ftr 80.00 1,320.00Optional: Fabricate and install iQuartz top to kitchen cabinet (additional S$1085)3 Fabricate and install Flip-up table top in laminate finish (size: 750mm by 600mm) 1 no 350.00Master Bedroom4 Fabricate and install cantilever TV console 5 ftr 650.00Master Bedroom Toilet5 Fabricate and install swing door mirror cabinet above wash basin and Water closet 4.5 ftr 585.00Living room6 Fabricate and install cantilever TV consoler 8 ftr 1,040.007 Fabricate and install laminated top baywindow cabinet with swing door opening from thefront side11.5 ftr 1,495.00F Glass Work1 Supply and install tempered glass sliding door to entrance of the kitchen 1 lot 800.002 Supply and install fix tempered panel glass to master bedroom toilet in between watercloset and shower area (size: 900mm L by 1900mm Ht)1 no 350.003 Supply and install fix tempered panel glass to common toilet in between water closet andshower area (size: 800mm L by 1900mm Ht)1 no 350.00G Electrical Works1 To install light fitting 12 nos 180.002 To install hood point switch control 1 no 40.00H Others1 Haulage of Goods and disposal of reno rubbish 1 lot 400.002 To chemical clean up floor and windows after renovation works 1 lot 400.00Amount :14,410.507% GST :1,008.74Total SGD :15,419.24Quote No.2From a contractor, however there are no gst included.1 Construct one no. toilet shower curb 110.002 Supply and install one no. sliding door tempered glass shower screen 650.003 Supply and instal one no. kitchen tempered glass sliding door. 730.004 Construct 2 nos. kitchen cabinet base 220.005 Construct kitchen basin concrete stand 650.006 Supply and install one no. kitchen high and low cabinet in laminate finish. 2,380.007 Supply and install one no. granti table top 930.008 Supply and install one no. kitchen low cabinet in laminate finish. 1,100.009 Supply and install one no. granti table top 1,030.0010 Connect the water tap and drainage pipe 90.0011 Supply and install service balcony sliding door window 500.0012 Supply and install living room & 3 bedrooms aluminium window grille 550.0013 Window film for living room, 3 bedrooms and service balcony (USA product) 1,100.0014 Painting whole house (Nippon or ICI), Matex (white) for ceiling 1,300.0015 Supply and install living room low cabinet in laminate finish. 880.0016 Chemical wash whole house flooring 250.0017 Cartoon cardboard cover flooring 150.00Grand total : 12,620.00can you PM me your id's contact no. Thank you. Share this post Link to post Share on other sites
Sen Wei Chua 0 Report post Posted February 14, 2016 In the end, i settle for Quote 3 from a ID.Wet Works1 To supply labor and material to construct 2 nos cabinet bases $290.002 To supply labor and materials to construct fridge bases $90.003 To supply labor and materials to construct washing machines bases $130.004 To supply labor and materials to construct shower kerb $70.00Total Wet Work Cost $580Plumbing works1 To supply labor and materials to extend stainless steel piping @ existing HDB copper piping point for new kitchen sink position $1802 To supply and lay conseal PVC piping for drainage area @ kitchen sink $903 To supply and lay conseal PVC piping for drainage area @ washing machine $1104 To supply labour only to install storage heater c/w storage heater stainless steel piping extension for hot & cold $1405 To supply labor only to install toilet/whole house accessories FOC6 To supply labor only to install & connect new kitchen sink & tap FOC7 To supply labor only to install 2nos mini-spray sets FOCTotal Plumbing works $520Ceiling/Parition works1 To supply labor and materials to construct full height 2 sided partition wall c/w wood base board @ foyer area $430Total Ceiling/Parition works 430Glass works1 To supply labor and materials to install full height plain edge clear mirror @ foyer area partition wall $4502 To supply labor and materials to install designer series full height plain edge strip effect clear mirror @ foyer area partition wall 5303 To supply labor and materials to install 2 D casement glass door between kitchen partition $5804 To supply labor and install 1 set tempered glass shower screen @ master bathroom [1pcs fixed , 1casement[ $530Total Glass works :2090Aluminium Windows works1 To supply and install HDB approve standards grade aluminium sliding window grill @ service yard, living/dining & 3 bedrooms/[max height 4 ft][bronze/Silver] $9802 To supply labor and material to install 1 set powder coated sliding aluminium window @ service yard c/w HDB approved coloured glass. $680Total Aluminium works $1660Electrical works1 To supply labor only to install internal light fixtures @ HDB standard ceiling light points(13 lighting points,lighting provided by owner) FOCTotal Electrical works $0Carpentery worksFoyer Area1 To fabricate and install full height shoes cabinets c/w casement door, ABS trimming, soft close mechanim hingers and designers handler in laminate finish[est 3ft] $650Living Room2 To fabricate and install low height storage cabinets daybeds c/w PVC cushion, casement sling door, ABS trimming, slow close mechanism hindges & designer handles in laminate finishes [est 10.5ft] $1470Master Bathroom area3 To fabricate and install suspended storage cabinets c/w 1 sliding mirror door, top and bottom coverlight , internal shelving, ABS trimming and designer handles in PVC finishes [est 5 ft] $690Kitchen Area4 To fabricate and install top tread removable pelmet box up in laminate finish @ both side 7005 To fabricate and install top & bottom kitchen cabinet c/w ABS trimming, slow close mechanicsm hindges, 2 set of drawers and designer handles in laminate finish[est 20 ft] $20006 To supply and install 1 no frosted glass for kitchen cabinet FOC7 To supply and install 1 nos 2-tier stainless stell dish rack FOC8 To supply labor only to install cooker hob and hood FOC9 To supply and install1 no PVC cutlery tray10 To supply and install polyester base heavy duty solid surface worktop c/w front profile & backsplash [est 17ft][Test and appoved by PSB] 1150*All carpentry works are all using solid 3 plywood c/w high pressure laminate finish, use only local laminate materials, material quality assuredTotal carpentry costs=6660Misc works1 To supply labor and materials to pain whole unit using Original Nippon/ICI paint [4+1 colors] include Matex paint for ceiling (min two coats), painting of all PVC/stainless steel pipes, all doors, door frame c/w glossy paint if needed, main gaite c/w glossy paint if needed $10602 To supply labor and materials to acid wash for entire unit FOC3 To supply labor and materials to do general cleanin for entire unit FOC4 To supply labor and materials to lay corrugated paper for whole house by HDB haulage FOC5 HDB parking of skip tank at loading and unloading fees FOC6 HDB Permit and handling fees FOC7 Haulage and debris removal fees [include upload of sand] As charged as per receiptTotal misc work :$1060 + ?Total renovation cost = $13000** does not include haulage and debris removal fee and additional electical routing.Can you PM me your id's contact? Share this post Link to post Share on other sites
Bh315 0 Report post Posted February 18, 2016 can send me id for quote 3 to email zhenzhenjie@hotmail.comThanks Share this post Link to post Share on other sites
renokarentan 0 Report post Posted September 18, 2016 Hi lookaround, though you have not replied to this post for quite some time now, I hope you can PM me the contact details of your contractor. Thanks in advance! Share this post Link to post Share on other sites
redAntz 0 Report post Posted March 5, 2017 Can pm the contact details please. Thanks in advance. Share this post Link to post Share on other sites