Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
lookaround

Reasonable Quote ? Any Missing Details ?

Recommended Posts


Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

Hi lookaround, could u pm me the 3 ids according to the quotes..? Thx.. Btw, may i noe if urs is the standard or premium 4rm bto..?

 

Share this post


Link to post
Share on other sites

Hi,

Could you pm me your ID contact for Quote 3?

Thanks.

Regards,

Christopher TS

ChristopherTS, have send the contact for ID 3.

Hi ! Can PM me the ID for quote no. 1 & 3? Thanks ! :)

Hi can you pm me the id for quote 1 and 3 ?? Thankew in advance

Hi can you pls pm me the id for quote 1 and 3 too. Thanks

Hello lookaround

Could you please pm me contact info of quote-1 and quote-3?

Thanks in advance.

Corditionalsm,JoeyNg,win_low and KhinMarlarAye,

To be fair to the ID #3 whom i have engaged and had a rather pleasant experience, i will send you the contact of the ID #3 first, if you really need the contact of ID #1, do pm or reply to this thread.

Hi lookaround, could u pm me the 3 ids according to the quotes..? Thx.. Btw, may i noe if urs is the standard or premium 4rm bto..?

To be fair to the ID #3 whom i have engaged and had a rather pleasant experience, i will send you the contact of the ID #3 first, if you really need the contact of ID #1, contactor #2 do pm or reply to this thread. Mine is 4rm bto with flooring and everything from hdb.

The reason for it is that, occasionally i will received request for ID#1 and contractor #2 whom i didn't engage and i will have to dig and search for their contacts and ID #3 quotes is pretty competitive.

The good thing about all my 3 quotes is that, they are all itemized thus can easily compare and eliminate hidden costs.

 

Share this post


Link to post
Share on other sites

Hi turnaround

I am new to this forum....just got a 5 rooms resales ...

Appreciate if you can PM me Quote 2 & 3

Thanks

Hi, can pm me contact for quote 3? Thanks!

Have replied to your PM, do check out homefix at marina square, they are having a pre-renovation sale, you might find something that is useful if you intend to DIY,

Edited by lookaround
 

Share this post


Link to post
Share on other sites

Hi, can pm me contact for quote 3?

Thanks!

ryanlam87, have send your a pm.

Hi,

Can pm me contact for quote 3?

Thank you.

qcatalyst, have send your a pm.

Your 3rd ID quote is much lower compared to others.Appreciated you can sare with me your ID and quotation.

boonvui, have send you a pm. I think the 3rd ID quote is decent, i believe there are some quotes that are much lower than his if you find and search hard enough.

 
  • Like 1

Share this post


Link to post
Share on other sites

Hi, thanka for sharing. Can you PM me the ID for quotation 3?

In the end, i settle for Quote 3 from a ID.

Wet Works

1 To supply labor and material to construct 2 nos cabinet bases $290.00

2 To supply labor and materials to construct fridge bases $90.00

3 To supply labor and materials to construct washing machines bases $130.00

4 To supply labor and materials to construct shower kerb $70.00

Total Wet Work Cost $580

Plumbing works

1 To supply labor and materials to extend stainless steel piping @ existing HDB copper piping point for new kitchen sink position $180

2 To supply and lay conseal PVC piping for drainage area @ kitchen sink $90

3 To supply and lay conseal PVC piping for drainage area @ washing machine $110

4 To supply labour only to install storage heater c/w storage heater stainless steel piping extension for hot & cold $140

5 To supply labor only to install toilet/whole house accessories FOC

6 To supply labor only to install & connect new kitchen sink & tap FOC

7 To supply labor only to install 2nos mini-spray sets FOC

Total Plumbing works $520

Ceiling/Parition works

1 To supply labor and materials to construct full height 2 sided partition wall c/w wood base board @ foyer area $430

Total Ceiling/Parition works 430

Glass works

1 To supply labor and materials to install full height plain edge clear mirror @ foyer area partition wall $450

2 To supply labor and materials to install designer series full height plain edge strip effect clear mirror @ foyer area partition wall 530

3 To supply labor and materials to install 2 D casement glass door between kitchen partition $580

4 To supply labor and install 1 set tempered glass shower screen @ master bathroom [1pcs fixed , 1casement[ $530

Total Glass works :2090

Aluminium Windows works

1 To supply and install HDB approve standards grade aluminium sliding window grill @ service yard, living/dining & 3 bedrooms/[max height 4 ft][bronze/Silver] $980

2 To supply labor and material to install 1 set powder coated sliding aluminium window @ service yard c/w HDB approved coloured glass. $680

Total Aluminium works $1660

Electrical works

1 To supply labor only to install internal light fixtures @ HDB standard ceiling light points(13 lighting points,lighting provided by owner) FOC

Total Electrical works $0

Carpentery works

Foyer Area

1 To fabricate and install full height shoes cabinets c/w casement door, ABS trimming, soft close mechanim hingers and designers handler in laminate finish[est 3ft] $650

Living Room

2 To fabricate and install low height storage cabinets daybeds c/w PVC cushion, casement sling door, ABS trimming, slow close mechanism hindges & designer handles in laminate finishes [est 10.5ft] $1470

Master Bathroom area

3 To fabricate and install suspended storage cabinets c/w 1 sliding mirror door, top and bottom coverlight , internal shelving, ABS trimming and designer handles in PVC finishes [est 5 ft] $690

Kitchen Area

4 To fabricate and install top tread removable pelmet box up in laminate finish @ both side 700

5 To fabricate and install top & bottom kitchen cabinet c/w ABS trimming, slow close mechanicsm hindges, 2 set of drawers and designer handles in laminate finish[est 20 ft] $2000

6 To supply and install 1 no frosted glass for kitchen cabinet FOC

7 To supply and install 1 nos 2-tier stainless stell dish rack FOC

8 To supply labor only to install cooker hob and hood FOC

9 To supply and install1 no PVC cutlery tray

10 To supply and install polyester base heavy duty solid surface worktop c/w front profile & backsplash [est 17ft][Test and appoved by PSB] 1150

*All carpentry works are all using solid 3 plywood c/w high pressure laminate finish, use only local laminate materials, material quality assured

Total carpentry costs=6660

Misc works

1 To supply labor and materials to pain whole unit using Original Nippon/ICI paint [4+1 colors] include Matex paint for ceiling (min two coats), painting of all PVC/stainless steel pipes, all doors, door frame c/w glossy paint if needed, main gaite c/w glossy paint if needed $1060

2 To supply labor and materials to acid wash for entire unit FOC

3 To supply labor and materials to do general cleanin for entire unit FOC

4 To supply labor and materials to lay corrugated paper for whole house by HDB haulage FOC

5 HDB parking of skip tank at loading and unloading fees FOC

6 HDB Permit and handling fees FOC

7 Haulage and debris removal fees [include upload of sand] As charged as per receipt

Total misc work :$1060 + ?

Total renovation cost = $13000*

* does not include haulage and debris removal fee and additional electical routing.

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×