lookaround 24 Report post Posted April 12, 2014 (edited) Hi Everyone,First time renovating my 4- room BTO flat, received quite a few quote, not sure if i missed out any other details.The scope of the renovation work-Kitchen (Cabinet, sliding to seperate kitchen and living room)-Windows grilles for the entire flat( Service Yard, Living Room,MBR, Bedroom 1 & 2)-Install sliding window at service yard.-Painting and general cleaning of the flat.-Electrical works-Glass panel for MBR toiletQuote No.1A Wet Work1 Supply labour & material to construct base for kitchen cabinet both side 1 lot 300.00B Plumbing Work1 Supply labour & materials to install kitchen sink and connect kitchen sink tap 1 lot 120.002 Supply labour to install bath room accessories 1 lot 60.00C Windows and doors works1 To fabricate and install entire whole house window grill in black color. *Note: only the middle porition of the window117 sqf 994.50**Optional: To increase height to cover full window height ( including top hung and fixpanel)(additional 42sqf S$357)2 To fabricate and install sliding window @ service balcony (black frame with green tintedglass)36 sqf 576.00D Wall Finishes1 Supply and paint the entire unit in selected emulsion paint (ICI Dulux Wash and wear)(max. 5 color)1 lot 1,400.00 1,400.00E Carpentry works (external in laminated finish with white PVC finish internally)Cabinet are equip with normal soft closing for swing door and drawerKitchen1 Fabricate and install top and bottom hung kitchen cabinet 25 ftr 120.00 3,000.002 Fabricate and install solid surface top to kitchen cabinet 16.5 ftr 80.00 1,320.00Optional: Fabricate and install iQuartz top to kitchen cabinet (additional S$1085)3 Fabricate and install Flip-up table top in laminate finish (size: 750mm by 600mm) 1 no 350.00Master Bedroom4 Fabricate and install cantilever TV console 5 ftr 650.00Master Bedroom Toilet5 Fabricate and install swing door mirror cabinet above wash basin and Water closet 4.5 ftr 585.00Living room6 Fabricate and install cantilever TV consoler 8 ftr 1,040.007 Fabricate and install laminated top baywindow cabinet with swing door opening from thefront side11.5 ftr 1,495.00F Glass Work1 Supply and install tempered glass sliding door to entrance of the kitchen 1 lot 800.002 Supply and install fix tempered panel glass to master bedroom toilet in between watercloset and shower area (size: 900mm L by 1900mm Ht)1 no 350.003 Supply and install fix tempered panel glass to common toilet in between water closet andshower area (size: 800mm L by 1900mm Ht)1 no 350.00G Electrical Works1 To install light fitting 12 nos 180.002 To install hood point switch control 1 no 40.00H Others1 Haulage of Goods and disposal of reno rubbish 1 lot 400.002 To chemical clean up floor and windows after renovation works 1 lot 400.00Amount :14,410.507% GST :1,008.74Total SGD :15,419.24Quote No.2From a contractor, however there are no gst included.1 Construct one no. toilet shower curb 110.002 Supply and install one no. sliding door tempered glass shower screen 650.003 Supply and instal one no. kitchen tempered glass sliding door. 730.004 Construct 2 nos. kitchen cabinet base 220.005 Construct kitchen basin concrete stand 650.006 Supply and install one no. kitchen high and low cabinet in laminate finish. 2,380.007 Supply and install one no. granti table top 930.008 Supply and install one no. kitchen low cabinet in laminate finish. 1,100.009 Supply and install one no. granti table top 1,030.0010 Connect the water tap and drainage pipe 90.0011 Supply and install service balcony sliding door window 500.0012 Supply and install living room & 3 bedrooms aluminium window grille 550.0013 Window film for living room, 3 bedrooms and service balcony (USA product) 1,100.0014 Painting whole house (Nippon or ICI), Matex (white) for ceiling 1,300.0015 Supply and install living room low cabinet in laminate finish. 880.0016 Chemical wash whole house flooring 250.0017 Cartoon cardboard cover flooring 150.00Grand total : 12,620.00 Edited April 12, 2014 by lookaround 1 Share this post Link to post Share on other sites
Devilaz 0 Report post Posted April 15, 2014 From the 2 quotes, which one you feel more comfortable with?Quotations?Quality of materials?Workmanship?Meet to your expectations? Share this post Link to post Share on other sites
Dylanchua 9 Report post Posted April 16, 2014 Been getting quotes recently myself. The tempered glass prices seems ok. Cabinet of $120 is quite standard.. Not high not low. Others I can't comment, cos never really breakdown those. The iQuartz seems high though. I've been quoted $50 per foot for solid top and $120 per foot for iQuartz. Share this post Link to post Share on other sites
Happycouple 0 Report post Posted April 21, 2014 me="Dylanchua" post="851487" timestamp="1397656524"]Been getting quotes recently myself. The tempered glass prices seems ok. Cabinet of $120 is quite standard.. Not high not low. Others I can't comment, cos never really breakdown those. The iQuartz seems high though. I've been quoted $50 per foot for solid top and $120 per foot for iQuartz.Hi guys,I have been quoted $110 per ft for Iquartz as well as granite.Im not sure which woule be better? Kindly advise. Thanks Share this post Link to post Share on other sites
Dylanchua 9 Report post Posted April 21, 2014 From what I heard, granite is natural stone, porous, so will absorb fluids. And it has joint lines. Cos it's natural and comes in all sizes in natural form.IQuartz is non porous and man made so no join lines. But cannot tahan heat as well as granite. Share this post Link to post Share on other sites
Happycouple 0 Report post Posted April 22, 2014 From what I heard, granite is natural stone, porous, so will absorb fluids. And it has joint lines. Cos it's natural and comes in all sizes in natural form.IQuartz is non porous and man made so no join lines. But cannot tahan heat as well as granite.Thanks for the info. But wanted to check for Iquartz & quartz, is there a difference? I see most prefer getting Iquartz since its heat resistent unlike solid surface top.. Confused over which top to settle for.. Share this post Link to post Share on other sites
Dylanchua 9 Report post Posted April 22, 2014 IQuartz is also quartz, it's just a brand of quartz la. IQuartz is one of the cheaper brands.. Share this post Link to post Share on other sites
Brian Huang 4 Report post Posted April 22, 2014 do let us know which you selected in the end and the reasons why good luck! Share this post Link to post Share on other sites
Dylanchua 9 Report post Posted April 23, 2014 If u want good stuff, then ask for Caesarstone.. Share this post Link to post Share on other sites
lookaround 24 Report post Posted April 28, 2014 In the end, i settle for Quote 3 from a ID.Wet Works1 To supply labor and material to construct 2 nos cabinet bases $290.002 To supply labor and materials to construct fridge bases $90.003 To supply labor and materials to construct washing machines bases $130.004 To supply labor and materials to construct shower kerb $70.00Total Wet Work Cost $580Plumbing works1 To supply labor and materials to extend stainless steel piping @ existing HDB copper piping point for new kitchen sink position $1802 To supply and lay conseal PVC piping for drainage area @ kitchen sink $903 To supply and lay conseal PVC piping for drainage area @ washing machine $1104 To supply labour only to install storage heater c/w storage heater stainless steel piping extension for hot & cold $1405 To supply labor only to install toilet/whole house accessories FOC6 To supply labor only to install & connect new kitchen sink & tap FOC7 To supply labor only to install 2nos mini-spray sets FOCTotal Plumbing works $520Ceiling/Parition works1 To supply labor and materials to construct full height 2 sided partition wall c/w wood base board @ foyer area $430Total Ceiling/Parition works 430Glass works1 To supply labor and materials to install full height plain edge clear mirror @ foyer area partition wall $4502 To supply labor and materials to install designer series full height plain edge strip effect clear mirror @ foyer area partition wall 5303 To supply labor and materials to install 2 D casement glass door between kitchen partition $5804 To supply labor and install 1 set tempered glass shower screen @ master bathroom [1pcs fixed , 1casement[ $530Total Glass works :2090Aluminium Windows works1 To supply and install HDB approve standards grade aluminium sliding window grill @ service yard, living/dining & 3 bedrooms/[max height 4 ft][bronze/Silver] $9802 To supply labor and material to install 1 set powder coated sliding aluminium window @ service yard c/w HDB approved coloured glass. $680Total Aluminium works $1660Electrical works1 To supply labor only to install internal light fixtures @ HDB standard ceiling light points(13 lighting points,lighting provided by owner) FOCTotal Electrical works $0Carpentery worksFoyer Area1 To fabricate and install full height shoes cabinets c/w casement door, ABS trimming, soft close mechanim hingers and designers handler in laminate finish[est 3ft] $650Living Room2 To fabricate and install low height storage cabinets daybeds c/w PVC cushion, casement sling door, ABS trimming, slow close mechanism hindges & designer handles in laminate finishes [est 10.5ft] $1470Master Bathroom area3 To fabricate and install suspended storage cabinets c/w 1 sliding mirror door, top and bottom coverlight , internal shelving, ABS trimming and designer handles in PVC finishes [est 5 ft] $690Kitchen Area4 To fabricate and install top tread removable pelmet box up in laminate finish @ both side 7005 To fabricate and install top & bottom kitchen cabinet c/w ABS trimming, slow close mechanicsm hindges, 2 set of drawers and designer handles in laminate finish[est 20 ft] $20006 To supply and install 1 no frosted glass for kitchen cabinet FOC7 To supply and install 1 nos 2-tier stainless stell dish rack FOC8 To supply labor only to install cooker hob and hood FOC9 To supply and install1 no PVC cutlery tray10 To supply and install polyester base heavy duty solid surface worktop c/w front profile & backsplash [est 17ft][Test and appoved by PSB] 1150*All carpentry works are all using solid 3 plywood c/w high pressure laminate finish, use only local laminate materials, material quality assuredTotal carpentry costs=6660Misc works1 To supply labor and materials to pain whole unit using Original Nippon/ICI paint [4+1 colors] include Matex paint for ceiling (min two coats), painting of all PVC/stainless steel pipes, all doors, door frame c/w glossy paint if needed, main gaite c/w glossy paint if needed $10602 To supply labor and materials to acid wash for entire unit FOC3 To supply labor and materials to do general cleanin for entire unit FOC4 To supply labor and materials to lay corrugated paper for whole house by HDB haulage FOC5 HDB parking of skip tank at loading and unloading fees FOC6 HDB Permit and handling fees FOC7 Haulage and debris removal fees [include upload of sand] As charged as per receiptTotal misc work :$1060 + ?Total renovation cost = $13000** does not include haulage and debris removal fee and additional electical routing. Share this post Link to post Share on other sites
lookaround 24 Report post Posted April 28, 2014 do let us know which you selected in the end and the reasons why good luck!In the end, we settled for quote 3.- Budget and price, i have met countless of IDs, freelance IDs and contractors, even after i tell them my expected budget, they still exceed the budget and included alot of unneccessary stuff i do not require.- Time , i have been meeting all this renovation ppl for about 5 months and most of the neighbours have already moved in to estate.- Missy seemed quite keen on engaging this ID as she has seem his work.- The quote seem pretty ok as compared to some of the quotes that i have seemed where certain items are inflated.From the 2 quotes, which one you feel more comfortable with?Quotations?Quality of materials?Workmanship?Meet to your expectations?In the end, i settled for Quote 3.-Quotations:Quote 1 has GST and since i wasn't sure if i can cfm the contractor thus i never try to negotiate for it to be waived off.Quote 2 din include GST and seem to be cheaper as it is a friend's dad who is a subcon, but we are worried also if the friend's dad never do a good job and etc. So after getting the quote, we never ask much.-Qualtiy of materials:I am noob in renovation, thus no sure how to gauge the quality.-Workmanship:Unable to coment as well as most of them just showed pictures of their completed works.Meeting expections-Both contractors in quote 1 and 2 are able to point out and highlight some points which the other did not notice, so i guess both have different view on how to tackle this reno project.Lastly, i guess both contractors just listen to what we wanted to do and gave their opinion although i guess if i listen to their input first, the outcome might be different. Share this post Link to post Share on other sites
rio 2 Report post Posted April 30, 2014 can pm me id for quote 3? Share this post Link to post Share on other sites
vuzu 9 Report post Posted May 2, 2014 Hi, could you please pm me your quote 3 ID contacts?Do share with us your pics and tips of reno and update us the process if you're ok.Thanks and have a nice weekend. Share this post Link to post Share on other sites
messi1986 0 Report post Posted May 3, 2014 can pm me id for quote 3? Thank you.. Share this post Link to post Share on other sites
Smallville07 0 Report post Posted May 3, 2014 Pm me quote 3 contacts.. Thanks Share this post Link to post Share on other sites