Progress doing great...great tips on the door and water heater.

I did not realise that too! Learn a new thing again. ;)

 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request

welcomed! Hope the rest can be completed by next week before I am out of town. Can't wait to see the final work.

Progress doing great...great tips on the door and water heater.

I did not realise that too! Learn a new thing again. ;)

 

Share this post


Link to post
Share on other sites

Had a hunch that mirror is installed today and decided to pop over after work. Indeed, the mirror at the living room is up! the granite are laid as well on the kitchen cabinet. However, the tap for my kitchen basin was installed wrongly. The design is unique, i believe plumber might be confused with where the valve control should be facing... :no:

Glass door @ MBR toilet is installed, basin + tap at common toilet is installed too.

Pictures of today 'catch'

Glass door at MBR toilet

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140516_0021_zpsb191176c.jpg

Basin and tap @ common toilet (pending glass shower screen and top cabinet)

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140516_0031_zpsda1aa760.jpg

Multi-point instant heater installed (not wired yet)

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140516_0041_zps566eec21.jpg

Mirrors! up at the the living room. The brown tint is not so obvious as the sample that we were shown...nice though (pending another mirror at settee area)

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140516_0051_zps5fcdff31.jpg

Cove lights @ living room were up since last week. Didnt manage to took picture then..

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140516_0071_zpsbfd49b43.jpg

Granite top laid at both side of the cabinets (pending a small shelf next to tall boy)

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140516_0081_zpsd7f660e2.jpg

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140516_0091_zps87a9a304.jpg

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140516_0101_zpsf7c826f9.jpg

Shelving @ DB box providing FOC by ID

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140516_0121_zpsb2e14f79.jpg

Edited by lawda
 

Share this post


Link to post
Share on other sites

All the carpentry are installed in the house this week and have been doing spot checking today. Noticed quite alot of chips and roughness which were highlighted. The supervisor explained that most of these are due to transportation and they will fix the issue asap.

I am left with installation of all the accessories, few lightings and touch up to end this blog soon... :P

Will be meeting up curtain installer this coming monday to take measurement and to pop over to PD door office hopefully end of the month to check out door for the kitchen entrance.

Pictures to share today:

Glass installed at the kitchen wall

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140518_0511_zps73a083fc.jpg

Full height mirror installed at the walk-in wardrobe @ MBR

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140518_0081_zpsc795e40e.jpg

Tic tac door and shelving at side of MBR wardrobe

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140518_0061_zpsc308c9ed.jpg

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140518_0071_zps0714ee31.jpg

Study table is finally installed (outstanding switches on the panel)

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140518_0461_zps8b68d239.jpg

Edited by lawda
 

Share this post


Link to post
Share on other sites

Went to take a look at my unit today to check if all the toilet accessories are installed. Was initially happy on seeing the 'goodies' that we purchased were installed accordingly to what we have marked out and discussed with the PM but was pissed off when i saw my tower hanger at MBR toilet was installed not to our marking :no:

Immediately whatapps my PM and ID on the issue and request to have this fixed without seeing any patches on my wall tiles!

Mirror at the Living room was replaced with the brown tint that my ID had initially designed. Look nice.

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140525_0091_zps28c0790d.jpg

Installation at Common bathroom (top vanity, toothbrush holder, tower holder, toilet roll holder and glass shelves)

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140525_0081_zpse9ef9c6d.jpg

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140525_0061_zps6d25236b.jpg (stainless steel)

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140525_0051_zpsbb6809e7.jpg

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140525_0071_zps9079162c.jpg

Installation at MBR bathroom (glass shelves, toothbrush holder, toilet roll holder and bidget spray)

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140525_0041_zpse3634416.jpg

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140525_0021_zpsc8bbb4ac.jpg

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140525_0031_zpsc755adfd.jpg

The tower hanger in my MBR that i am pissed off with! I knew the height i marked was too high but it is because of the glass door which can be swing out if a kookoo pushes it too hard and break the rubber! the current location that the installer did is too close to the door and any mishap, the door will be cracked... period. :angry2:

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140525_0011_zps0e9d1920.jpg

Edited by lawda
 

Share this post


Link to post
Share on other sites

Went to take a look at my unit today to check if all the toilet accessories are installed. Was initially happy on seeing the 'goodies' that we purchased were installed accordingly to what we have marked out and discussed with the PM but was pissed off when i saw my tower hanger at MBR toilet was installed not to our marking :no:

Immediately whatapps my PM and ID on the issue and request to have this fixed without seeing any patches on my wall tiles!

The tower hanger in my MBR that i am pissed off with! I knew the height i marked was too high but it is because of the glass door which can be swing out if a kookoo pushes it too hard and break the rubber! the current location that the installer did is too close to the door and any mishap, the door will be cracked... period. :angry2:

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140525_0011_zps0e9d1920.jpg

You and I had the same idea. I don't understand why some workers do not use their brains, especially since you marked the location.

In my case, I always make it a point to stick a masking tape horizontally across the desired location and mark out in block letters: TOWEL RACK HERE.

I also have a rack similarly installed just above the top of my glass door. See here. The glass door swings out, but I did it just in case some user swings it in. As a matter of fact, it is now being used swinging in.

Edited by kstoh
 

Share this post


Link to post
Share on other sites

Went to take a look at my unit today to check if all the toilet accessories are installed. Was initially happy on seeing the 'goodies' that we purchased were installed accordingly to what we have marked out and discussed with the PM but was pissed off when i saw my tower hanger at MBR toilet was installed not to our marking :no:

Immediately whatapps my PM and ID on the issue and request to have this fixed without seeing any patches on my wall tiles!

Mirror at the Living room was replaced with the brown tint that my ID had initially designed. Look nice.

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140525_0091_zps28c0790d.jpg

Installation at Common bathroom (top vanity, toothbrush holder, tower holder, toilet roll holder and glass shelves)

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140525_0081_zpse9ef9c6d.jpg

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140525_0061_zps6d25236b.jpg (stainless steel)

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140525_0051_zpsbb6809e7.jpg

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140525_0071_zps9079162c.jpg

Installation at MBR bathroom (glass shelves, toothbrush holder, toilet roll holder and bidget spray)

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140525_0041_zpse3634416.jpg

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140525_0021_zpsc8bbb4ac.jpg

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140525_0031_zpsc755adfd.jpg

The tower hanger in my MBR that i am pissed off with! I knew the height i marked was too high but it is because of the glass door which can be swing out if a kookoo pushes it too hard and break the rubber! the current location that the installer did is too close to the door and any mishap, the door will be cracked... period. :angry2:

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140525_0011_zps0e9d1920.jpg

Hihi, the stainless steel storage cabinet with open ledge in your common toilet... where and how much did you get it for? thanks!

 

Share this post


Link to post
Share on other sites

that what I marked on but.... Anyway, we will have a stopper by the side together with the hinge to prevent the door from swinging outwards

Ahh... It's easier to mount in the grout.

Sometimes the easy way out requires a redo!

 

Share this post


Link to post
Share on other sites

I got it at universal union in geylang, cost slightly over 200 (can't remember actual cost) ;p

Hihi, the stainless steel storage cabinet with open ledge in your common toilet... where and how much did you get it for? thanks!

 

Share this post


Link to post
Share on other sites

:angry2: ya, sometimes I think the workers feel that we are naive and not suggesting practical location but the fact is we think abit further....

You and I had the same idea. I don't understand why some workers do not use their brains, especially since you marked the location.

In my case, I always make it a point to stick a masking tape horizontally across the desired location and mark out in block letters: TOWEL RACK HERE.

I also have a rack similarly installed just above the top of my glass door. See here. The glass door swings out, but I did it just in case some user swings it in. As a matter of fact, it is now being used swinging in.

 

Share this post


Link to post
Share on other sites

Was away on business trips and busy catching up on the checking and cleaning that i have not been update the blog. Some unhappy issues came along during the check but was quickly resolved by the boss and ID. Had also manage to move in some stuff over the weekends.

Catch-up on the 'outstanding' pictures:

MBR done up with curtains and tv installed:

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140622_0021_zpsd945167c.jpg

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140622_0031_zpsfc793376.jpg

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140622_0051_zpsa0547c55.jpg

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140622_0061_zpsd4ce1424.jpg

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140622_0071_zpsf251802b.jpg

MBR toilet:

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140622_0081_zpsc9a7efaf.jpg

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140622_0111_zps64c6208d.jpg

Living room Walkway:

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140622_0121_zpsdbe7e0db.jpg

Living Room:

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140622_0151_zps27909220.jpg

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140622_0141_zps9f8a36dc.jpg

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140622_0131_zps7b1c8ccf.jpg

Main Door with "toy":

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140622_0161_zpsd9683d20.jpg

The 2 bedrooms with curtains:

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140622_0181_zpsf6264030.jpg

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140622_0201_zps8665b90c.jpg

Common toilet:

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140622_0211_zpse99e2177.jpg

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140516_0041_zps566eec21.jpg

Kitchen:

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140622_0171_zps10a87f9e.jpg

Will be receiving sofa, dining tables, beds and installing shelves in bombshelter this coming saturday. Will update the pictures again! Ending this blog soon :)

 

Share this post


Link to post
Share on other sites

Been doing lots of cleaning and cleaning for the arrival of the finale last saturday.... :notti:

Was a long day waiting in the house for the arrival of sofa, dining table, fridge, washing machines, mattress and installation of shelves in the storeroom. Glimpse of the output for sharing:

Completed bed room:

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140629_0201_zpsf1f8ca90.jpg

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140629_0191_zps78d8d964.jpg

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140629_0181_zpsa9a6f07c.jpg

Completed service yard, kitchen and storeroom:

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140628_0101_zpsbb85020e.jpg

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140628_0091_zpsb1628c3f.jpg

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140628_0061_zps896c1f1b.jpg

Completed living and dining area:

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140628_0111_zpsb22995af.jpg

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140628_0131_zps2e567eb7.jpg

http://i1372.photobucket.com/albums/ag351/lawda/WP_20140629_0171_zpsd362b1ca.jpg

Last and not least will be the installation of a PD door for the kitchen opening. Have been eyeing on one that comes with my idea design :rolleyes:

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×