lawda 2 Report post Posted April 8, 2014 Got my key in February 2014 and appointed my ID in March. Been through few reviews, quotes and visiting real sites of potential IDs workmanship before we conclude on the one recommended in this forum. It's my first posting with image and hope the standard unit plan from HDB works..... Share this post Link to post Share on other sites
lawda 2 Report post Posted April 8, 2014 (edited) 3D design not yet finalised but we had the location of the aircon fixed and installed. "unfortunately", we engaged the "famous" provider in this forum without reading through the negative feedback. We pressed on with communication with the sales person and service manager and things work out well. My post on my experience as follows:http://www.renotalk.com/forum/topic/14091-best-tech-aircon-imm/page-3#entry848049some pictures of my installation done 2 weeks back.Agreed and offered insulation during the purchase from saleshttp://i1372.photobucket.com/albums/ag351/lawda/WP_20140329_012_zps57f2abf1.jpg Thick trunking used, may look horrible for some but to me its one trunk instead of 2 trunks runninghttp://i1372.photobucket.com/albums/ag351/lawda/WP_20140329_008_zps8f96d12e.jpginstaller does put in good point, he actually runs the full trunking length across the wall even though there's no need to as the pipe is at the middle of the wall. Reason, 3/4 trunk running across the wall will be very obvious. Full length and after painting is done, the trunk will look less obvious and blend in with the beam.http://i1372.photobucket.com/albums/ag351/lawda/WP_20140329_007_zpsd48d6fac.jpghttp://i1372.photobucket.com/albums/ag351/lawda/WP_20140329_006_zps47fb14d2.jpgTo ease my fear of condensation and leaking pipe, installer advise to shorten the route for water to be drained. Simple law of physics which we returned to the teachers in search of aesthetics...http://i1372.photobucket.com/albums/ag351/lawda/WP_20140329_005_zpsc6d344d3.jpghttp://i1372.photobucket.com/albums/ag351/lawda/WP_20140329_001_zps3d217367.jpghttp://i1372.photobucket.com/albums/ag351/lawda/WP_20140329_002_zps0f564921.jpgLocation of my Unitshttp://i1372.photobucket.com/albums/ag351/lawda/WP_20140328_014_zps2c03b3e0.jpghttp://i1372.photobucket.com/albums/ag351/lawda/WP_20140328_016_zps31eeea23.jpghttp://i1372.photobucket.com/albums/ag351/lawda/WP_20140328_017_zps94e0ee9c.jpghttp://i1372.photobucket.com/albums/ag351/lawda/WP_20140328_018_zpsa94b77fa.jpg Edited April 8, 2014 by lawda Share this post Link to post Share on other sites
lawda 2 Report post Posted April 8, 2014 (edited) Update on the ceiling works and tiling done last week:Ceiling works at the 2 rooms:http://i1372.photobucket.com/albums/ag351/lawda/WP_20140405_006_zps78a9c714.jpghttp://i1372.photobucket.com/albums/ag351/lawda/WP_20140405_009_zpsd44de1e5.jpghttp://i1372.photobucket.com/albums/ag351/lawda/WP_20140405_008_zps53ca58cd.jpghttp://i1372.photobucket.com/albums/ag351/lawda/WP_20140405_005_zps93152312.jpgCeiling works at MBRhttp://i1372.photobucket.com/albums/ag351/lawda/WP_20140405_012_zpsefa69233.jpghttp://i1372.photobucket.com/albums/ag351/lawda/WP_20140405_011_zps278187ba.jpghttp://i1372.photobucket.com/albums/ag351/lawda/WP_20140405_010_zps8d765eee.jpgCeiling work at Walkway to roomshttp://i1372.photobucket.com/albums/ag351/lawda/WP_20140405_007_zps479338be.jpgCeiling works Living/Dining http://i1372.photobucket.com/albums/ag351/lawda/WP_20140405_018_zpsba1fb7fe.jpghttp://i1372.photobucket.com/albums/ag351/lawda/WP_20140405_015_zps28d58157.jpghttp://i1372.photobucket.com/albums/ag351/lawda/WP_20140405_014_zpsee358e29.jpghttp://i1372.photobucket.com/albums/ag351/lawda/WP_20140405_013_zps6988e407.jpgTiling works completed last week (in progress)http://i1372.photobucket.com/albums/ag351/lawda/WP_20140407_007_zps2db67f75.jpghttp://i1372.photobucket.com/albums/ag351/lawda/WP_20140407_006_zps9786956a.jpg Edited April 8, 2014 by lawda Share this post Link to post Share on other sites
lawda 2 Report post Posted April 12, 2014 (edited) Had city gas came to install the pipe. It was job well done by the friendly uncle within a short span of time. Pipe are tucked as close to the wall and corner marked by ID. Some pictures of the installation:http://i1372.photobucket.com/albums/ag351/lawda/WP_20140412_014_zpse442a0c1.jpghttp://i1372.photobucket.com/albums/ag351/lawda/WP_20140412_017_zps28a7cd67.jpghttp://i1372.photobucket.com/albums/ag351/lawda/WP_20140412_018_zps1375633e.jpgSome update on the progress for the week:Tiles are almost completed with only skirting left to be done living room;http://i1372.photobucket.com/albums/ag351/lawda/WP_20140412_034_zps82e30564.jpghttp://i1372.photobucket.com/albums/ag351/lawda/WP_20140412_033_zps7ded7d75.jpghttp://i1372.photobucket.com/albums/ag351/lawda/WP_20140412_030_zps46f9cac8.jpghttp://i1372.photobucket.com/albums/ag351/lawda/WP_20140412_029_zps9e1a09c7.jpgKitchen cabinets' bases are almost done too:http://i1372.photobucket.com/albums/ag351/lawda/WP_20140412_020_zps694b4320.jpghttp://i1372.photobucket.com/albums/ag351/lawda/WP_20140412_019_zpsd0c51321.jpgID gave me a surprise with his good gesture and taste. He actually upgraded my plain original colour aluminium grille to white coloured powered (slightly costly) just to ensure the overall design looks good http://i1372.photobucket.com/albums/ag351/lawda/WP_20140412_008_zps0c4c9138.jpgWindow grilles are up for most of the rooms, living and yardhttp://i1372.photobucket.com/albums/ag351/lawda/WP_20140412_022_zpsf6590d5a.jpghttp://i1372.photobucket.com/albums/ag351/lawda/WP_20140412_026_zps7f750522.jpghttp://i1372.photobucket.com/albums/ag351/lawda/WP_20140412_031_zps6778c030.jpghttp://i1372.photobucket.com/albums/ag351/lawda/WP_20140412_013_zpsd40a79c9.jpgSlope at main gate demolished for tilinghttp://i1372.photobucket.com/albums/ag351/lawda/WP_20140412_024_zpsb9a821bf.jpg Edited April 12, 2014 by lawda Share this post Link to post Share on other sites
lawda 2 Report post Posted April 12, 2014 Got my 3D design this afternoon for MBR, bathroom2 and living room. Love it and it's up to our expectation. Can't wait for the revised kitchen and bathroom 1! Living Roomhttp://i1372.photobucket.com/albums/ag351/lawda/Blk315living_zps8cf0161d.jpgMBRhttp://i1372.photobucket.com/albums/ag351/lawda/Blk315mainbedvw1_zps0eb4e5bf.jpghttp://i1372.photobucket.com/albums/ag351/lawda/Blk315mainbedvw2_zps3a35cac7.jpghttp://i1372.photobucket.com/albums/ag351/lawda/Blk315mainbedvw3_zps1c3f8d80.jpgBathroom2http://i1372.photobucket.com/albums/ag351/lawda/Blk315bath2_zps5a907f0c.jpg Share this post Link to post Share on other sites
Troublemaker 31 Report post Posted April 12, 2014 Wow! Quite good! Lotsa stuff done! I like the white window grilles! Share this post Link to post Share on other sites
lawda 2 Report post Posted April 12, 2014 Wow! Quite good! Lotsa stuff done! I like the white window grilles! Thanks! i was surprised when i saw it this morning and whatapps my ID. he said he upgrade them to white to make the overall design look good. Share this post Link to post Share on other sites
Troublemaker 31 Report post Posted April 12, 2014 White is nice! It brightens up the whole place. But of course, have to keep it clean at all times... Share this post Link to post Share on other sites
lawda 2 Report post Posted April 24, 2014 Was away for 10 days and didn't manage to liaise closely with ID on the carpentry design. However, ID did email me the design for the kitchen. As for bathroom 1, measurement and site visit has been done by carpentry. Will be providing my 3D design soon.Had long discussion with ID yesterday on paint selection and the carpentry design. Hope output will be great!Kitchenhttp://i1372.photobucket.com/albums/ag351/lawda/Blk315kitchen_zps4e80cc9d.jpg Share this post Link to post Share on other sites
lawda 2 Report post Posted April 29, 2014 Nothing was basically done over the weekend when i went back to check my unit but was kinda surprised during yesterday evening visit - lights are installed (not completed - outstanding LEDs and T5 lights). Took the opportunity to check out the tiles and marked out all issues i found for my ID to follow up before carpentry. Spent a good 2hrs yesterday to check and mark out the areas. Window grilles are all completed for the missing portion @ living, MBR and the access to a/c ledge. First coat of chosen paint are up and more to come..... Pictures to show on the progress Living room with different moods from the led lights (pending remaing leds and cove lightings) + completed grilleshttp://i1372.photobucket.com/albums/ag351/lawda/WP_20140429_0011_zps8607d4d6.jpg (cool blue) http://i1372.photobucket.com/albums/ag351/lawda/WP_20140429_0021_zps083a159a.jpg (warm white) http://i1372.photobucket.com/albums/ag351/lawda/WP_20140429_0031_zps83494593.jpg (day light) Cove light @ walkwayhttp://i1372.photobucket.com/albums/ag351/lawda/WP_20140429_0041_zpsf5ea04a8.jpgLighting in bedroom 1 & 2http://i1372.photobucket.com/albums/ag351/lawda/WP_20140428_0011_zps7e668ed2.jpghttp://i1372.photobucket.com/albums/ag351/lawda/WP_20140428_0021_zpsf9e665c9.jpghttp://i1372.photobucket.com/albums/ag351/lawda/WP_20140428_0041_zps0bee6115.jpghttp://i1372.photobucket.com/albums/ag351/lawda/WP_20140428_0071_zps7f136b58.jpghttp://i1372.photobucket.com/albums/ag351/lawda/WP_20140428_0081_zpsc09c2836.jpgOutstanding grilles installed at MBR and a/c ledgehttp://i1372.photobucket.com/albums/ag351/lawda/WP_20140429_0051_zps075ada1c.jpghttp://i1372.photobucket.com/albums/ag351/lawda/WP_20140429_0061_zpsf743d80f.jpg Share this post Link to post Share on other sites
lawda 2 Report post Posted May 6, 2014 Had some issues with the grout lines and had ID & PM to resolve before the carpentry is in this week. Had meeting with PM to verify the stuff completed last evening and notice the doors are installed. Looks good and to my liking... Doors for the rooms:http://i1372.photobucket.com/albums/ag351/lawda/WP_20140506_0071_zps29fe0970.jpgDoor installed for the common toilethttp://i1372.photobucket.com/albums/ag351/lawda/WP_20140506_0101_zpsbd4454ff.jpg Share this post Link to post Share on other sites
Troublemaker 31 Report post Posted May 6, 2014 Are you installing wooden doors for toilet? Do be careful. I gotta change my wooden toilet doors to aluminium doors because the door and door frame have disintegrated as the previous owner did not take care of the doors! Share this post Link to post Share on other sites
lawda 2 Report post Posted May 6, 2014 (edited) Are you installing wooden doors for toilet? Do be careful. I gotta change my wooden toilet doors to aluminium doors because the door and door frame have disintegrated as the previous owner did not take care of the doors! yes, i did the wooden door for common toilet but i did a segregation between wet and dry area. Hope it will help to prevent the door from decaying and disintegration. BTW, my door frame is metal from HDB, not the wooden frame type you mentioned.Am installing glass door for the MBR toilet though. Edited May 6, 2014 by lawda Share this post Link to post Share on other sites
enadee 2 Report post Posted May 6, 2014 Hi there..I believe u r a fellow 5rm Greenwalker, judging frm ur background pics...Me too... Which blk r u @...? I'm @ blk 318b, waiting for HLE approval..Anyway, care to share ur ID details..? Share this post Link to post Share on other sites
lawda 2 Report post Posted May 7, 2014 yup, pm youHi there..I believe u r a fellow 5rm Greenwalker, judging frm ur background pics...Me too... Which blk r u @...? I'm @ blk 318b, waiting for HLE approval..Anyway, care to share ur ID details..? Share this post Link to post Share on other sites