smiley73 0 Report post Posted March 23, 2014 Here my quotation to share,A. WWSupply labour and material to construct washing machine and fridge base with tiles finishing and skirting $350Supply labour and material to construct kitchen cabinet base $320Supply labour to lay wall tiles till ceiling at kitchen $3.8 -$1758Supply material wall tiles for kitchen $2.6 -$1326Supply labour material to lay homogeneous tiles at kitchen floor include 1 layer H2Oproofing $1250Supply labour to lay heavy duty homogeneous tiles floor for living and dining store rm with skirting $3.8-$3344Supply material heavy duty homogenous tiles for living and dining store rm $3.4 - $3502Supply labour for skirting living and 3 bedrm $350Supply labour to lay wall tiles for 2 toilet $3.8- $1710Supply material wall tiles for 2 toilet $2.8 - $1372Addition tiles cost for MBR $490Supply labour material lay homogeneous tiles at flor 1 layer of H2Oproofing and 180 H2Oproof screed for 2 toilet$1300Ceiling WorkPainting whole unit piping doors frame $1600Supply labour material construct L box cum false ceiling and cove light for living and dining $1950Supply labour material construct L box cum false ceiling and cove light for MBR $1250Supply labour material construct L box for bedrm 2 including cabinet box $700Supply labour material to contruct partition wall between MBR and Bedrm 2 $480Supply labour and material to change solid door and frame for 3 room $530 - $1590Acid washing whole unit $200Supply labour material install 10mm thk frameless temper glass shower screen MBR $800Electrical33 lighting point 33 install light $10 14 13amp double 2 13amp single D/B box 2 2 Scv 1 Air con point 2 heater point 2 Earth wire1 lot sub main cable 1 tel point2 cat 62 way pointFan point2 20amp isolatorTotal $4090PlumbingSupply labour and material change existing piping to new stainless steel pipe for kitchen and toilets $750Supply labour and material to install inlet and outlet for washing machine and sink $120Supply labour install WC and basin for 2 toilet $400Supply labour material install 4 nos of hot point for 2 toilet $360Supply labour material to install granite top as a vanity for MBR $750Install rain shower set MBR $100CarpentryFabricate laminated with ABS trimming kitchen cabinet 15 ft $1725Fabricate laminated with abs trimming kitchen cabinet top 19.5 ft $2242.5Supply labour material install glass backing $850Granite top for kitchen cabinet 15ft $2100Fabricate tv console cum feature wall 10ft $2950Shoe cabinet 3.5 ft $980Fabricate laminated build in wardrobe with swing door internal colour PVC Finishing 11ft $2750Fabricate laminated hanging cabinet under vanity including mirror at MBR $1400HackingHack existing kitchen floor/wall tilesHack existing WC and basin 2 toiletHack existing 2 toilet door and frame Hack existing living bedrm floor tilesHack existing door frame and doorHack exist kitchen cabinetTotal $3600Up lift good clear debris and supply sand $600Hack existing 1 wardrobe 1 shoe cabinet and tv console pillar platform $700Hack false ceiling / cornices for whole unit $400Hack opening for MBR $80Total est cost $52779.5 before neg discount Excluding adding pd door for 2 toilet and kitchen Share this post Link to post Share on other sites
ContractorPrice 7 Report post Posted March 23, 2014 Is yours a landed property? i saw 2 DB box..You can try neg down to $48500.. Share this post Link to post Share on other sites
smiley73 0 Report post Posted March 24, 2014 (edited) Is yours a landed property? i saw 2 DB box..You can try neg down to $48500..Typo error on my topic HDB 5 rm flat Edited March 24, 2014 by smiley73 Share this post Link to post Share on other sites
christss96 0 Report post Posted March 24, 2014 Hi,Can you pm me if you found good id? thks! Share this post Link to post Share on other sites
smiley73 0 Report post Posted March 24, 2014 (edited) Hi,Can you pm me if you found good id? thks!This my 3rd Reno works with this contractor, good working attitude and provide after Reno service if I encounter some issue after taking over post here to share so that you able to take my quote for reference to compare. Edited March 24, 2014 by smiley73 Share this post Link to post Share on other sites
Le0nHart 1 Report post Posted March 24, 2014 Hi, is this contrator or ID? Share this post Link to post Share on other sites
smiley73 0 Report post Posted March 24, 2014 Contractor Share this post Link to post Share on other sites
tanmeng 4 Report post Posted March 24, 2014 The prices look a bit steep as well. Might be good to seek a second opinion. Share this post Link to post Share on other sites