ashleeee 0 Report post Posted March 7, 2014 Hi all,I have gotten my keys and will be starting renovation soon.As I was looking at HDB website under renovation works and I saw this:Laying of floor finishes on bare (rough) concrete surface provided by HDB.No permit required.Floor finishes must be laid on bare (rough) concrete surface provided by HDBThere must not have an existing cement screed originally provided by HDBTotal thickness of floor finishes and screed must not exceed 50 mm.Does that mean that I do not need a permit to start laying my tiles? I did not opt for any flooring for my flat.Many thanks! Share this post Link to post Share on other sites
bepgof 20 Report post Posted March 7, 2014 Lay yourself no need, if no one complaint. The lift swee swee, floor clean clean, etc.If by contractor, he sure advise to get one. Share this post Link to post Share on other sites
kangeroo168 10 Report post Posted March 8, 2014 yes of cos you need a permit for that!! and must be HDB approved permits. Share this post Link to post Share on other sites