Bryanang89 0 Report post Posted March 6, 2014 Hi all would like to have some advice on the mentioned quote. Seems reasonable to me however would like to hear from more Masonry work1) construct 50mm height cabinet base with tiles skirting $2802) construct 50mm height fridge and washing machine base $2003) construct 50mm shower kerb to both bathroom $ 2604) supply and overlay non slip homo tiles for both bathroom $1100Plumbling work1) supply labour to lay inlet and outlet pipe to kitchen area $2002) supply labour to install vanity cabinet and sink to master bathroom $1203) install 2 jet spray FocGlass work1) 2x 10mm thick tempered glass shower screen to both bathroom $11002) 10mm thick tempered glass sliding door to kitchen entrance $9003) install tempered glass to kitchen $500Ceiling work1) false ceiling to living dining and passage way 320sqft $13002) false ceiling to main bedroom 120 sqft $6503) false ceiling to bedroom 2 70 sqft $5004) false ceiling to bedroom 3 70sqft $500Electric works1) supply and lay 26 lightings point include installation of plc downlights $1250Carpentry works1) 24ft solid plywood kichen cabinet with abs trimming $31202) 11ft indian granite worktop $12003) 6.5ft full height wardrobe sliding in laminate finish $18204) 5.5ft full height wardrobe sliding in laminated finish $15405) 7ft tv wall feature and console in laminated finish $21006) 14ft full height bomb shelter feature wall design with tictac and sliding door infront $32007) 4ft full height shoe cabinet with display laminated finished $1200Mic work1) chemical washing $250Price $ 23500 Share this post Link to post Share on other sites
Huiqing He 7 Report post Posted March 6, 2014 Hi Bryan, This seems reasonable, can share your contractor contact? Share this post Link to post Share on other sites
Devilaz 0 Report post Posted March 6, 2014 Carpentry works elaborate from them seems not clear.Hi all would like to have some advice on the mentioned quote. Seems reasonable to me however would like to hear from more Masonry work1) construct 50mm height cabinet base with tiles skirting $2802) construct 50mm height fridge and washing machine base $2003) construct 50mm shower kerb to both bathroom $ 2604) supply and overlay non slip homo tiles for both bathroom $1100 - dimension per tiles?Carpentry works - check the laminated finish. does it also apply within the carpentry works you are doing?1) 24ft solid plywood kichen cabinet with abs trimming $3120 - this part is too general. ask your ID or contractor to elaborate more. example soft hinges, etc etc..2) 11ft indian granite worktop $12003) 6.5ft full height wardrobe sliding in laminate finish $1820 - does this meant that the wardrobe is sliding door?4) 5.5ft full height wardrobe sliding in laminated finish $15405) 7ft tv wall feature and console in laminated finish $21006) 14ft full height bomb shelter feature wall design with tictac and sliding door infront $3200 - not sure how it looks but 14ft is around 4.3m which cost around $3,2k which is very pricey.7) 4ft full height shoe cabinet with display laminated finished $1200 - 4ft which is around 1.2m as for this find it a pricey.Mic work1) chemical washing $250what about the rest? They do know clear debris, Provide corrugated paper protection to flooring, General cleaning upon completion of works? Share this post Link to post Share on other sites
Bryanang89 0 Report post Posted March 6, 2014 Carpentry works elaborate from them seems not clear.Hi there thanks for replying. For carpentry, internal is using those white carcass pvc. Shoe cabinet yes is a little pricey i see what i can do haha. For the rest, ii did not state everything however will check on the one u stated. Share this post Link to post Share on other sites
Devilaz 0 Report post Posted March 7, 2014 It will be good to state in the list. As once sign they can turn the words due to it is not in the list.Hi there thanks for replying. For carpentry, internal is using those white carcass pvc. Shoe cabinet yes is a little pricey i see what i can do haha. For the rest, ii did not state everything however will check on the one u stated. Share this post Link to post Share on other sites
mama01 3 Report post Posted March 7, 2014 Hi,Can pm the contractor detail?Thanks. Share this post Link to post Share on other sites
Fel2112 0 Report post Posted April 1, 2014 Can PM me your ID. Thanks. Share this post Link to post Share on other sites
jchin1228 1 Report post Posted April 3, 2014 Hi,Some items are cheaper than mine and some are more expensive.Mind to share with me your ID or contractor?Something that I learn while I am looking for ID.1. There will be haulage fees.2. Does your contractor supply the tiles for the tiles skirting?3. Electric Installation is a bit expensive for me although I have not receive any quotation for that.4. Lighting has to be purchased by ourselves and installation of lighting may be another cost.5. Will you be installing air-con? Air-con installation charges?6. You are charged with labour to install vanity cabinet and sink but there is no charges for the cabinet itself?7. I was charged $700 for 3ft shoe cabinetIs your ID / contractor HDB licensed and RADAC accredited? Share this post Link to post Share on other sites