I'm in the process of planning for an A&A for my semi D.

I've engaged a designer to carry out the architectural drawing, PE calculation, BCA & URA submission ,...

I've done soiltest and the PE confirmed no pilling work is required for me to add an attic above my 2 storey house.

Can anyone kindly tell me what is the current market rebuild cost based on psf for the additional GFA for attic (less than 1000sqft)?

Thanks.

 
  • Like 1

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request

Hi sillbeers,

We have quite a few A&A projects ranging from $180 to $250 psf depending on the choice of finishes.

I believe besides adding the new Gfa, u will also need to renovate the existing finishes. Will be glad to show u the houses we have done and also provide you with the budgetary estimate of the building cost.

pm me if u r interested

 

Share this post


Link to post
Share on other sites

Hello, I can recommend the contractor my family and I used. very efficient and economical. pm if you want his contact details!

 

Share this post


Link to post
Share on other sites
  On 3/14/2014 at 10:09 AM, homebuilder said:

Hi sillbeers,

We have quite a few A&A projects ranging from $180 to $250 psf depending on the choice of finishes.

I believe besides adding the new Gfa, u will also need to renovate the existing finishes. Will be glad to show u the houses we have done and also provide you with the budgetary estimate of the building cost.

pm me if u r interested

homebuilder,

Typically what does $180 to $250 psf include?

Does it include below all or partial (which partial?) on an 80sqm Attic addition over 2 storey house w/o additional pilling needs?

1 Steel Structure +reinforcements + RC flooring

2 All external & internal partition walls (brickwall cw. plaster) over 2 bedrooms, 1 bath and common area

3 Glass Windows / Glass Sliding Doors

4 Timber doors (indoors)

5 Paquet Floor finish and ceramic tile floor + wall finish (bathroom)

6 Electrical works

7 Plumbling

8 50sqm balcony @ attic level (Steel Structure +reinforcements + RC flooring with ceramic tile finish) not included in GFA

9 Roof structure, insulation Roof tiles

Edited by sillbeers15
 

Share this post


Link to post
Share on other sites

HI sillbeers,

Yes the cost will include :

1, Structural works (except piling) including roofer's works

2. Architectural works - Brickwork, floor & wall finishes, ceiling finishes, painting, internal timber doors , aluminium windows/ doors etc.

3. M & E works - plumbing (including sewerage) & electrical works

PM me if you hv any other query

 

Share this post


Link to post
Share on other sites

Was quoted $650k for a recon from 2 sty to 3+roof terr.

Excludes submission fees, all floor tiles and wall tiles.

Was asked to place a 60k deposit fee to sign a contract for the team to start architecture design, layout planning, 3D drawings, and then the final quotation. The deposit will be accompanied with a list of what the $650k covers, just a general list of material used.

Is this practice of a deposit fee before company starts work a common one?

 

Share this post


Link to post
Share on other sites
  On 4/1/2014 at 4:41 PM, MetalTab said:

Was quoted $650k for a recon from 2 sty to 3+roof terr.

Excludes submission fees, all floor tiles and wall tiles.

Was asked to place a 60k deposit fee to sign a contract for the team to start architecture design, layout planning, 3D drawings, and then the final quotation. The deposit will be accompanied with a list of what the $650k covers, just a general list of material used.

Is this practice of a deposit fee before company starts work a common one?

hihi, dun mind if can share the company too and the list of work proposed?

 

Share this post


Link to post
Share on other sites
  On 3/24/2014 at 2:56 AM, sillbeers15 said:

homebuilder,

Typically what does $180 to $250 psf include?

Does it include below all or partial (which partial?) on an 80sqm Attic addition over 2 storey house w/o additional pilling needs?

1 Steel Structure +reinforcements + RC flooring

2 All external & internal partition walls (brickwall cw. plaster) over 2 bedrooms, 1 bath and common area

3 Glass Windows / Glass Sliding Doors

4 Timber doors (indoors)

5 Paquet Floor finish and ceramic tile floor + wall finish (bathroom)

6 Electrical works

7 Plumbling

8 50sqm balcony @ attic level (Steel Structure +reinforcements + RC flooring with ceramic tile finish) not included in GFA

9 Roof structure, insulation Roof tiles

Hi Sillibeers,

For the above mentioned works, we can do it at $160 - $230 psf. Please contact us at 6694 0480 if you need any further information.

 

Share this post


Link to post
Share on other sites
  On 4/2/2014 at 2:23 AM, creative_vitamin said:

hihi, dun mind if can share the company too and the list of work proposed?

This is just a ballpark figure, not a quotation.

The builder wants me to put a $60k deposit before they start the archi drawings, and then the quotation will follow.

 

Share this post


Link to post
Share on other sites
  On 4/2/2014 at 4:22 AM, MetalTab said:

This is just a ballpark figure, not a quotation.

The builder wants me to put a $60k deposit before they start the archi drawings, and then the quotation will follow

i think this maybe abit subjective?

if the final quotation is high, are you able to get 60K back?

 

Share this post


Link to post
Share on other sites
  On 4/2/2014 at 8:16 AM, creative_vitamin said:

i think this maybe abit subjective?

if the final quotation is high, are you able to get 60K back?

They will keep the quote at $650k and the types of material used will be specified. Note that this $650k excludes submissions, tiles, lights, wardrobe, cabinet, sanitary fixtures, water mixers. And all in, it would be $650k + $200k for a 3+roof terrace.

If at any point I pull out, I will lose the $60k.

Wonder if anyone has experienced this - pay about 10% before they start work...

 

Share this post


Link to post
Share on other sites

Thank all for providing me valuable information for consideration.

I have finally gotten approval from URA for Recon instead of A&A due to bother line GFA increments and have decided on the builder to erect a 3rd storey for my existing 2 storey semi-d.

The agreed cost of build came to 600k excluding submissions, architect cost, PE cost & Aircon for a complete make over for the entire house.

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×