Sokind 0 Report post Posted February 11, 2014 Hi,Need advice.What is the pro and cons of a quotation with individual item breakdown cost and a quotation with lump sum cost with no breakdown cost at all.Both provide the same item.TIA Share this post Link to post Share on other sites
claypot 46 Report post Posted February 11, 2014 With breakdown items, you can opt to exclude certain items during the renovation phase. For example, after signing the quotation, you later changed your mind, and decide not to do the feature wall, you can remove it and that cost will be excluded (provided you inform the ID in advance before they fabricate the carpentry).Individual item breakdown also make the actual cost e.g. psf clearer and would minimize dispute. Quotation is mostly based on floor plan, but floor plan may not be accurate, as after signing, the ID would go onsite to your flat to do actual measurement. Share this post Link to post Share on other sites
Sokind 0 Report post Posted February 12, 2014 Hi claypotthanks for your input Share this post Link to post Share on other sites