4ddd 18 Report post Posted June 12, 2014 That's a big wardrobe! And many doors too...everything looking great! Share this post Link to post Share on other sites
guojiawen 101 Report post Posted June 13, 2014 Renovation Day 55 - 12 JuneMore updates on our carpentry work The other view of my wardrobe with work in progress top compartments.Study table up and drawer in the midst of fabrication. We will be placing a glass cover on top of this table to prevent stains / scratches etc.Our kitchen cabinet doors were all up too.Bosch built in oven placed into its slot!Think the next step should be granite top installation followed by glass backsplash installation?Hubby was looking through the updates sent by our ID and went... wah, our carpentry so white? and i had to remind him that's actually already off-white, it can be even whiter! 1 Share this post Link to post Share on other sites
guojiawen 101 Report post Posted June 13, 2014 That's a big wardrobe! And many doors too...everything looking great! Thanks! I'm so looking forward to the end products of renovation already Share this post Link to post Share on other sites
yan01 29 Report post Posted June 13, 2014 i'm looking forward too! v clean looking kitchen u hv there!Thanks! I'm so looking forward to the end products of renovation already 1 Share this post Link to post Share on other sites
Xiej0007 12 Report post Posted June 13, 2014 Thanks!Saw your 2nd set of 3D drawings, looking good too! Have you gotten your keys yet? Remember ur collection is around June?It has been a month since our hle is approved. Can't wait for reno to get started 1 Share this post Link to post Share on other sites
ScarFace 0 Report post Posted June 13, 2014 Can. PM your ID. Contract? Thanks Share this post Link to post Share on other sites
regsigin 1 Report post Posted June 14, 2014 Hi guojiawen,May I know who is your ID ? from which company ? If no mind kindly pm me.Thanks. Share this post Link to post Share on other sites
guojiawen 101 Report post Posted June 14, 2014 Can. PM your ID. Contract? ThanksHi guojiawen,May I know who is your ID ? from which company ? If no mind kindly pm me.Thanks.PM-ed Share this post Link to post Share on other sites
ShinChan 0 Report post Posted June 14, 2014 Hi JiaWen,Can i know how much u bought your LED downlight?and where do u got it from?Thank you, Share this post Link to post Share on other sites
jessangel 0 Report post Posted June 14, 2014 Hi Jiawen, can pm me your ID contact? Thanks! Share this post Link to post Share on other sites
mysapporo 0 Report post Posted June 15, 2014 Hi Jiawen, Very nice renovation! Congrats! Could you let me have the details of your ID? Thanks!! Share this post Link to post Share on other sites
guojiawen 101 Report post Posted June 15, 2014 Hi Jiawen, can pm me your ID contact? Thanks!PM-ed Hi Jiawen, Very nice renovation! Congrats! Could you let me have the details of your ID? Thanks!!Thanks! PM-ed you too Share this post Link to post Share on other sites
guojiawen 101 Report post Posted June 15, 2014 Hi JiaWen,Can i know how much u bought your LED downlight?and where do u got it from?Thank you,Hi ShinChan,I bought my LED downlights from Choon Ying Trading for $30 per piece. They come with 1 year warranty. If you are adventurous enough, will suggest buying from TB or even from reputable shops in Malaysia as it is a lot cheaper than buying from Singapore based lighting shops. Only con is that they do not come with warranty or even if the Malaysia ones do, will have to make the trip in to exchange.There are various renotalk t-bloggers that provide the relevant info for them.Hope this helps 1 Share this post Link to post Share on other sites
4ddd 18 Report post Posted June 15, 2014 Easier to clean with white kitchen! Share this post Link to post Share on other sites
guojiawen 101 Report post Posted June 17, 2014 Some Updates!ID informed the remaining work to be completed:- Shoe cabinet / divider- Granite top installation- Backsplash installation- Bedside tables- Display shelving beside my study table- Toilet vanity cabinets (the glitter grey coloured aluminium doors chosen are out of stock and only coming in end of the mth)- Cabinet in service yardHe will be helping me install the following FOC when we're back in July:- Chandelier- Mount TV- Digital lock- Bathroom accessoriesSo everything will likely be completed latest by end July and then I will start to TB the home deco and all other stuff we need in the new home!And... I will be able to take photos myself to show you guys by mid July! Meanwhile I got to survive my exams... Share this post Link to post Share on other sites