Lau Yong 0 Report post Posted February 1, 2014 (edited) Gong Xi Fa Cai to all!I'm taking up half a HDB shop (currently is a full shop, will be split) and is confused by different advice. Hope fellow forumers here can shed some light if you have any experience with HDB shops.The shop - 3 Phase / 240V / 30Amp supplyQuestion - After installing a new electricity meter for my side of the shop to keep track of my power usage (SingPower billing), will the 30Amp be divided between 2 shops? Or will each of us still have 30Amp each for usage? I called SingPower, the operator doesn't know... Edited February 1, 2014 by imamiah Share this post Link to post Share on other sites
Pelect 3 Report post Posted February 2, 2014 Gong Xi Fa Cai to all!I'm taking up half a HDB shop (currently is a full shop, will be split) and is confused by different advice. Hope fellow forumers here can shed some light if you have any experience with HDB shops.The shop - 3 Phase / 240V / 30Amp supplyQuestion - After installing a new electricity meter for my side of the shop to keep track of my power usage (SingPower billing), will the 30Amp be divided between 2 shops? Or will each of us still have 30Amp each for usage? I called SingPower, the operator doesn't know...I doubt it will be split. 30A is already at the low end. Share this post Link to post Share on other sites
Lau Yong 0 Report post Posted February 2, 2014 I doubt it will be split. 30A is already at the low end.Thanks Pelect. If I read correctly from Singapore Power website, 3 phase is 30A/60A/100A.... what you say might be true You happen to be a Licensed Electric Worker certified for sub-meter installation application? Share this post Link to post Share on other sites