13. Shower Kerbs --- Headache 2 : HDB's contractor gave us wrong tiles (Kitchen's!) on a Saturday and went on urgent leave. No one could help to exchange for the correct tiles. As the tiler was already there and colour is still grey... I made a stupid decision and we went ahead to use. :furious: Silly me, I know .... but... it did not turn out that bad la... console me :bow: ! console me! :~

Common bath

Common%2520Bath%2520Kerb.jpg

Master bath

Master%2520Bath%2520Kerb.jpg

I hope I won't make anymore silly mistakes.....

Coming week:

1. Ceiling Fans Installation

2. Carpentry for kitchen and bathroom

3. Reconfiguration of Track-lights

4. Painting (Nippon Sail White for whole house and Tender for baby's room)

5. Shower screen and bathroom full length mirror installation

Have a great week ahead!

Edited by SuperMama
 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request

Updates..... not really a happening week I must say, quite a few of stumbling blocks and I felt a tad disheartened...

This week (end Feb):1. Cement Screed by HDB contractor - Completed on Monday2. Kitchen Base + Carpentry (next week)3. Laminate Flooring for whole house (TBA after painting only)4. Painting by another contractor (confirmed 9th Mar; unbelievable price!!!! I will review and recommend if he is good.)5. Air-con installation - 27th Feb (completed - trunking all nicely done :good: )

6. Taobao order #1 via Amcon - delivered on 27th Feb, although CS was so-so, they are super fast! Will use again if needed.

7. Purchase of other lights

8. Ikea shopping (postponed to post-renovation)

9. Delivery of Kitchen/Bathroom accessories from Hoe Kee (delivered on 1st Mar)

10. Delivery of Hob, hood, fans, etc. (delivered on 1st Mar)

11. Arrival of Samsung lock from Qoo10---> received a scratched unit (DEEP ONE) & less items :jail: , awaiting seller to respond!, too troublesome to send back so I'll live with the ugly scratch on the panel :(

12. Lights installation - see below...

Foyer light from Taobao --> I love it, bought another for my walkway

Foyer.jpg20140228_182436_resized.jpg

Dining Pendant light from Ikea

20140228_182135_resized.jpg

Baby's room light from Philips

20140228_182239_resized.jpg

Light for other areas are pretty functional so nothing to show la....

Master Bedroom : A preview of the LED tracklights from TB ---> Headache 1 :( : I didn't buy connectors and enough tracks for the whole house and these cannot be cut... so electrician and ID will reconfigure with what they have on hand next week. Lucky they never 8| Anyway, room is bright enough using the tracklights. I love the AWESOME effect, so cosy :dribble: ! We are going to place 2 x 3m tracks instead to distribute the light evenly. Shorter tracks will be moved to the dining area which is half-done now. Can't wait to switch on ALL the tracklights and see the effect :D

Master.jpg

Continue to Page 4 for shower kerbs.....

Can pm me the link/cost/contact for your awesome white track lights Pls?

 

Share this post


Link to post
Share on other sites

Grey is nice. Dirt is less obvious.

Thanks for consoling me! Haha.

just paint your shower curbs white? will that help?

The floor tiles are grey in a lighter shade. I'm still trying to psycho myself that it's nice......... Edited by SuperMama
 
  • Like 1

Share this post


Link to post
Share on other sites

Hi SuperMama,

Can I have your quotation and ID contacts?

Sent! Good luck! I noticed my ID very busy now but things are still moving. Hardworking chap!

 

Share this post


Link to post
Share on other sites

13. Shower Kerbs --- Headache 2 : HDB's contractor gave us wrong tiles (Kitchen's!) on a Saturday and went on urgent leave. No one could help to exchange for the correct tiles. As the tiler was already there and colour is still grey... I made a stupid decision and we went ahead to use. :furious: Silly me, I know .... but... it did not turn out that bad la... console me :bow: ! console me! :~

Common bath

Common%20Bath%20Kerb.jpg

Master bath

Master%20Bath%20Kerb.jpg

I hope I won't make anymore silly mistakes.....

Coming week:

1. Ceiling Fans Installation

2. Carpentry for kitchen and bathroom

3. Reconfiguration of Track-lights

4. Painting (Nippon Sail White for whole house and Tender for baby's room)

5. Shower screen and bathroom full length mirror installation

Have a great week ahead!

I also had a similar issue with non-matching tiles for my kitchen bases but luckily I spotted it when they have only completed the washer base. I brought it up to my ID and it has been resolved 2 days later.

If you feel it is an eyesore for you, you should just go ahead and ask for the kerbs to be retiled.

 

Share this post


Link to post
Share on other sites

Updates..... not really a happening week I must say, quite a few of stumbling blocks and I felt a tad disheartened...

This week (end Feb):

1. Cement Screed by HDB contractor - Completed on Monday

2. Kitchen Base + Carpentry (next week)

3. Laminate Flooring for whole house (TBA after painting only)

4. Painting by another contractor (confirmed 9th Mar; unbelievable price!!!! I will review and recommend if he is good.)

5. Air-con installation - 27th Feb (completed - trunking all nicely done :good: )

6. Taobao order #1 via Amcon - delivered on 27th Feb, although CS was so-so, they are super fast! Will use again if needed.

7. Purchase of other lights

8. Ikea shopping (postponed to post-renovation)

9. Delivery of Kitchen/Bathroom accessories from Hoe Kee (delivered on 1st Mar)

10. Delivery of Hob, hood, fans, etc. (delivered on 1st Mar)

11. Arrival of Samsung lock from Qoo10---> received a scratched unit (DEEP ONE) & less items :jail: , awaiting seller to respond!, too troublesome to send back so I'll live with the ugly scratch on the panel :(

12. Lights installation - see below...

Foyer light from Taobao --> I love it, bought another for my walkway

Foyer.jpg20140228_182436_resized.jpg

Dining Pendant light from Ikea

20140228_182135_resized.jpg

Baby's room light from Philips

20140228_182239_resized.jpg

Light for other areas are pretty functional so nothing to show la....

Master Bedroom : A preview of the LED tracklights from TB ---> Headache 1 :( : I didn't buy connectors and enough tracks for the whole house and these cannot be cut... so electrician and ID will reconfigure with what they have on hand next week. Lucky they never 8| Anyway, room is bright enough using the tracklights. I love the AWESOME effect, so cosy :dribble: ! We are going to place 2 x 3m tracks instead to distribute the light evenly. Shorter tracks will be moved to the dining area which is half-done now. Can't wait to switch on ALL the tracklights and see the effect :D

Master.jpg

Continue to Page 4 for shower kerbs.....

very pretty foyer lights!

does the design trap dust easily?

 

Share this post


Link to post
Share on other sites

I also had a similar issue with non-matching tiles for my kitchen bases but luckily I spotted it when they have only completed the washer base. I brought it up to my ID and it has been resolved 2 days later.

If you feel it is an eyesore for you, you should just go ahead and ask for the kerbs to be retiled.

The more I looked at it, it's pretty acceptable. Something different! Hurhur. Will decor my toilet to draw attention away... hehe....

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×