Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
claypot

Tam-Pines Head-Dee-Bee 3-Rm Re-Newal Tea-Blog

Recommended Posts

More photos taken last Saturday.

The bifold toilet door at MBR which is lockable at both sides instead of only at the toilet side (this is to prevent someone from entering the MBR from the toilet and vice-versa)

View of the door from MBR:

IMG_4586_zps7e76ab08.jpg

View of the door from the toilet:

IMG_4588_zpsb4ac5f65.jpg

 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

Hello! I just popped in to say that quite a few of the lamitaks that you shortlisted, I also gave serious consideration like ramshackle (and the variants)

One of the laminates I went with was brushed alumina which I really liked. Quite matt which is my preference.

Curious how the ando concrete turns out!

This is how Ando Concrete laminate for the Kitchen cabinet (external) looks like:

IMG_4585_zpsc1b067a6.jpg

IMG_4598_zps34f44269.jpg

unfortunately, the Brightsteel 3177 Kitchen wall looks more blue-ish than greyish on photos.

 

Share this post


Link to post
Share on other sites

Let's look at the internal layout of the kitchen cabinets (top):

Open shelves

IMG_4575_zpse3432631.jpg

Plate & Dish holderIMG_4572_zpsc0ab309b.jpg

IMG_4571_zpsb8bdeaea.jpg

IMG_4570_zps597a4d22.jpg

Tall-shelf with box-up inside to box-up the kitchen drainage pipes

IMG_4569_zpsbaafe342.jpg

Edited by claypot
 

Share this post


Link to post
Share on other sites

All carpentry hinges are BLUM and soft-closing

IMG_4644_zpsae227b84.jpg

Drawers and railing are not BLUM but soft-closing

Edited by claypot
 

Share this post


Link to post
Share on other sites

Study top-hung cabinet was supposed to be 1.5m but shrink to 1.37m

IMG_4630_zpsca45fb3d.jpg

the laminate underneath is glossy so can "reflect" more light from the led strip light

IMG_4624_zpsf908ce6d.jpg

Pending electrician to install the led strip light:

IMG_4642_zpsbde187cd.jpg

 

Share this post


Link to post
Share on other sites

Don't know how the contractors got this bag to store debris, but my Vietnamese friend says that the bag is formerly used as bag for pig's feed

IMG_4620_zpsa7a97c80.jpg

 
  • Like 1

Share this post


Link to post
Share on other sites

Looks like no more scandi theme, and the Kitchen's industrial theme looks half-past-six. But then modern look, and dunno what theme look....

Maybe once the lightings are installed, furniture are delivered, and cleaning is completed, the overall look and feel would be clearer.

Getting tired despite the CNY break. Over the past 8 weeks or so, have to check the contractors' and ID's works, make many decisions including decisions on what electrical appliances, lightings and furniture to buy so that they fit ascetically and are also practical, and balance all that with the budget. I don't have a spouse to help share the load too. Excitement is long dead, just want to quickly finish this and get over with it. This is getting to be a drag.

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×