PocketMonster 0 Report post Posted January 7, 2014 Hi fellow Renotalk users,I need advice on the below quotation for a 3 rm resale flat, is the quotation reasonable? Quotation done by ID. Thanks alot. . 1 Demolishing Works To Supply Labour And Materials To Hack And Dismantle The Existing Following Items :- a) 2 Nos. Sanitary Ware At Borth Common & Master Bathroom 900.00 b) 2 Nos. Wash Basin At Kitchen & Master Bathroom c) 2 Nos. Bi-fold Doors At Both Master & Common Bathroom d) Window Grills For The Whole House e) Windows For The Whole House f) Aluminium Casement Doors Below The Sink & Stove g) Cornices At The Living h) Air-con For 2 Bedrooms 2 Plumbing Works To Supply Labour To a) Install 2 Nos. Sanitary Wares At Both Common & Master Bathroom 400.00 b) Install 2 Nos. Wash Basin & Taps At Kitchen & Master Bathroom c) Replace Existing Piping To Stainless Steel Piping For Whole House 700.00 d) Install 2 Nos. Of Mixer Point At 2 Shower Areas (Hot Water Only) 100.00 e) Labour To Install 2 Nos. Of Mixer Tap At 2 Shower Areas 60.00 f) Labour To Install 2 Nos. Of Hand Shower Set 40.00 g) Labour To Install 2 Nos. Of Chrome Handy Spray C/W Mini-Valve F.O.C. h) Labour To Install Bathroom Accessories F.O.C. 3 Electrial Works To Supply Labour And Materials To a) Rewire Whole House C/W New MCB Box / Standard Power Points / Lighting 1,900.00 Points / SCV Points / Telephone Points And Installation Of Lights (Includes :- Living - 2 Double, 1 SCV, 1 Tel, 1 Doorbell, 1 Lighting Point, M/Bedrm - 1 Lighting Point, 1 Air-con, 1 SCV, 1 Tel, 1 Double, C/Bedrm - 1 Lighting Point, 1 SCV, 1 Tel, 1 Double, Kitchen - 2 Lighting Points, 2 Double, 1 Single, Store - 1 Light M/Bathrm & C/Bathrm - 1 Lighting Point, 1 Heater Point Sub - Total (S$): 4,100.00 Item Description Amt (S$) 3 Electrial Works To Supply Labour To b) Install Additional 8 Nos. Double Points (Living - 1, M/Bedrm - 1, C/Bedrm - 3, 560.00 Kitchen - 2, Store Room - 1) c) Install Additional 4 Nos. Single Points (Living - 2, M/Bedrm - 2) 200.00 d) Install Additional 4 Nos. Lighting Points For "L" Box Lighting 152.00 e) Install 2 Nos. Cat 6 Data Points At Master & Common Bedroom 200.00 f) Install 1 No. Lighting Point Infront Of Store Room 38.00 4 Painting Works To Supply Labour And Materials To Paint Whole House Using ICI / Nippon 1,200.00 Emulsion Paint. 5 Door Works To Supply Labour And Materials To a) Install 2 Nos. Bi-Fold Doors At Both Common & Master Bathroom 600.00 b) Install 9 Nos. Aluminium Casement Doors Below The Sink & Stove 800.00 6 Aluminum Window Grilles Work To Supply Labour And Materials To a) Install Window Grilles (Silver / Bronze) For Living, Master & Common 750.00 Bedroom & Kitchen b) Install Windows (Silver / Bronze) For Whole House - (Casement - Living, 2,600.00 Master & Common Bedroom, Kitchen, 2 Bathrooms (Adjustable Louvre) With Tinted Blue Glass 7 Plastering Works To Supply Labour And Materials To a) Plaster The Whole House Wall & Ceilings Including Kitchen & 2 Bathrooms 1,950.00 Ceiling 8 False Ceiling Works To Supply Labour And Materials To a) Erect "L" Box **** Room 900.00 b) Install False Ceiling Infront Of Store Room 300.00 c) Seal-Off The Opening Above The Door Frame For 2 Bedrooms & Store Room 750.00 9 Carpentry Works To Supply Labour And Materials To Kitchen Area a) Construct 20ft Top Kitchen Cabinet Using Solid Plywood C/W Dish Rack With 2,700.00 Laminate Finishing And ABS Trimming b) Box-Up Kitchen Sewage Pipe Using Solid Plywood 480.00 c) Construct 3ft Full Height Cabinet Using Plywood With Laminate Finishing And 750.00 ABS Trimming Sub - Total (S$): 14,930.00 Item Description Amt (S$) 9 Carpentry Works To Supply Labour And Materials To Master Bedroom a) Construct 17ft Top Cabinet Using Solid Plywood With Laminate Finishing 2,295.00 And ABS Trimming Living a) Construct 3½ft Full Height Shoe Cabinet Using Solid Plywood With Laminate 700.00 Finishing And ABS Trimming Common Bedroom a) Construct 16ft Top Cabinet Using Solid Plywood With Laminate Finishing 2,160.00 And ABS Trimming 10 Others To Supply Labour And Materials To a) Change The Acrylic Panel At Common Bedroom 500.00 b) Change 2 Shelvings Tiles **** Room 400.00 11 General Works To Supply Labour And Materials To a) Apply HDB Permit F.O.C. b) Lay Corrugated Paper Prior For Renovation Works F.O.C. c) General Cleaning Upon Completion Of Renovation Works F.O.C. d) Hoisting Materials And Clear Debris Off Site 400.00 Sub - Total (S$): 6,455.00 Grand - Total (S$): 25,485.00 SINGAPORE DOLLARS: TWENTY FIVE THOUSAND FOUR HUNDRED AND EIGHTY FIVE ONLY. Share this post Link to post Share on other sites
keesiong 0 Report post Posted January 10, 2014 Hi PocketmonsterThese quotation quite reasonable except electrical & carpentry u may need to ask for some discount Share this post Link to post Share on other sites
chihhuahua 0 Report post Posted March 27, 2014 hi can pm me this contractor? his rates seems really reasonable Share this post Link to post Share on other sites