kelsam 1 Report post Posted December 24, 2013 Hi Kelsam,Super like your philips lights. Can I know where you got them and at what price?The kitche stuff too... Thanks.Lights I got from taobao about 1k each after shipping..locally cheapest I can find is 1.9k b4 gstCooker n hob from the electronic store at kallangOven from Meyer 2.2 after adding 2 more years of warranty Share this post Link to post Share on other sites
kelsam 1 Report post Posted December 24, 2013 Heh today contractor retile toilets for me made a mistake on basin outletNo charge just pay for his worker pay heng ah Share this post Link to post Share on other sites
kelsam 1 Report post Posted December 24, 2013 (edited) went ikeagot this for shoe cabinethttp://www.ikea.com/sg/en/catalog/products/20239722/#/80239719mbr bedhttp://www.ikea.com/sg/en/catalog/products/90176311/baby bedhttp://www.ikea.com/sg/en/catalog/products/S69887445/eldest sonhttp://www.ikea.com/sg/en/catalog/products/60247980/ Edited December 24, 2013 by kelsam Share this post Link to post Share on other sites
kelsam 1 Report post Posted December 24, 2013 coming saturday will be busy dayin coming itemssofa and dinning table from whitewoodsfridge from mega discountkitchen sink and mixerbeds from ikeamattress from robinsonsmodular wardrobe by opsh fixing upcarpetssideboardkitchen to be installed on 30thsurface one week laterkivaircon (my mix up)tv (havent decide)tv console (havent decide)doors (taking forever)toilet doors (havent decide) Share this post Link to post Share on other sites
Sappyd 8 Report post Posted December 24, 2013 Can pm ur contractor contact? Super like the black round trunkings.. Share this post Link to post Share on other sites
ifatfat 0 Report post Posted December 25, 2013 Hi, would like to get your contractor's contact too... thanks! Share this post Link to post Share on other sites
inthechouse 8 Report post Posted December 25, 2013 Are you keeping the main gate? I want to keep mine but I was charged quite a lot to rejuvenate it (sand, paint and new lock). Share this post Link to post Share on other sites
kelsam 1 Report post Posted December 25, 2013 Can pm ur contractor contact? Super like the black round trunkings..Electrician I need to check if they are willing to do single flatmine was done as a favor with me only paying for materials..they usually do whole buildings and warehouses.get back to you if they are ok Share this post Link to post Share on other sites
kelsam 1 Report post Posted December 25, 2013 Hi, would like to get your contractor's contact too... thanks! for reno used yapbut this guy is no frills u need to know what u wanthis team of ppl are really good thoughadditional works are charged very low and very well madekitchen contractor commented everything very straight when they used laser measuring for kitchen cabinets Share this post Link to post Share on other sites
kelsam 1 Report post Posted December 25, 2013 Are you keeping the main gate? I want to keep mine but I was charged quite a lot to rejuvenate it (sand, paint and new lock).nope...changed everything that can be changed Share this post Link to post Share on other sites
elvis 0 Report post Posted December 25, 2013 nope...changed everything that can be changedHow much? Is it fire rate door? Can show us? Share this post Link to post Share on other sites
inthechouse 8 Report post Posted December 25, 2013 How much? Is it fire rate door? Can show us?Yup, do share the price of your new gate and door? Share this post Link to post Share on other sites
kelsam 1 Report post Posted December 25, 2013 How much? Is it fire rate door? Can show us?Yup, do share the price of your new gate and door?did not get firerated door as not directly infront of liftgate not decided yetdoor frame about 150 each doors around 500 each got direct from factory..150 per door to cement door frame flush to the wall as i did major knocking away of the old frameshave a contact installing doors about 200locks and handle total cost around 250 Share this post Link to post Share on other sites
kelsam 1 Report post Posted December 25, 2013 few more items to the rojak house Share this post Link to post Share on other sites
elvis 0 Report post Posted December 25, 2013 did not get firerated door as not directly infront of liftgate not decided yetdoor frame about 150 each doors around 500 each got direct from factory..150 per door to cement door frame flush to the wall as i did major knocking away of the old frameshave a contact installing doors about 200locks and handle total cost around 250Door got it direct from factory.Mind to share the factory name? Share this post Link to post Share on other sites