chubbylobster 1 Report post Posted January 20, 2014 Have chosen my flooring. in fact i only pick my flooring on 12/1/14, foo had arranged to start tiling on 15/1/14.I love my black sesame flooring! i'm quite busy recently.. but not with renovation stuffs. more of like child's childcare etc, work... small little things!actually i feel like buying lightings from TB but its china CNY! long holiday for them.. hiak hiak.i like this as dining table.. but... but.. but.. the top is too woody. ( my house is suppose to avoid wood stuffs... as reco by fs master).hiak hiak!hopefully soon i will be able to upload more pics! hahahaha. quite impossible since its gonna be CNY soon. Share this post Link to post Share on other sites
retroquix 0 Report post Posted January 21, 2014 yup. coz Mr K is malaysian if i'm not wrong. =)Ahhhhhh.. thanks chubbylobster!! Share this post Link to post Share on other sites
chubbylobster 1 Report post Posted February 24, 2014 (edited) so start back from where i stopped. we had tiling started on 15 Jan.and it was completed by 28 Jan.So it was quite fast and furious.as pics to be honest. things were smooth at the start. these were pics from 28/1/14.But i guess probably didn't put in effort after some times that caused some hiccups.i had an early miscarriage during CNY i was no longer interested in doing anything. passed all the responsibility to hubby.great!that is where all the hiccups started! - mr foo tot we do not need to 'flush MBR wall even,HAHA! & it was very last min yest i called him up and checked if he is doing anything? coz i've arranged for painter on tuesday. Luckily he said it can be done before tuesday.....henggg ahhH- Hubby got it all wrong... he tot dark color for whole room, light color for 1 side of the wall for 1 bedroom.. ?!??! i don't know what is he thinking.. luckily still can change before delivery..i'm just glad.. and hopefully everything back in place!our electrician is my fil.painter is mil's friend. ( i will share contact later once my paintings + touch up all done)currently waiting for painting to take place ( on coming tues) & awaiting for carpentry. Edited February 24, 2014 by chubbylobster Share this post Link to post Share on other sites
Songz 132 Report post Posted February 24, 2014 (edited) Sorry to hear what happen.On the bright side a bit, things for your house can be rectify & I think your tiling for the room really looks nice.Can you enlighten me what color / code is that tile ?? (*My main motive ) Edited February 24, 2014 by Songz Share this post Link to post Share on other sites
chubbylobster 1 Report post Posted February 24, 2014 Sorry to hear what happen.On the bright side a bit, things for your house can be rectify & I think your tiling for the room really looks nice.Can you enlighten me what color / code is that tile ?? (*My main motive ) no prob! i'm better. else still in depress mood, wont post anything... HAHAHA.tiles both from hafary. as for code no. i need to check then can let u know. HEE. Share this post Link to post Share on other sites
chubbylobster 1 Report post Posted February 25, 2014 VZ360P - bedroom tiles Share this post Link to post Share on other sites
Songz 132 Report post Posted February 25, 2014 VZ360P - bedroom tilesThanks a lot. Like the color but not sure FSM / Mum will approve it. Share this post Link to post Share on other sites
chubbylobster 1 Report post Posted February 25, 2014 more pics up!update for today, painting for MBR and living room done~!just want to share this **** work!omg. the aircon man did not did a good jobafter informing the person to redo..this is what happened next..still.. standard is not there!! called the aircon man and irritated him! I'm gonna hold the last payment till he give me a satisfying work!i doubt anyone will want their new house yet look like this!! what kind of trunking work is that?!I shall not post the name of aircon man here, unless the final work is still KNS. Share this post Link to post Share on other sites
OceanEleven 203 Report post Posted February 25, 2014 Ohhh...the titles sure look blink blink!, Are they slippery if wet?more pics up!Purple....Me like Share this post Link to post Share on other sites
chubbylobster 1 Report post Posted February 26, 2014 eh. homogenous. not too wet will do i guess?Ohhh...the titles sure look blink blink!, Are they slippery if wet?Purple....Me like Share this post Link to post Share on other sites
OceanEleven 203 Report post Posted February 26, 2014 Chubby, your progress is much faster than mine.Have you bought any fan, stove, hood etc? Share this post Link to post Share on other sites
chubbylobster 1 Report post Posted March 1, 2014 bought... mostly from megadiscount store.but just found out that goh ah bee is cheaper ( for fan.. but cash and carry.. which is not convenient for me, we don't drive) HAHAHA. google goh ah bee's no. and call them with the model you want.. Share this post Link to post Share on other sites
chubbylobster 1 Report post Posted March 16, 2014 my 1st tb purchasethe rest not up yet.. like sink etc...city gascarpentry!my kitchen:my mbr:my living room:hopefully all by next week will be ready....but... my aircon stuff is still not fixed! zzzzz... Share this post Link to post Share on other sites
OceanEleven 203 Report post Posted March 16, 2014 but... my aircon stuff is still not fixed! zzzzz...But the trunking had been laid, right? Share this post Link to post Share on other sites
Songz 132 Report post Posted March 17, 2014 The carpentry works seem good from the pics and nice cover up of the pipes ... Share this post Link to post Share on other sites