lth3388 1 Report post Posted November 4, 2013 After some viewing and searching, we'd finally bought our 3 rd HDB flat, a 5I unit at Tampines. This is our 2nd renovation experience but it feels so new to us as we renovated our 1st flat some 20 over years ago with our contractor friend. We were in our 20s and I basically let him took care of everything besides selecting tiles and lightings. This time we planned well ahead and my OC also very much involved in the whole process and our house is considered done. I will be updating and uploading photos as and when I have the time. Of course to share and provide some info if needed but please bear with me if you don't hear from me immediately. Well, although we planned ahead (even before we collected the keys), there were changes along the way and we ended up having some lightings unused. To kick start, I will share our floor plan. Share this post Link to post Share on other sites
lth3388 1 Report post Posted November 4, 2013 (edited) Some before photos, the house was really run down. I also puzzled why we bought it though we had in mind to buy a house that does not need major overhaul. Some more, we paid COV for it. I guess that is fate. KitchenCommon bathroomService balcony Edited November 4, 2013 by lth3388 Share this post Link to post Share on other sites
lth3388 1 Report post Posted November 4, 2013 (edited) Entrance Edited November 4, 2013 by lth3388 Share this post Link to post Share on other sites
lth3388 1 Report post Posted November 4, 2013 (edited) HallHall to balconyMaster bath Edited November 4, 2013 by lth3388 Share this post Link to post Share on other sites
lth3388 1 Report post Posted November 4, 2013 MBRBalcony Share this post Link to post Share on other sites
lth3388 1 Report post Posted November 4, 2013 After I visited this forum, I'd also started off with posting a request for quotation but didn't meet any of the ID as only a few (to be exact 2) responded with email quotations. Some called after like 2 weeks later. Quotations were quite high and we felt that we do not need ID since we are on a budget and wish to "anyhow" do it to our liking.Back track a bit, before we collected the keys, we had already bought some crystal lights and LEDs from Taobao and shipped to us. They are really cheap and I thought unless we are buying the really good quality ones imported from the West, we would be paying a premium to buy from lighting shops for the same thing. Here are photos of the TB purchasesI shipped them though Peeka, though I also have contact or imported through other forwarder at a cheaper rate. I wanted my purchases to be taken care of by some one professional in this business as the lightings are fragile items. Share this post Link to post Share on other sites
lth3388 1 Report post Posted November 4, 2013 Since no ID, there isn't any 3D drawings etc. Just some hacking photos.Hacked almost everything except floorings of all 4 rooms as contractor advised us just to overlay wood laminate. Share this post Link to post Share on other sites
lth3388 1 Report post Posted November 4, 2013 Just a sneak preview of how our MBR bathroom ended up with our researches and copying of ideas from this forum. We have in fact, placed our second order with TB. Share this post Link to post Share on other sites
jnashville 0 Report post Posted November 4, 2013 Just a sneak preview of how our MBR bathroom ended up with our researches and copying of ideas from this forum. We have in fact, placed our second order with TB.Hi where do you get your mirror from? from taobao? can share the link. will be happy if you can PM me. Thanks! Share this post Link to post Share on other sites
lth3388 1 Report post Posted November 4, 2013 Hi jnashville, sorry if I misled you. Actually, we couldn't find this from TB or locally so we ended up asking our contractor who is also making carpentry in house to custom made for us. I do not have the unit cost as it was lump with another mirror (same design but smaller), dinning hall mirror and shelves as well as a shelving for MBR. But it should not be too costly to ask your contractor to make it if you are still renovating your house. Share this post Link to post Share on other sites
lth3388 1 Report post Posted November 4, 2013 I forgot to take photos when they were waterproofing kitchen and laying tiles there so I have to jump to day 18 when the cement floor in our hall is done. But the results were bad. Apparently, you need some one with good experience to do such job. Share this post Link to post Share on other sites
lth3388 1 Report post Posted November 4, 2013 Day 19, electrical done but found new problem. Balcony beam (near to roof) leaking. Share this post Link to post Share on other sites
lth3388 1 Report post Posted November 4, 2013 HDB officer was very responsive and came down twice to inspect and visited unit on top of us and finally determined that we could just solved it in our house. It was done in less than a week and he did it himself with the help of my contractor to hack the beam, and patched it back later. Hopefully, no more leaking. Share this post Link to post Share on other sites
lth3388 1 Report post Posted November 4, 2013 Lightings up.Service balcony (MIC but not from TB, given as gift)Kitchen (from TB) Share this post Link to post Share on other sites
lth3388 1 Report post Posted November 4, 2013 BedroomMBRLivingDinning Share this post Link to post Share on other sites