Acklane 6 Report post Posted November 2, 2013 (edited) Finally after a long wait for 3 years, my BTO flat has finally completed, now its my turn to share my reno for my new house in TreeGrove. BTO @ Tree Grove applied on 11-07-10Got key on 19-07-13 Floor plan Edited December 15, 2013 by Acklane Share this post Link to post Share on other sites
Acklane 6 Report post Posted November 2, 2013 Got my 2nd drawing from ID.Some changes on 2nd drawing is still needed. Living roomMBR2nd bedroom3rd bedroom Share this post Link to post Share on other sites
Acklane 6 Report post Posted November 2, 2013 Kitchen Share this post Link to post Share on other sites
Acklane 6 Report post Posted November 2, 2013 Start of reno on 19-10-13Construction of fridge and kitchen base Share this post Link to post Share on other sites
Acklane 6 Report post Posted November 2, 2013 Done some shopping in JB Share this post Link to post Share on other sites
Acklane 6 Report post Posted November 2, 2013 Electrical and Air Con installation on 29-10-13 Share this post Link to post Share on other sites
Acklane 6 Report post Posted November 2, 2013 The Aircon installer took almost 1 full day for this. System 3.They started at 11.30 am till 5 pm to complete everything.MBR Room 2 Room 3 Share this post Link to post Share on other sites
Acklane 6 Report post Posted November 2, 2013 My electrical installation done on the same day as aircon installation Share this post Link to post Share on other sites
Acklane 6 Report post Posted November 2, 2013 (edited) Windows Grill installation on 30-10-13 Edited November 4, 2013 by Acklane Share this post Link to post Share on other sites
Acklane 6 Report post Posted November 3, 2013 L box and false ceiling up on 31-11-13Living RoomMBR Water filter in Kitchen done Share this post Link to post Share on other sites
Acklane 6 Report post Posted November 3, 2013 MBR aircon trunking nicely doneBefore After Share this post Link to post Share on other sites
pressuntilshiok 0 Report post Posted November 3, 2013 Hi, Congrats on your new place. The 3D pics look good, though the kitchen looks a little tight on walking space.Was looking at your a/c installation and it is indeed nicely done. Was this through your own contact or throught ID? Mind if I ask for the contact?Cheers Share this post Link to post Share on other sites
Acklane 6 Report post Posted November 3, 2013 Hi,Aircon was done by Tim Wong team. The cover up on aircon trunking was done by my ID. Share this post Link to post Share on other sites
Acklane 6 Report post Posted November 4, 2013 Just saw a neighbour place service yard and this remind me of the advice from my ID on the drainage for washer if not I will miss this also.I find this is very useful for those to take note if you guyz have not done this. I think this is a part where a lot of us will miss. See picture below. My washer drainage pipe have been shifted to a corner and this can let me have more spare for washerMy friend place drainage at original position.To me it seem like very cramp after washer is place in. Don't know why HDB design this in the middle?Hope this is useful to those who is gong to start their reno. Share this post Link to post Share on other sites
pressuntilshiok 0 Report post Posted November 4, 2013 Thanks for the info! Share this post Link to post Share on other sites