ptc77 1 Report post Posted October 28, 2013 (edited) Finally its my turn to start this blog of my new home. The reno is almost to completion.So far so good, wife and myself quite satisfied with all works done ..At times, there will bound to be hicups & miscommunication along the way given the amount of coordinating works required, the number of people involved, the different job scope to be done etc...To me, it's more importantly how the ID resolve the issue. And provide alternative solution when things do not work accordingly to plan... The willingness for both parties, be it is ID fault or ours, to accept mistakes made, correct it and move on..I have learnt renovation is never be a 100% perfect thing... well, at times learnt to give and take to reach a compromise agreement to resolve any issues faced. But of course for certain matters , you need to be firm if the mistake made are not acceptable and need to be change. ID will need to comply.For that, i give credit to my ID who did a pretty good ''job'' whenever unexpected situation arisesLet me re-cap, the good & the bad, and share my journey ....... Edited October 30, 2013 by ptc77 Share this post Link to post Share on other sites
ptc77 1 Report post Posted October 28, 2013 Bees spoken to various ID , big firm (Chxx, NW, R & R) , as usual sales talk. perhaps my budget is not attractive to them Share this post Link to post Share on other sites
ptc77 1 Report post Posted October 28, 2013 (edited) well. small firm are more willingly to meetup onsite and discuss. In particular i shortlisted to 2 ID, they are behXXe and RenoGuyZbehXXeA friendly ID with good child orientation design, share ideas on what to do based on layout, however on hand got 5 project running which worry me. Overall, good impression on him.RenoGuyZ (Nick)First look, came in t-shirt and short. Well, i thought ,okay since he is here, let's talk. In fact i shortlisted him as renotalk got a fair bit of his displayed works and good review. Look blurish & blank as well known..As usual, we went thru the entire layout onsite, from there, he gave his advise on cost saving after listening to my requirement.His p.f.r pricing for built in warerobe, cabinets, kitchen top, glassback, wall hacking, quoted by him was rather attractive compared to behXXe. I were surprised when he told me the quotation will be ready on the same day.Indeed, his quote came in that night. Overbudget at first quote, ask for revise quotation...Well, over the next 1 week period, 3 revised quote given, countless whatsapp messaging on price negotiation, the deal was sweeten with some unexpected discount given & foc items bundled in, plus a satisfactory visit to his showroom flat at Punggol, we confirmed nick as my ID.A point to note that to secure a good package deal, the quoted price for all items are on the understanding that the both material used and resources allocated are from my ID. Only air-con & window grills were outsourced to others who are highly well-know in the forum. It was already well past 4 weeks in seach of the suitable ID after my key collection from HDB. It's time to move on to next stage..Next. on the 3D design .... Edited October 30, 2013 by ptc77 Share this post Link to post Share on other sites
ptc77 1 Report post Posted October 28, 2013 (edited) My 3D Living Room Design option 1 Edited October 28, 2013 by ptc77 Share this post Link to post Share on other sites
ptc77 1 Report post Posted October 28, 2013 (edited) My 3D Living Room Design option 2 Edited October 28, 2013 by ptc77 Share this post Link to post Share on other sites
ptc77 1 Report post Posted October 28, 2013 Master Bedroom Design Option 1 Share this post Link to post Share on other sites
ptc77 1 Report post Posted October 28, 2013 Master Bedroom Design Option 2 Share this post Link to post Share on other sites
Asking4Help 1 Report post Posted October 28, 2013 Nice, kinda giving a cosy feel.... I think we had almost the same layout of BTO floor plan... & living room 1 looks great... Share this post Link to post Share on other sites
cozydreams 0 Report post Posted October 28, 2013 Did you do window grills?What type of window grills you do?Can share contact of ur window grills? Share this post Link to post Share on other sites
ptc77 1 Report post Posted October 28, 2013 (edited) Our home theme; simple, modern and practical.Simple for ease of maintenance.Modern for that long lasting design looks.Practical for useful storage purposes.Black and White will be the main color used. Edited October 29, 2013 by ptc77 Share this post Link to post Share on other sites
mariohoho 0 Report post Posted October 29, 2013 Hi, welcome to renotalk...i prefer the Option 1 for both living room and MBR... feels cosier... happy reno... Share this post Link to post Share on other sites
jus4fun 4 Report post Posted October 29, 2013 Yo bro, welcomed to RT, and congrats on ur new hse & reno nearing completion! Good efforts of you to share ur reno journey & experience despite coming to an end to the project.. Let me guess, u all went for Option 2 for both Living & MBR? Haha! Share this post Link to post Share on other sites
ptc77 1 Report post Posted October 29, 2013 (edited) In this full scale renovation project, the items shall include:False ceiling & L BoxPartition/ divider with settee & side cabinetShoe cabinet TV feature wall with consoleKitchen cabinet with glassbackToilet vanity with mirrorBuilt in wardrobe at all roomsStudy tableHomogeneous flooring for all roomsHacking & replacement of kitchen floor tilesHacking of service yard wallOverlay of toilet floor tilesPlumbing worksElectrical worksShower screen Edited November 3, 2013 by ptc77 Share this post Link to post Share on other sites
ptc77 1 Report post Posted October 29, 2013 (edited) Project kick start with selection of tiles from Hafary , laminate from EDL and paint from nippon paint. Edited November 1, 2013 by ptc77 Share this post Link to post Share on other sites