Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
ptc77

Buangkok Reno Journey

Recommended Posts

Looking for good contractors? Click here for your request

To achieve the modern look, wife and ID proposed 3 things

Conceal PD box as it looks odd & unsightly

gallery_53147_134_12088.jpg

Hacking of wall between service yard & kitchen

gallery_53147_134_17736.jpg

Both toilet basin to be replaced with top & bottom vanity

gallery_53147_134_26216.jpg

Edited by ptc77
 

Share this post


Link to post
Share on other sites

For hacking that wall require HDB approval and PE fee. Thankfully, it was approved within a week after ID submit the request.

The end result

gallery_53147_134_30271.jpg

Let there be brighter light & strong wind...

 

Share this post


Link to post
Share on other sites

As the reno progress, level up to light wiring discussion with the help of ID expertise, the electrical-in-charge as like others will hand stretch his masterpiece art on the wall.

gallery_53147_134_15450.jpg

gallery_53147_134_29743.jpg

gallery_53147_134_32080.jpg

Edited by ptc77
 

Share this post


Link to post
Share on other sites

Within a week, electrical wiring arranged by ID , you can still change your mind on the lightings position as this stage.. but need to act fast and inform ID ASAP

gallery_53147_134_25208.jpg

gallery_53147_134_44521.jpg

gallery_53147_134_27463.jpg

gallery_53147_134_29268.jpg

gallery_53147_134_8007.jpg

gallery_53147_134_4477.jpg

Edited by ptc77
 

Share this post


Link to post
Share on other sites

With the completion of electrical wiring, arrangement to install false ceiling and L box will be next by my ID

gallery_53147_134_36654.jpg

gallery_53147_134_21804.jpg

gallery_53147_134_18724.jpg

Edited by ptc77
 

Share this post


Link to post
Share on other sites

Followed by painting jobs using Nippon paint 5000 after selection from the given catalogue

Spot check whether all using nippon paint.. :good: Even ceiling painting using Nippon Paint..

gallery_53147_134_71674.jpg

Edited by ptc77
 

Share this post


Link to post
Share on other sites

Next up will the window grill where i source directly to Andy. I make arrangement with him over few weekend to take site measurement & installation.

If given a chance, i will let my ID handle this portion to be hassle free. Very time consuming as you got to do your own coordination with the supplier subject to his availability in particular if it's a weekend appointment.

If for any problem, you will need to liaise directly with the supplier instead of rely on your ID who will arrange & rectify the issues for you. As expected, few issues after the installation done, i make few arrangement to rectify.. :curse:tiring..

Overall the service & products by Andy is rated good.

.

gallery_53147_134_17939.jpg

gallery_53147_134_12646.jpg

Grill with 3 panel Window glass

gallery_53147_134_6210.jpg

Edited by ptc77
 

Share this post


Link to post
Share on other sites

Scenery view from home window

Living Room (We call it ''Billion Dollar View'' judging from the cost per unit)

gallery_53147_134_28456.jpg

MBR

gallery_53147_134_100705.jpg

Service Yard

gallery_53147_134_39481.jpg

 

Share this post


Link to post
Share on other sites

Next .. aircon purchase & installation .. i source directly to Tim Wong (Advertiser at renotalk) for his known good services.

2 trips have been arranged. 1st trip to work out and lay the piping & trucking. 2rd trip to install the condenser & compressor.

As like any new owner, i have no clue on how the piping & trucking should be placed. Fortunately, my ID willingly offered his help despite i did not buy the aircon from him.

With him around, i were able to sit back, relax and watched him working out the details with the aircon installer. Lucky me. Otherwise it wll be a uphill task for me.

Edited by ptc77
 

Share this post


Link to post
Share on other sites

1 particular area where i need to make a decision on whether the trunking under pillar for living room & MBR should be covered up. It were rather stressful when both the installer & ID waiting for my answer as the end trunking will be laid accordingly to the outcome. To me its all about cost vs appearance

Living Room

gallery_53147_134_13995.jpg

MBR

gallery_53147_134_9075.jpg

 

Share this post


Link to post
Share on other sites

My ID advice me to look at long term. Indeed, it was a piece of good advice, really well worth the decision made after i saw the trunking were concealed the very next day. Very prompt arrangement done.

Else i really cannot imagine looking at the ugly trunking when walking pass the passageway everyday.

Living Room

gallery_53147_134_25172.jpg

MBR

gallery_53147_134_9766.jpg

Edited by ptc77
 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×