linakua 0 Report post Posted October 20, 2013 Day 7 - False Ceiling doneFalse Ceiling **** RoomAlong passagewayMBR Share this post Link to post Share on other sites
bandits272 0 Report post Posted October 20, 2013 hi there, May i ask where do u get the lightings from??Regards Share this post Link to post Share on other sites
linakua 0 Report post Posted October 21, 2013 hi there, May i ask where do u get the lightings from??RegardsHi From Taobao... Share this post Link to post Share on other sites
linakua 0 Report post Posted October 22, 2013 Day 12 - Wetwork done..... Share this post Link to post Share on other sites
Acklane 6 Report post Posted November 4, 2013 (edited) Hi LinaKua,I believe we are neighbor of TreeGrove. For service yard I find that it will be better to shift the drainage to a comer see picture below and hope that it is not too late to amend if you think it is good. This is advice by my ID and what i didpicture taken from my friend place. Edited November 4, 2013 by Acklane Share this post Link to post Share on other sites
linakua 0 Report post Posted November 5, 2013 Hi LinaKua,I believe we are neighbor of TreeGrove. For service yard I find that it will be better to shift the drainage to a comer see picture below and hope that it is not too late to amend if you think it is good. This is advice by my ID and what i didpicture taken from my friend place. toooooooo late........... base done........ how ar? base done le still can shift ma? Share this post Link to post Share on other sites
linakua 0 Report post Posted November 6, 2013 Help!!! I am so pissed by my ID. I met their carpenter 2weeks ago, and they promise carpentry will be ready in 3weeks. During this period I waited patiently. Now when I keep asking him can the carpentry be up next week, which is due, he then tell me his carpenter wrapped up his business and nothing was done!! How can be so irresponsible and he never update me immediately? I am so angry.... what should I do???? I paid 95% of the package liao!! Share this post Link to post Share on other sites
Pokz1981 2 Report post Posted November 6, 2013 Help!!! I am so pissed by my ID.I met their carpenter 2weeks ago, and they promise carpentry will be ready in 3weeks.During this period I waited patiently. Now when I keep asking him can the carpentry be up next week, which is due, he then tell me his carpenter wrapped up his business and nothing was done!!How can be so irresponsible and he never update me immediately?I am so angry.... what should I do???? I paid 95% of the package liao!!Sad to hear that, can share the name? Did the carpenter just wrap up his business but your ID still can source another carpenter to take over or is it a case whereby the carpenter ran off with the money too? Share this post Link to post Share on other sites
linakua 0 Report post Posted November 6, 2013 (edited) Sad to hear that, can share the name? Did the carpenter just wrap up his business but your ID still can source another carpenter to take over or is it a case whereby the carpenter ran off with the money too?Talked to him last night and now he promised to give a new schedule by today 6pm. Carpenter ran off with money or not I am not sure too...... What a reno experience!! Edited November 6, 2013 by linakua Share this post Link to post Share on other sites
linakua 0 Report post Posted November 7, 2013 For the whole solid 38 days of my renovation, what had been done :1) 50% of electrical work, that is wiring of the wires2) 50% of plumbing work, that is only built base for my kitchen cabinets, washer base and kerb in bathroom3) False ceiling 100%4) 1st cost of painting5) Installation of windows at service yard and grilles for all windowsWhat else? Nothing else.....Outstanding items :1) All carpentry - kitchen cabinets, feature wall, tv console, wardrobes for all bedrooms, a study table for my son, vanity cabinet for master bathroom2) Plumbing work - shower screen, all mirror installation?3) Electrical work - installation of all lights4) painting ?Gosh.....how much longer must I wait? If they breach the leadtime stated in the contract, can I refuse to pay the remaining 5% even after handover? Share this post Link to post Share on other sites
linakua 0 Report post Posted November 21, 2013 Hello everyoneafter waited patiently for another 2 weeks.... finally.... thing started to move!!I am so happy to see my lights are installed and carpentry started!!photos!! Share this post Link to post Share on other sites
linakua 0 Report post Posted November 21, 2013 kitchen cabinets started installation!!!! Share this post Link to post Share on other sites
francisg 2 Report post Posted November 22, 2013 Hi Linakua, can i ask how many down light did you install in your living/dining room, is it 4 inch LED light? is it sufficently bright? Share this post Link to post Share on other sites
linakua 0 Report post Posted November 22, 2013 Hi Linakua, can i ask how many down light did you install in your living/dining room, is it 4 inch LED light? is it sufficently bright?Hi FrancisTotal 8 down light. I used 12W LED light dimension I think is 6" . It is very bright. Last night I tried, I think on 5 LED lights is enough. Share this post Link to post Share on other sites
linakua 0 Report post Posted November 23, 2013 The step by step renovation really looks great. Though personally I think that the pace is slow but in the end it's worth it. Getting some ideas to come up with my renovation plan. Currently in my home I am using 3 LED lights and that is sufficient for me, I guess it depends upon the size of room that is needed to get lit. i think 3 lights are enough.... maybe i light super bright...lol Share this post Link to post Share on other sites