ShawnOh 0 Report post Posted August 28, 2013 Hi, if you don't mind. I can recommend you my contractor. He is well experienced. Even though I have the knowledge in design. He is more hands on in terms of construction, his quotation is reasonable, and itemized quite detailed. You will see his dedication after engaging this contractor. He will personally look into the renovation process. He even gave me a schedule and really keeping it to the timetable. He was the first person to contact me in 15 mis. After I sent out a request for quotation from all contractors.Due to my bank standing. Bank loan was reduced. He gladly revised my quotation.I want you to check this contractor, not only that he became my friend after engaging him. Even though my construction is still on going. He manages his time to follow up with some decisions that he need from me.PM me if you need his contact.ThanksHi, can PM me his contact? Thanks. Share this post Link to post Share on other sites
abrakadava 0 Report post Posted August 29, 2013 Hi all,I am going to collect my keys to my place next year and have started to look for ID for preparation of my flat.Mine is a 4 room BTO which I have opted for flooring and doors to be done.So far I have went to about 4 IDs, some are too expensive and some way too cheap.I even have 1 quotation from an ID for whole house renovation, including changing of kitchen table top from solid surface to quartz, having a full length mirror at dinning, false ceiling for whole house (except 2 bedrooms) and making dinning bench all for $11,888.As a newbie, I would like any advise on how much a rough 4 room BTO renovation would cost and any recommendation so that I can have a better idea.Thank you!WOW $11,888! I think a 4room new flat would cost at least 20k or slightly more! Does your ID include plumbing and electrical works? Share this post Link to post Share on other sites
wondermelon 0 Report post Posted September 8, 2013 i think $11888 is based on package price la...normally package price the id don't really make much money wan .......maybe 10%-15% profit margin only but the items listed are all very vague.normally they will charge alot much higher when u want to add in additional items thats the time when they up their profit margin. i also dont think they include electrical works i am sure they will whack the price up when they quote the electrical works.i think for 4 rms BTO the reno is ard 16-18k . over 20k will have to look at design liao........ Share this post Link to post Share on other sites
Jane2010 0 Report post Posted September 18, 2013 Hi, I'm a newbie too. Can you pm me your ID contact?Thanks in advance! Share this post Link to post Share on other sites
wesing 0 Report post Posted September 20, 2013 I also need your ID contact. Can pm me too? Share this post Link to post Share on other sites
Tiler Seng 57 Report post Posted October 5, 2013 Check out the latest Tiler Seng Gallery: http://www.renotalk.com/forum/topic/23560-direct-tiler-service/page-22 Share this post Link to post Share on other sites
Bikerguy 0 Report post Posted October 7, 2013 My id company is lousy. Suppose to do 1 kitchen and 2 bathrooms within a month and give an allowance to 1.5 months (Till 25 Aug 2013). The id either unable to manage his workers or cant rebothered about it. So up till today, its till an unfinished project with disputesOne of my heater got problem after installation. The master heater was ok and the common heater had problem. My ID text me saying that my heater spoilt. I ask him, are you sure. He replied that after his plumber installed, he asked his electrician to come test the electricity and no issue. So I asked him what am I suppose to do. I asked him whether he can take it down and I bring it to the shop (I didn't buy the heater from his recommended shop as its twice the price there) and then he put it up for me. My ID said that he only put one once, cant take down and put up again. So I had to call my heater company to ask their peeps to come down. Ariston engineer came and was laughing his head off - ah di , your contractor stupid is it, in and out also never put properly. Put opposite. So there waste half a day of freaking leave for me. My custom made kitchen cabinets, were of worse quality than off the shelves, with the laminate edges jagged and poorly formed. They refused to change it at first and got their carpenter down to touch up a few times. I barred my flat recently so the last two times the carpenter came down, I was present. The first time, there were no visible difference to kitchen cabinets and drawers. Their carpenter went off happily and just walk past me and say finished already before I can say anything.The 2nd time, the carpenter brought another younger colleague down and was suppose to "change" the laminate, there was another contractor who came to varnish the doors. The varnish contractor was waiting for me whileas the carpenters came slightly late. The carpenters came in for an hour or so, broke for lunch for about 2 hours plus and returned, whileas the door varnish carpenter was an external contractor employed by them, stayed throughout the lunch time to complete his job before going to take his lunch.The carpenters to my horror, touch up my dark brown cabinets and drawers, with kindof green stuff. So my cabinets and drawers were greenish in colour at the corners. I called my ID to tell him, and I had to wait for 2 plus hours for him to come and view.Furthermore, their workers walk from my master bedroom toilet to the living room when their boots are covered with cement. So my broken marble flooring had cement stains from the toilet entrance to the living room. Not only stains, but my broken marble flooring was scratched and had holes in it.Be wary if you take this company IDs. PM me if you want their company and names. 3 big companies but 2 are subsidiaries with one main. My company is one of their subsidiary. So even when people say chose big company sure no problem, its like freaking ****. Share this post Link to post Share on other sites
angelbaby77 0 Report post Posted October 7, 2013 hianyone has contractor contacts to intro? Share this post Link to post Share on other sites
marcusie 0 Report post Posted October 8, 2013 HI.... For my view, a normal 4rm BTO flat will need around 18k onwards and depends on the items that you want to do up.But just remember that good things don't come cheap. If you want more quotation to compare, you can PM me and i recommend my ID cum contractor to you.his pricing is quite reasonable...hi, can pm me yr contractor contacts. Share this post Link to post Share on other sites
karelia 0 Report post Posted October 9, 2013 HI.... For my view, a normal 4rm BTO flat will need around 18k onwards and depends on the items that you want to do up.But just remember that good things don't come cheap. If you want more quotation to compare, you can PM me and i recommend my ID cum contractor to you.his pricing is quite reasonable...hi, can you pm me your ID/ contractor as well? thanks! Share this post Link to post Share on other sites
Bikerguy 0 Report post Posted October 11, 2013 Never get this ID firm. Refuse to negotiate and refuse to make good on their damages during renovation.Bxxxxs Design. Share this post Link to post Share on other sites
Hello77 0 Report post Posted October 21, 2013 My id company is lousy. Suppose to do 1 kitchen and 2 bathrooms within a month and give an allowance to 1.5 months (Till 25 Aug 2013). The id either unable to manage his workers or cant rebothered about it. So up till today, its till an unfinished project with disputesOne of my heater got problem after installation. The master heater was ok and the common heater had problem. My ID text me saying that my heater spoilt. I ask him, are you sure. He replied that after his plumber installed, he asked his electrician to come test the electricity and no issue. So I asked him what am I suppose to do. I asked him whether he can take it down and I bring it to the shop (I didn't buy the heater from his recommended shop as its twice the price there) and then he put it up for me. My ID said that he only put one once, cant take down and put up again. So I had to call my heater company to ask their peeps to come down. Ariston engineer came and was laughing his head off - ah di , your contractor stupid is it, in and out also never put properly. Put opposite. So there waste half a day of freaking leave for me. My custom made kitchen cabinets, were of worse quality than off the shelves, with the laminate edges jagged and poorly formed. They refused to change it at first and got their carpenter down to touch up a few times. I barred my flat recently so the last two times the carpenter came down, I was present. The first time, there were no visible difference to kitchen cabinets and drawers. Their carpenter went off happily and just walk past me and say finished already before I can say anything.The 2nd time, the carpenter brought another younger colleague down and was suppose to "change" the laminate, there was another contractor who came to varnish the doors. The varnish contractor was waiting for me whileas the carpenters came slightly late. The carpenters came in for an hour or so, broke for lunch for about 2 hours plus and returned, whileas the door varnish carpenter was an external contractor employed by them, stayed throughout the lunch time to complete his job before going to take his lunch.The carpenters to my horror, touch up my dark brown cabinets and drawers, with kindof green stuff. So my cabinets and drawers were greenish in colour at the corners. I called my ID to tell him, and I had to wait for 2 plus hours for him to come and view.Furthermore, their workers walk from my master bedroom toilet to the living room when their boots are covered with cement. So my broken marble flooring had cement stains from the toilet entrance to the living room. Not only stains, but my broken marble flooring was scratched and had holes in it.Be wary if you take this company IDs. PM me if you want their company and names. 3 big companies but 2 are subsidiaries with one main. My company is one of their subsidiary. So even when people say chose big company sure no problem, its like freaking ****. Share this post Link to post Share on other sites
runningmanfanz 0 Report post Posted October 22, 2013 haiz i have been searching ID around but so far yet found a RIGHT one. lol saw so many negative comment on the ID i wonder if i shoud just engage contractor since my reno is not a huge project?sigh Share this post Link to post Share on other sites
luvhenny 9 Report post Posted November 17, 2013 Hi all,I am going to collect my keys to my place next year and have started to look for ID for preparation of my flat.Mine is a 4 room BTO which I have opted for flooring and doors to be done.So far I have went to about 4 IDs, some are too expensive and some way too cheap.I even have 1 quotation from an ID for whole house renovation, including changing of kitchen table top from solid surface to quartz, having a full length mirror at dinning, false ceiling for whole house (except 2 bedrooms) and making dinning bench all for $11,888.As a newbie, I would like any advise on how much a rough 4 room BTO renovation would cost and any recommendation so that I can have a better idea.Thank you!can email or pm yr id thank you. 11888sgd which i am looking for... Share this post Link to post Share on other sites
karthiga 1 Report post Posted November 20, 2013 Can I have his contact no. Thanks Share this post Link to post Share on other sites