chubbylobster 1 Report post Posted November 21, 2013 Day 34More updates for the tiling workMore bricks were delivered and more kitchen cabinet tiles were delivered today. After these will be false ceiling and followed by the aircon's 2nd trip. lovely~~~~~ I also asked MR K for quote... out of budget. :~ Share this post Link to post Share on other sites
snowblind 1 Report post Posted November 21, 2013 Nice and different diamond like backsplash. How much does it cost? Share this post Link to post Share on other sites
Makanology 29 Report post Posted November 21, 2013 Your malteses are so cute! Siblings? Share this post Link to post Share on other sites
plainsharon 20 Report post Posted November 21, 2013 (edited) Day 41False CeilingConcrete Works more or less done up. Service yard sink done up :Cove and False Ceiling in the MBR on its way up :Done up MBR's False Ceiling and Cove :Other side MBR cove and False Ceiling :Another view of the MBR's Cove and False Ceiling :One Super Huge Issue we realised!! We are suppose to have a sliding door for the MBR toilet, See what the aircon trunking and box up have done :Oh my 天! These few days will be doing False Ceiling, wanted to arrange for 2nd trip of aircon after the false ceiling but have till be delay till the painting is done. Am laying HERF next week as well, rooms needs to be cleared for HERF. Edited December 2, 2013 by plainsharon Share this post Link to post Share on other sites
plainsharon 20 Report post Posted November 21, 2013 lovely~~~~~ I also asked MR K for quote... out of budget. :~ Thanks for dropping by. MR K's quote is quite steep, we tried to bargain and bring down his price by a bit and removing some of our To-Do-List from his quotation to try matching into our budget.Nice and different diamond like backsplash. How much does it cost?Thanks! Its about 1.7k for that glass mosaic backsplash but price varies depending on which type is being chosen and the availability for the mosaic. Your malteses are so cute! Siblings?Thanks. They are not siblings, age are 1 year old apart. Both are female though. Share this post Link to post Share on other sites
plainsharon 20 Report post Posted November 23, 2013 (edited) Day 43Aircon PipingMinor Updates :Living Room Air Con Trunking Box Up:Part of the walk in waredrobe's partition :MBR Box Up :Weighing our options for the MBR's Toilet Door :Option 1 : Shorter sliding door but have wood to seal up the gap [might not look nice]Option 2 : Shorter sliding door but a gap on top of the door [water vapour and smell will escape from the small gap]Option 3 : 2 piece push in or pull out wood doorOption 4 : Bi Fold Lourve Door.Mr K suggest that he will take care of the matter which we might not be sure to which.Concern about option 1 is that water vapour will spoil the wood eventually but Mr K say it won't Edited December 2, 2013 by plainsharon Share this post Link to post Share on other sites
plainsharon 20 Report post Posted November 24, 2013 (edited) Day 44False CeilingMinor updatesCompletion of False Ceiling in the Living Room.Chased Mr. K for some timeline and to-do-list when Mr K is away overseas. To-Do-List1. Mr K will be inspecting the False Ceiling tomorrow and arrange for initial round of painting if everything goes well, it should be able to start painting on wednesday Friday [Delayed]2. Get Wall Color Samples from Mr K3. Cleaning up and Clearing Debris should be done before Wall Painting4. Arrange for Lighting to be install while Mr K is away after the painting5. While arranging for Lighting fixture, arrange for carpentry to come for measurement6. Not forgetting to request for Laminate Samples. Should be using Lamitak as Mr. K suggested7. Arrange for Aircon installation after lighting is done. Edited December 2, 2013 by plainsharon Share this post Link to post Share on other sites
hojichalatte 21 Report post Posted November 25, 2013 hi, Mr K is now not in SG, or is he going away this week? I'm waiting for him to get back with his quotes.... Share this post Link to post Share on other sites
tangie 1 Report post Posted November 25, 2013 hi, Mr K is now not in SG, or is he going away this week? I'm waiting for him to get back with his quotes.... He is leaving tml. Share this post Link to post Share on other sites
hojichalatte 21 Report post Posted November 25, 2013 (edited) He is leaving tml. Thanks! Any idea when he's returning? Edited November 25, 2013 by hojichalatte Share this post Link to post Share on other sites
plainsharon 20 Report post Posted November 25, 2013 Thanks! Any idea when he's returning? Hi hojichalatte,He is leaving tomorrow evening and returning next week. Share this post Link to post Share on other sites
plainsharon 20 Report post Posted November 26, 2013 (edited) Day 46Extra shelvingMr K's worker did some extra for usCorner shelving in MBR :Corner Shelving for Common BathroomAnd lastly its colour choosing time :\Gotten a copy of Dulux 2014 colour palette book from Mr K and have shortlisted and selected some colours.As we are going for Scandi thus we have chosen Dulux All - Sail White[AL 25815] for living room, Dulux All - Pacific Mist[AL20808] for rooms.Feature walls will be newer colours : Private Lagoon [90GG19 / 151] & Canadian Sky 30BG49 / 047] Edited December 2, 2013 by plainsharon 1 Share this post Link to post Share on other sites
hojichalatte 21 Report post Posted November 26, 2013 Hi hojichalatte,He is leaving tomorrow evening and returning next week. Thanks!! All the best to your reno! Share this post Link to post Share on other sites
tangie 1 Report post Posted November 26, 2013 Day 46Mr K's worker did some extra for usCorner shelving in MBR :Corner Shelving for Common BathroomAnd lastly its colour choosing time :\Gotten a copy of Dulux 2014 colour palette book from Mr K and have shortlisted and selected some colours.As we are going for Scandi thus we have chosen Dulux All - Sail White[AL 25815] for living room, Dulux All - Pacific Mist[AL20808] for rooms.Feature walls will be newer colours : Private Lagoon [90GG19 / 151] & Canadian Sky 30BG49 / 047]I like the shelving! Did you request for it? Share this post Link to post Share on other sites
plainsharon 20 Report post Posted November 26, 2013 I like the shelving! Did you request for it? I did last min request to do the shelving, though its not in the intial quotation. Don't know if K will add it in the invoice later on. Share this post Link to post Share on other sites