Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
plainsharon

So Far So Good At Foliage [4-Room]

Recommended Posts


Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

R there more photos? Show us on renotalk retchlow! Hee!! (Sorry to hijake ur blog sharon)

Sharon, ur reno is progressing pretty fast! Looking great!

 

Share this post


Link to post
Share on other sites

R there more photos? Show us on renotalk retchlow! Hee!! (Sorry to hijake ur blog sharon)

Sharon, ur reno is progressing pretty fast! Looking great!

LOL! no problem~ and thanks. :)

Her t-blog is more detailed and much longer but i feel the fb photos are nicer to see. But its a little too little. Want to see more~

sure, go ahead & add if you don't mind my random uncouth posts on fb..lol

 

Share this post


Link to post
Share on other sites

Day 35

Floor Tiles Complete

More updates

Living Room wood tiles complete :

Tomorrow will be filling in the grouting for the wood tiles. :)

1461233_10152411530354546_2032724639_n.j

1426380_10152411530664546_1385007440_n.j

1465132_10152411530574546_408895827_n.jp

False Ceiling will be up next week and it is safe kept in the MBR in front. :good:

Totally din't expect Mr. K to be so fast on getting the false ceiling arrange and moved in.

His worker has been trying to bring across to us that after the tiling is done, Mr. K will get things moving quickly. True enuff, false ceiling is in and will be up next.

Remember seeing a post about Mr. K's tiling worker. I dont think its the same tiling worker mentioned but concluded that Mr. K's tiling worker might all be having bad mood faces. This tiling worker we had a great time having him doing our tiling work but he does not likes to talk and is really serious with his work. :good:

Looking forward to the progress next.

Edited by plainsharon
 

Share this post


Link to post
Share on other sites

Day 36

Aircon Piping was up days ago but could not upload as the floor tiling was on-going.

Here are some of the Aircon Piping works done by Cool Force, realised that their insulation is thicker and feels different from usual insulation material. Rougher~

1185674_10152413969529546_672300976_n.jp

1441496_10152413968694546_1687895616_n.j

993736_10152413968834546_1914029700_n.jp

Our Aircon were pull along the Corridoor :

1454739_10152413968964546_114100976_n.jp

 

Share this post


Link to post
Share on other sites

Update Continues :

Flooring is finally done with grout fillings

Corridor :

541468_10152413969459546_1801849396_n.jp

1475770_10152413969164546_1737430298_n.j

Getting Ready for tomorrow's basin work for service yard :

Waste Pipe properly align and hidden :good:

374479_10152413968429546_945608792_n.jpg

Look what are these ~ Its false ceiling boards :notti:

After False Ceiling is the Aircon from Cool Force will be up again, 2 x compressor and 4 units. :good:

941867_10152413968904546_1870040698_n.jp

1469776_10152413968774546_1010572513_n.j

Lastly, our properly under mounted kitchen's sink :yamseng:

1185656_10152413968209546_1889729375_n.j

 

Share this post


Link to post
Share on other sites

Hi Freshberrie,

You were mentioning about the chandelier which i had purchase for my friend from Taobao, Here is it :

574463_10152403971439546_1057506518_n.jp

1460124_10152403971294546_160547222_n.jp

Not sure why it looks somewhat different from the one purchase from Taobao

T2tZF7Xo8cXXXXXXXX_!!192253787.jpg_310x3

http://item.taobao.com/item.htm?spm=a1z0d.6639537.0.0.ndTxN9&id=6185049328&shop_id=57159195

The lights came with a cover, without the cover, the lightbulbs are the same.

My friend love the chandelier very much. :good:

Thank you!!! Can't wait to get mine, no worries now :D

 

Share this post


Link to post
Share on other sites

Hi, nice renovation you had there I am curious that is your wood tiles is part of the renovation package or you buy from hafary individual for your contractor to lay and kindly pm you qutotation price for you Mitsubishi inverter 2x 2 system 2 thank :)

Edited by tarzanboy
 

Share this post


Link to post
Share on other sites

Hi, nice renovation you had there I am curious that is your wood tiles is part of the renovation package or you buy from hafary individual for your contractor to lay and kindly pm you qutotation price for you Mitsubishi inverter 2x 2 system 2 thank :)

Hi~

Thanks for dropping by. My wood tiles was part of my renovation package i went down to hafary from Mr. K's recommendation that his account is under hafary and we could select tiles from 3 different places, 1 of it to be Hafary. :D

As for the Mitsubishi Inverter 2x2 system 2, our quote was 5.2k provided mentioning our name otherwise they would not know. :)

Could email Cynthia frm Cool Force again to double confirm the pricing. :)

 

Share this post


Link to post
Share on other sites

Day 38 Continues

Backsplash is up and we are using glass mosiac for our backsplash

Awaiting for the cabinets and hood to be up to have a clearer overview. :)

1459922_10152419795149546_744930231_n.jp

Mold of concrete items :

1460256_10152419794694546_220074919_n.jp

Sit Down Concrete in the MBR :

581521_10152419793774546_864365114_n.jpg

Kitchen Concrete's Tiling is finally done up :

1450848_10152419795889546_80846203_n.jpg

 

Share this post


Link to post
Share on other sites

Day 39

City Gas

Gas piping for Heater and stove came. We gotten Ferrori from City Gas during their Toa Payoh event in September.

This is how we pull the gas piping, it will be conceal when the carpentry goes up.

1452550_10152422420449546_386646379_n.jp

996989_10152422420504546_1139652150_n.jp

998981_10152422420604546_731692664_n.jpg

Some other updates :

Service Yard sink is up and would need some touch up. This sink will be for cleaning dirty clothes and other cleaning apart from the kitchen sink for cooking :

1453291_10152422420749546_309120948_n.jp

Space below might be able to be our furkid's toilet :
1472839_10152422420354546_358789386_n.jp

Edited by plainsharon
 

Share this post


Link to post
Share on other sites

Day 40

Kitchen Concrete Sink

Some updates.

Progression have been slow again. Mr K was suppose to arrange for false ceiling this week but seems like he is still arranging since last week the materials have been brought over. Hmmmmm.... :(

The kitchen sink is up and 90% done. Most of my work till now have been done by 1 of Mr. K's subcon. Been really slow, was told by Mr. K that more worker will come by on the 2nd week but now have been the 2nd or 3rd and there is only 1 worker still.

1463927_10152428128954546_2031686429_n.j

Grout yet to be filled :

1477935_10152428132554546_337119733_n.jp

Bathroom's shower kerb covered up with woodtiles :

1470005_10152428129419546_1105567407_n.j

MBR bathroom sit down concrete. 100% and covered with woodtiles

1471925_10152428129509546_1764384684_n.j

Edited by plainsharon
 

Share this post


Link to post
Share on other sites

You have a furkid? Share some pix :)

I have no photos of them in the new house yet except in the first few post when we gotten our keys and my furkid was caught in the living room.

Here are some other photos of them : :notti:

564668_10152167739679546_639996837_n.jpg

1231133_10152182621529546_12849660_n.jpg

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×