retchlow 7 Report post Posted November 15, 2013 sure, go ahead & add if you don't mind my random uncouth posts on fb..lol Share this post Link to post Share on other sites
ProjectH 0 Report post Posted November 15, 2013 R there more photos? Show us on renotalk retchlow! Hee!! (Sorry to hijake ur blog sharon)Sharon, ur reno is progressing pretty fast! Looking great! Share this post Link to post Share on other sites
plainsharon 20 Report post Posted November 15, 2013 R there more photos? Show us on renotalk retchlow! Hee!! (Sorry to hijake ur blog sharon)Sharon, ur reno is progressing pretty fast! Looking great!LOL! no problem~ and thanks. Her t-blog is more detailed and much longer but i feel the fb photos are nicer to see. But its a little too little. Want to see more~sure, go ahead & add if you don't mind my random uncouth posts on fb..lol Share this post Link to post Share on other sites
plainsharon 20 Report post Posted November 15, 2013 (edited) Day 35Floor Tiles CompleteMore updatesLiving Room wood tiles complete :Tomorrow will be filling in the grouting for the wood tiles. False Ceiling will be up next week and it is safe kept in the MBR in front. Totally din't expect Mr. K to be so fast on getting the false ceiling arrange and moved in.His worker has been trying to bring across to us that after the tiling is done, Mr. K will get things moving quickly. True enuff, false ceiling is in and will be up next. Remember seeing a post about Mr. K's tiling worker. I dont think its the same tiling worker mentioned but concluded that Mr. K's tiling worker might all be having bad mood faces. This tiling worker we had a great time having him doing our tiling work but he does not likes to talk and is really serious with his work. Looking forward to the progress next. Edited December 2, 2013 by plainsharon Share this post Link to post Share on other sites
plainsharon 20 Report post Posted November 16, 2013 Day 36Aircon Piping was up days ago but could not upload as the floor tiling was on-going.Here are some of the Aircon Piping works done by Cool Force, realised that their insulation is thicker and feels different from usual insulation material. Rougher~Our Aircon were pull along the Corridoor : Share this post Link to post Share on other sites
plainsharon 20 Report post Posted November 16, 2013 Update Continues :Flooring is finally done with grout fillings Corridor :Getting Ready for tomorrow's basin work for service yard :Waste Pipe properly align and hidden Look what are these ~ Its false ceiling boards After False Ceiling is the Aircon from Cool Force will be up again, 2 x compressor and 4 units. Lastly, our properly under mounted kitchen's sink Share this post Link to post Share on other sites
freshberrie 1 Report post Posted November 16, 2013 Hi Freshberrie,You were mentioning about the chandelier which i had purchase for my friend from Taobao, Here is it :Not sure why it looks somewhat different from the one purchase from Taobaohttp://item.taobao.com/item.htm?spm=a1z0d.6639537.0.0.ndTxN9&id=6185049328&shop_id=57159195The lights came with a cover, without the cover, the lightbulbs are the same.My friend love the chandelier very much. Thank you! Can't wait to get mine, no worries now Share this post Link to post Share on other sites
tarzanboy 6 Report post Posted November 17, 2013 (edited) Hi, nice renovation you had there I am curious that is your wood tiles is part of the renovation package or you buy from hafary individual for your contractor to lay and kindly pm you qutotation price for you Mitsubishi inverter 2x 2 system 2 thank Edited November 17, 2013 by tarzanboy Share this post Link to post Share on other sites
plainsharon 20 Report post Posted November 18, 2013 Hi, nice renovation you had there I am curious that is your wood tiles is part of the renovation package or you buy from hafary individual for your contractor to lay and kindly pm you qutotation price for you Mitsubishi inverter 2x 2 system 2 thank Hi~Thanks for dropping by. My wood tiles was part of my renovation package i went down to hafary from Mr. K's recommendation that his account is under hafary and we could select tiles from 3 different places, 1 of it to be Hafary. As for the Mitsubishi Inverter 2x2 system 2, our quote was 5.2k provided mentioning our name otherwise they would not know. Could email Cynthia frm Cool Force again to double confirm the pricing. Share this post Link to post Share on other sites
plainsharon 20 Report post Posted November 18, 2013 (edited) Day 38BacksplashUpdate continuesSneak peak : Edited December 2, 2013 by plainsharon Share this post Link to post Share on other sites
plainsharon 20 Report post Posted November 18, 2013 Day 38 ContinuesBacksplash is up and we are using glass mosiac for our backsplashAwaiting for the cabinets and hood to be up to have a clearer overview. Mold of concrete items :Sit Down Concrete in the MBR :Kitchen Concrete's Tiling is finally done up : Share this post Link to post Share on other sites
plainsharon 20 Report post Posted November 19, 2013 (edited) Day 39City GasGas piping for Heater and stove came. We gotten Ferrori from City Gas during their Toa Payoh event in September.This is how we pull the gas piping, it will be conceal when the carpentry goes up.Some other updates :Service Yard sink is up and would need some touch up. This sink will be for cleaning dirty clothes and other cleaning apart from the kitchen sink for cooking :Space below might be able to be our furkid's toilet : Edited December 2, 2013 by plainsharon Share this post Link to post Share on other sites
Makanology 29 Report post Posted November 19, 2013 You have a furkid? Share some pix Share this post Link to post Share on other sites
plainsharon 20 Report post Posted November 21, 2013 (edited) Day 40Kitchen Concrete SinkSome updates.Progression have been slow again. Mr K was suppose to arrange for false ceiling this week but seems like he is still arranging since last week the materials have been brought over. Hmmmmm.... The kitchen sink is up and 90% done. Most of my work till now have been done by 1 of Mr. K's subcon. Been really slow, was told by Mr. K that more worker will come by on the 2nd week but now have been the 2nd or 3rd and there is only 1 worker still.Grout yet to be filled :Bathroom's shower kerb covered up with woodtiles :MBR bathroom sit down concrete. 100% and covered with woodtiles Edited December 2, 2013 by plainsharon Share this post Link to post Share on other sites
plainsharon 20 Report post Posted November 21, 2013 You have a furkid? Share some pix I have no photos of them in the new house yet except in the first few post when we gotten our keys and my furkid was caught in the living room.Here are some other photos of them : Share this post Link to post Share on other sites