macuser77 1 Report post Posted October 10, 2013 (edited) By the way did you guys try Hafary ?Their wood tiles are lovely and it has a more "woody" feel in our opinion. But they cost more than soon bee huat. Edited October 10, 2013 by macuser77 Share this post Link to post Share on other sites
plainsharon 20 Report post Posted October 10, 2013 By the way did you guys try Hafary ?Their wood tiles are lovely and it has a more "woody" feel in our opinion. But they cost more than soon bee huat.Thanks for your advise. Guess, we will not need to chase him when the actual reno starts next week. Anyway, we went to Hafary and short listed 1 set of wood tile from china but did not take any photo of it. While the spain wood tiles in Hafary are too "over woody"Eventually the china wood tile one we shortlist from Hafary was too rough finish compare to the one we shortlisted at Soon Bee Huat which were more smooth/gloss finish so that its easier to clean and mop in the long run. Share this post Link to post Share on other sites
macuser77 1 Report post Posted October 10, 2013 Hi Sharon,We had the same issue on rough surface wood tiles. However we managed to spot 1 at hafary that has smooth finishing. To date no issues on cleaning them or dirt being trapped. The tile reference number is D915022 (15x90). If you're still concerned over the tiles you can ask K on his pasir ris customer. HahaBy the way if he doesn't reply promptly means his scheduling his time table, and not that he has forgotten about the appointment. Sometimes no reply means consent. Haha. We were still liaising last week on additional carpentry works, and no reply on. When I called him he said "不是讲好星期六 ??" Share this post Link to post Share on other sites
macuser77 1 Report post Posted October 10, 2013 Hi Sharon, A word of reminder. He can be forgetful on minor design details, and may take his own initiative. Workmanship and quality is still uncompromised, & we were happy with the end result. So it'll be better if you'd remind him on the knitty gritty stuffs. Share this post Link to post Share on other sites
plainsharon 20 Report post Posted October 10, 2013 Hi Sharon,We had the same issue on rough surface wood tiles. However we managed to spot 1 at hafary that has smooth finishing. To date no issues on cleaning them or dirt being trapped. The tile reference number is D915022 (15x90).If you're still concerned over the tiles you can ask K on his pasir ris customer. HahaBy the way if he doesn't reply promptly means his scheduling his time table, and not that he has forgotten about the appointment. Sometimes no reply means consent. Haha. We were still liaising last week on additional carpentry works, and no reply on. When I called him he said "不是讲好星期六 ??"Yes, i saw your t-blog and was considering wanting to get your same type of tiles, further more its [15x90] that we wanted. But we could not find similar tiles like yours which were within the budget we were suppose to get.I re-look at your t-blog and I dont remember seeing your type of wood tiles at $4.10. We might go down to Hafary to take a look again with your reference number. Thanks so much!!And i realised, K take vvv long to schedule his time table. sometimes we arrange to meet up and he will say let me check my schedule then let you know, check until the day before still haven revert back then we have to call him again.Even though he did not reply we took it as consent. As we had the same situation as yours, whereby he say "不是讲好 ...." LOL! Share this post Link to post Share on other sites
lala81 3 Report post Posted October 10, 2013 (edited) i am MrModel : MXY-3A28VA (this is compressor is for system 3 but i use it for 2) / MSY-GE10VA / MSY-GE13VAFCU Capacity : Up to 10,000 Btu/hr / 13,000Btu/hr respectivelyRated Share Capacity : 8,530 Btu/hr + 11,952 Btu/hr Location : Master room & Bedroom 3 Model : MXY-3A28VA (this is compressor is for system 3 but i use it for 2)/ MSY-GE10VA(unit) / MSY-GE24VA (unit)FCU Capacity : Up to 10,000 Btu/hr / 22,000Btu/hr respectivelyRated Capacity : 7,506 Btu/hr + 17,060 Btu/hr Location : Bedroom 2 + Living Hall Very simple i want it when i on all my aircon together all my room and living room will be cool and cold. As is if you try using system 4 and on it together. its take long time to be cool. All the Btu you saw on top is calculate of space need to be cool. And i have open concept kitchen, liviing room. Since u want to on your whole house aircon on the same time, then this config is suitable for u haha I have a system 1 for MBR. Actually BTO MBR only needs 10k BTU only. unless u want to leave ur toilet door open. or wall heated by west facing.Then a 28VA system 3 for Bedroom 2, 3 and Living room/dining (24VA). If i need to switch on living room, i won't be inside the rooms. My kid will be zzzing in MBR most of the time anyway. Edited October 10, 2013 by lala81 Share this post Link to post Share on other sites
harocarlos 14 Report post Posted October 10, 2013 i am MrModel : MXY-3A28VA (this is compressor is for system 3 but i use it for 2) / MSY-GE10VA / MSY-GE13VAFCU Capacity : Up to 10,000 Btu/hr / 13,000Btu/hr respectivelyRated Share Capacity : 8,530 Btu/hr + 11,952 Btu/hr Location : Master room & Bedroom 3 Model : MXY-3A28VA (this is compressor is for system 3 but i use it for 2)/ MSY-GE10VA(unit) / MSY-GE24VA (unit)FCU Capacity : Up to 10,000 Btu/hr / 22,000Btu/hr respectivelyRated Capacity : 7,506 Btu/hr + 17,060 Btu/hr Location : Bedroom 2 + Living Hall Very simple i want it when i on all my aircon together all my room and living room will be cool and cold. As is if you try using system 4 and on it together. its take long time to be cool. All the Btu you saw on top is calculate of space need to be cool. And i have open concept kitchen, liviing room. I think this configuration suits my home too...I've never thought about this...only knew about either a system 4 or one system 1 and one system 3... may I know how much was your package with coolforce? Share this post Link to post Share on other sites
plainsharon 20 Report post Posted October 10, 2013 I think this configuration suits my home too...I've never thought about this...only knew about either a system 4 or one system 1 and one system 3... may I know how much was your package with coolforce?Hi,i have pm you Share this post Link to post Share on other sites
michaelsaw 1 Report post Posted October 11, 2013 Hi,May i have the price for ur combination of aircon?TIA Share this post Link to post Share on other sites
plainsharon 20 Report post Posted October 11, 2013 Hi,May i have the price for ur combination of aircon?TIAHi,i have pm you if you looking for cool force. just mention my name Share this post Link to post Share on other sites
plainsharon 20 Report post Posted October 17, 2013 (edited) Updates!!Day 6Today is demolish of walls for MBR, Kitchen Half Wall.Was surprise when i arrived to see items arrived at the foot of the block too. Workers were moving up the items. Only realised those items were ours when hubby when to peep at the DO.Here is the Demolished Kitchen / Dining : Half Wall hacked at the kitchen/dining [view from living room][other view from kitchen][overview from living room][leftover rumble] Edited October 18, 2013 by plainsharon Share this post Link to post Share on other sites
plainsharon 20 Report post Posted October 17, 2013 (edited) Demolished MBR / Bedroom 2 to make way for walk in waredrobe entrance :[View from MBR][view from MBR][view from Bedroom 2] *door belongs to MBR Edited October 30, 2013 by plainsharon Share this post Link to post Share on other sites
plainsharon 20 Report post Posted October 17, 2013 (edited) Other items which were delivered :[Tiles Delivered] [concrete for kitchen bottom cabinet] Edited October 30, 2013 by plainsharon Share this post Link to post Share on other sites
plainsharon 20 Report post Posted October 17, 2013 (edited) Tiles Selected[glass mosaic for back splash] [another view of the glass mosaic] pweety~ [tiles for overlay bottom kitchen concrete cabinet] looks abit dirty but its supposed to be whiter. [ Thanks to mauser77 i got the same tiles as he recommended] Looking forward for the laying of floor tiles. Edited October 30, 2013 by plainsharon Share this post Link to post Share on other sites
plainsharon 20 Report post Posted October 17, 2013 [ Mr K's workers moving the sand from bottom to the house] Initially was 2 workers and shortly after many more of them came to help out if not it will take till tomorrow till the 2 worker move up the sand. Mr K is so busy with so many projects on hand that he came to drop by and left soon after but thankfully that everything went smoothly.As so many T-blogs mentioned, Mr. K is really on the ball when the project starts, all these, hacking and delivering of the items happens on one day, Mr K really fast! Starting to think that everything happens so quickly. Lastly :Mr. K's worker accidentally broke our broom but he will replaced it. Looking forward for tomorrow Cement Screed from HDB, alias with the Cement Screed Contractor to come in the morning~ *Prays that it does not rain* Rooms are ready for Cement Screed tomorrow morning. Share this post Link to post Share on other sites