silvergorilla 1 Report post Posted June 21, 2013 K's guys working hard at compressing and leveling the cement mixed Share this post Link to post Share on other sites
silvergorilla 1 Report post Posted June 21, 2013 doing the screeding: Share this post Link to post Share on other sites
silvergorilla 1 Report post Posted June 21, 2013 meanwhile, another guy covers the kitchen tiles with plaster... we will be painting over it.... Share this post Link to post Share on other sites
silvergorilla 1 Report post Posted June 21, 2013 ok next comes the aircon... instead of asking Kevin to monitor, I decided to do it personally.... I want to avoid miscommunication as much as possible as.as usual.... aircon trunking and routing was a nightmare... we have designed the cabinetry to completely conceal the trunkings.... so if its not done right, the cabinetry cannot proceed!if everything proceed as plan, we will only have 80cm of visible trunking in the house....trunking from living room and bedroom converges and routes through the kitchen to the service yard. Share this post Link to post Share on other sites
silvergorilla 1 Report post Posted June 21, 2013 the convergence: Share this post Link to post Share on other sites
silvergorilla 1 Report post Posted June 21, 2013 (edited) the aircon position in the small bedroom was a complete mistake!...... disaster..... we have a huge eyesore trunking beside the aircon.....FAIL!in the end we paid an extra $150 for the workers to come back another day to move the aircon above the door.... sianz Edited June 21, 2013 by silvergorilla Share this post Link to post Share on other sites
silvergorilla 1 Report post Posted June 21, 2013 master bedroom installation went well... all trunking conceal by the false ceiling Share this post Link to post Share on other sites
silvergorilla 1 Report post Posted June 21, 2013 the aircon guys needed to cut a hole in order to thread the cables and copper pipes through the false ceilingsome hacking to punch a hole from the yard to the toiletand finally a pipe to direct the condensation water to the bathroom.... we had it hidden in a dark corner. Share this post Link to post Share on other sites
silvergorilla 1 Report post Posted June 21, 2013 (edited) condenser up and ready to go to the yard: Edited June 21, 2013 by silvergorilla Share this post Link to post Share on other sites
silvergorilla 1 Report post Posted June 21, 2013 (edited) all hoses lead to the yard area:the guys did a pretty good job.... very seasoned.... they tried pretty hard to accomodate my requests... Edited June 21, 2013 by silvergorilla Share this post Link to post Share on other sites
silvergorilla 1 Report post Posted June 21, 2013 cement cured and the open concept is finally ready to be furnished: Share this post Link to post Share on other sites
silvergorilla 1 Report post Posted June 21, 2013 the cement became lighter as the days went by:my contractor warned that there will eventually be hairline cracks in the floor...... gotta be mentally prepared for it: Share this post Link to post Share on other sites
macuser77 1 Report post Posted June 21, 2013 When will your carpentry be up? Share this post Link to post Share on other sites
silvergorilla 1 Report post Posted June 21, 2013 the stuff from Grafunkt and Whitewood are here:a hot and sunny day Share this post Link to post Share on other sites
silvergorilla 1 Report post Posted June 21, 2013 fridge tooixiss stainless steel sink from wasser bath: Share this post Link to post Share on other sites