silvergorilla 1 Report post Posted June 21, 2013 work in progress: Share this post Link to post Share on other sites
silvergorilla 1 Report post Posted June 21, 2013 (edited) common bathroom work in progress:i like what i see so far..... very exciting!! :fire: :fire: :fire: Edited June 21, 2013 by silvergorilla Share this post Link to post Share on other sites
silvergorilla 1 Report post Posted June 21, 2013 (edited) master bathroom work in progress: Edited June 21, 2013 by silvergorilla Share this post Link to post Share on other sites
silvergorilla 1 Report post Posted June 21, 2013 yup...... looking good... Share this post Link to post Share on other sites
silvergorilla 1 Report post Posted June 21, 2013 (edited) ok managed to catch a few mistakes with the tiling.... I do not blame them..... after a while, you do get a little dizzy.... and its takes alot of patience dealing with the hexagon mosiac..... those tiny piece are a pain in the *** to cut...contractor K caught another mistake in the football mosiac tiles that i missed......i hope we did not miss anything else .... Edited June 21, 2013 by silvergorilla Share this post Link to post Share on other sites
silvergorilla 1 Report post Posted June 21, 2013 (edited) hacking in progress... it was really fast... living/kitchen floor gone in one day!they removed all the timber skirting as well.... not sure if we should keep them Edited June 21, 2013 by silvergorilla Share this post Link to post Share on other sites
silvergorilla 1 Report post Posted June 21, 2013 (edited) all walls hacked and packed for disposal by the end of second day.super dusty... but its incredible how large the space feels right now.... wife very happy with her open concept.... :jammin: but because we removed so many walls... re routing all the available powerpoints and switches is gonna be a BIG headache.... lots to consider and coordinate..... **** sianz.... Edited June 21, 2013 by silvergorilla Share this post Link to post Share on other sites
silvergorilla 1 Report post Posted June 21, 2013 meanwhile..... on the common bathroom: Share this post Link to post Share on other sites
silvergorilla 1 Report post Posted June 21, 2013 (edited) master bathroom on track!the white grout feels strange and we manage to get contractor K and his tile to put a layer of black grout on top..... it looks much better we think:but it was too late to change the white grout in the common bathroom as it has already hardened and cured.... it was impossible to replace without chipping the tiles :bangwall: ...... big mistake.... i guess its something we have to live with. Edited June 21, 2013 by silvergorilla Share this post Link to post Share on other sites
art00609 1 Report post Posted June 21, 2013 hi silvergorilla,nice house you got there and you got Mr K too! he is really fun & nice to work with he told me that your house is going to be really nice (banyak cantik in malay) ! so definitely will be following your posts so far so good right...hehhe mine is waiting for carpentary only looking forward to more beautiful pictures of your reno journey regardsart00609 Share this post Link to post Share on other sites
silvergorilla 1 Report post Posted June 21, 2013 Hi art00609,haha, thanks! yeah he is a joy to work with, very responsive and accomodating...... and things can move very fast as long as its not CNY or Xmas.do u have a reno blog too? Share this post Link to post Share on other sites
macuser77 1 Report post Posted June 21, 2013 hi silvergorilla,nice house you got there and you got Mr K too! he is really fun & nice to work with he told me that your house is going to be really nice (banyak cantik in malay) ! so definitely will be following your posts so far so good right...hehhe mine is waiting for carpentary only looking forward to more beautiful pictures of your reno journey regardsart00609Mr k told us the same thing too! He said your house "会很美!" Share this post Link to post Share on other sites
art00609 1 Report post Posted June 21, 2013 Hi art00609,haha, thanks! yeah he is a joy to work with, very responsive and accomodating...... and things can move very fast as long as its not CNY or Xmas.do u have a reno blog too?yup yup I have one too...mine is the "too fast, too tiny 4room @punggol"macuser77, Mr K said the same thing to you too btw, both of us r in the "Mr K club"...so welcome to the "club" too i am so looking forward to seeing your reno journey Share this post Link to post Share on other sites
silvergorilla 1 Report post Posted June 21, 2013 yup yup I have one too...mine is the "too fast, too tiny 4room @punggol"macuser77, Mr K said the same thing to you too btw, both of us r in the "Mr K club"...so welcome to the "club" too i am so looking forward to seeing your reno journey woah check out your blog..... is really too fast!!.... mine had a lot of delay as we started during the CNY period.... carpentry long Q sia...marcuser77 and art00609 all kenna poisoned by pinkwhale and paloma...mr K is also very good at managing our expectations i think.... haha.... Share this post Link to post Share on other sites
silvergorilla 1 Report post Posted June 21, 2013 (edited) I requested for metal strips to partition the cement screed floor to reduce hairline cracks..... sand, cement mixed and poured Edited June 21, 2013 by silvergorilla Share this post Link to post Share on other sites