Aash 0 Report post Posted June 17, 2013 (edited) Hi there.I nee to renovate my kitchen and 2 toilets. Works consists of hacking wall and floor tiles and cabinet. Lay new floor tiles and full high wall tiles. Water proofing. Kitchen cabinet installation.Can all these be completed within 2-3 weeks? Am tight as I am sellingand buying flat so need to have reno done in 3 weeks. Edited June 17, 2013 by Aash Share this post Link to post Share on other sites
ganglong 0 Report post Posted June 18, 2013 Hi Aash, what type of property...? Share this post Link to post Share on other sites
Aash 0 Report post Posted June 18, 2013 4rm hdb flat Share this post Link to post Share on other sites
witty 2 Report post Posted June 19, 2013 Hi Aash i was in a similar position as you before. Only have 4 wks exactly for my reno. Need to do up kitchen, 2 toilets, plastering, rewiring, change all doors, windows, polishingof existing marble. Nd to do all that in 4 wks as we need to move uot from our previous houseand got no place to stay. Ask for quotation from few contractors and finally we decided to engagea contractor recommended from a fellow forumer here. Told us he can't promise but he will try toget our place ready by the 4th wks. And he did deliver what he said. If you want the contractor number do pm me. Here's the link for my reno post. http://www.renotalk.com/forum/topic/53820-my-4-rm-flat/ Share this post Link to post Share on other sites