Mormor2013 0 Report post Posted May 15, 2013 Yes.. He and his 2 workers are good.Bought this floor trap a bit too late, as the waterproofing has been done, can't install it anymore Got it from Heritage Bathroom. It's a hidden floor trap, as shown at Sohnice's t-bloghttp://www.renotalk.com/forum/topic/45539-3-room-hdb/page-11Bought it at $30 eachWilling to let go at $40 for 2.Any takers? Share this post Link to post Share on other sites
jus4fun 4 Report post Posted May 15, 2013 Hi Mormor, welcome to the 3-roomers' club and to RT! Njoy ur reno journey! Will be following ur progress & updates so keep them coming! Good leh, got additional utility rm behind (the kitchen?) but u nvr show pic of this part of the kitchen leh. If I got such an additional utility rm, i will hack away my storeroom that comes between my living rm & kitchen. In fact, i hack away the original & re-built it into the kitchen area (my original kitchen like urs very big) to create a bigger living room to house a dining area (used to have dining tabel in kitchen). We still need a storeroom la to keep all the bulky & 'unsightly' stuff.. haha! Share this post Link to post Share on other sites
Makanology 29 Report post Posted May 15, 2013 Got it from Heritage Bathroom. It's a hidden floor trap, as shown at Sohnice's t-bloghttp://www.renotalk.com/forum/topic/45539-3-room-hdb/page-11Bought it at $30 eachWilling to let go at $40 for 2.Any takers?Sorry to hear about the sink trap. In the end, what did you use?Today we managed to tell Uncle Ah Meng in time about our TB sink traps. Size of ours bit smaller but Uncle said can still use. But he now has to raise our bathroom floors cos our sink traps are thicker than those used in Singapore. Share this post Link to post Share on other sites
Makanology 29 Report post Posted May 15, 2013 Alan is doing re-wiring and plastering work for your place now? How about plumbing? We are trying to figure out what he is doing next for us after tiling. Share this post Link to post Share on other sites
Mormor2013 0 Report post Posted May 15, 2013 Hi Mormor, welcome to the 3-roomers' club and to RT! Njoy ur reno journey! Will be following ur progress & updates so keep them coming! :)Good leh, got additional utility rm behind (the kitchen?) but u nvr show pic of this part of the kitchen leh. If I got such an additional utility rm, i will hack away my storeroom that comes between my living rm & kitchen. In fact, i hack away the original & re-built it into the kitchen area (my original kitchen like urs very big) to create a bigger living room to house a dining area (used to have dining tabel in kitchen). We still need a storeroom la to keep all the bulky & 'unsightly' stuff.. haha!The extra room is behind the kitchen.It has the most windows and the best view. Share this post Link to post Share on other sites
Mormor2013 0 Report post Posted May 15, 2013 Sorry to hear about the sink trap. In the end, what did you use?Today we managed to tell Uncle Ah Meng in time about our TB sink traps. Size of ours bit smaller but Uncle said can still use. But he now has to raise our bathroom floors cos our sink traps are thicker than those used in Singapore. In the end we use the typical floor trap, stainless steel instead of the plastic one.Alan is doing re-wiring and plastering work for your place now? How about plumbing? We are trying to figure out what he is doing next for us after tiling.Tiling finished on Monday.Plastering started on Tuesday, 90% done by end of today.Rewiring will start tmr after the plastering work.WC installlation & plumbing will also start tmr.Might be meeting carpenter this sat. Share this post Link to post Share on other sites
Makanology 29 Report post Posted May 15, 2013 Tiling finished on Monday.Plastering started on Tuesday, 90% done by end of today.Rewiring will start tmr after the plastering work.WC installlation & plumbing will also start tmr.Might be meeting carpenter this sat.Wow thanks for sharing your timeline. That will serve as a good guide for us on the things we need to arrange eg aircon installation, WC delivery etc! I hope ours will also go as smooth as yours When are you aiming to move in? Share this post Link to post Share on other sites
bSeek 0 Report post Posted May 15, 2013 Hi welcome to Club Alanists and the 3-roomers! Haha yesterday the tiler also proposed to us to use the wood tiles for our stairs. 'Wooden' stairs looks awesome right?spiffy! is it slippery when wet from rain? Share this post Link to post Share on other sites
Mormor2013 0 Report post Posted May 15, 2013 (edited) Wow thanks for sharing your timeline. That will serve as a good guide for us on the things we need to arrange eg aircon installation, WC delivery etc! I hope ours will also go as smooth as yours When are you aiming to move in?We bought the WC and some other accesories from Alan's recommended shop at AMK.Price is quite similar as those shop at Jalan Besar.So he'll arrange for the delivery for us.The auspicious date to move in for us early June.But we can still let him touch up until end of June. Edited May 15, 2013 by Mormor2013 Share this post Link to post Share on other sites
Makanology 29 Report post Posted May 15, 2013 We bought the WC and some other accesories from Alan's recommended shop at AMK.Price is quite similar as those shop at Jalan Besar.So he'll arrange for the delivery for us.Haha he never recommended any AMK shop but instead Poh Seng @ Jalan Besar. However we ended up buying from Royal Fanco so we have to coordinate all the deliveries ourselves. Share this post Link to post Share on other sites
Mormor2013 0 Report post Posted May 15, 2013 spiffy! is it slippery when wet from rain?I used the wood tiles for the kitchen floor, it's rough enough.The corridor in front of my unit is super wide.Not likely it will get wet from rain. Share this post Link to post Share on other sites
Makanology 29 Report post Posted May 15, 2013 Same same but I think we have to move in by 31 May. Current lease ends by then. Anyways for carpentry, we are only doing kitchen cabinets with Alan. So he only needs to ensure MBR, bathroom & study room, electrical, plumbing & painting is done by then. Kitchen cabinet & touch-up can be done slowly in June. Share this post Link to post Share on other sites
jaykr 0 Report post Posted May 15, 2013 Hello! Welcome to Club Alanist as MK said earlier! Ah Meng is my view was very nice and helpful and helped a lot especially when I had so carry many craftbricks / Stones to carry to my place. ;p They all helped in carrying it!His work was very good for my place. Share this post Link to post Share on other sites
jus4fun 4 Report post Posted May 16, 2013 The extra room is behind the kitchen. It has the most windows and the best view. oh it's like an extension of the kitchen. thought it's an enclosed rm. but nice lah! make the kitchen even brighter & airier! thumps up! Share this post Link to post Share on other sites
Esuper 0 Report post Posted July 16, 2013 Hi, Yes.. He and his 2 workers are good.Bought this floor trap a bit too late, as the waterproofing has been done, can't install it anymore Got it from Heritage Bathroom.It's a hidden floor trap, as shown at Sohnice's t-bloghttp://www.renotalk.com/forum/topic/45539-3-room-hdb/page-11Bought it at $30 eachWilling to let go at $40 for 2.Any takers?PM me please. Thanks Share this post Link to post Share on other sites