nemo0927 0 Report post Posted April 8, 2013 Hey guys, im a noob in renovation as this is my 1st owned property. BTO shd be ready end this year or early next year but not sure when is the best time to ask for quote cos it may not apply when keys come. Its a HDB standard 4 room unit and i opted for all the doors and tiles. just wonder how much is needed for renovation and furnishing to plan for?My requirement1. Living room, simple feature wall, built in TV console, cushioned cupboard under the window (my window is 3 qtr length)2. Kitchen cabinets3. One of the rooms will be used as walk in wardrodes (built in)4. Painting5. Furniture and electronics planning to have those essential one 1st (master bed, sofa, dining table, lightings, washing machine,TV)Like that $25K enuff? floor area about 93m2. Share this post Link to post Share on other sites
jeffwei 1 Report post Posted April 13, 2013 25k may not be enough with all the things you want, the carpentry work cost morw than 10k the rest like electric and lighting with ceiling and painting and all the small items about 10 k also, left 5 k for sofa tv and bed not forgeting the heater and cooker it be safe save up about 30-35k for your renovation. Share this post Link to post Share on other sites