kooky

K's Home

Recommended Posts

Looking for good contractors? Click here for your request

In case, we changed our mind later to move furniture around, buying a TV console off the rack seems make more sense than custom-made one which cost more.

After spending hours in the shopping mall, we have decided on this (nothing fanciful but simple design) for our Ivory sofa set and black coffee table.

tvconsole.jpg

Which furniture mall did u buy from?
 

Share this post


Link to post
Share on other sites

We bought this from Sin Hup Furniture at 10 Toh Guan Road

Which furniture mall did u buy from?

Edited by kooky
 

Share this post


Link to post
Share on other sites

Vanity tops (solid top surface) are finally up in both bathrooms.

Common bathroom on 2nd floor

cmbrvanitytop.jpg

Bathroom in master bedroom

mbrvanitytop.jpg

Edited by kooky
 

Share this post


Link to post
Share on other sites

Structure of kitchen carpentry work (below window recess area) is up.

kitchenrecessstorage.jpg

Top and bottom cabinets in the service yard where the sink is located.

kitchencabinet2.jpg

From sink/service yard area into the kitchen where stove and hood will be installed. Image 1

kitchencabinet1.jpg

Image 2

kitchencabinet.jpg

My apologies, the image is blurry. A walk-in toilet. Built-in oven and microwave oven will be placed on the left-hand side on the shelves. Right-hand side will be some pull-out storage (e.g. tomatoes, potatoes etc). Top cabinets for more storage of items.

storageoutsidetoilet.jpg

 

Share this post


Link to post
Share on other sites

Thanks, Makanology :-)

We didn't have any space planning beforehand and we started renovating our flat without a theme. Through months of renovation, we (contractor and us) have lots of discussions on how we can create more storage space for our small kitchen. I have to applause my contractor for being so patience and he has indeed come up with a few good ideas which we never thought it would work.

There will be minor works even after our move but these are acceptable.

Edited by kooky
 

Share this post


Link to post
Share on other sites

Met up with the curtain/blinds guy. He took measurement of all the windows and recommended blinds instead of curtains to us according to our needs and requirements. He is fully aware that we are moving into the flat on May 10th and even if he try to rush the worker to make these blinds, it will take 8-9 days to complete 9 sets.

 

Share this post


Link to post
Share on other sites

This evening, we decided to go to the flat to inspect on the progress of the carpentry works as we were quite disappointed on our last visit on Sunday that the laminate doors/drawers and the cabinets are not up.

When we arrived, it was almost 6:30pm and was surprised that there are 3 men working.

Here are some shots we took and quite happy that they have cleaned up the floors and also done 70% of the carpentry works but still there are glass works that need to be done before home appliances can be installed.

Common toilet on 1st floor (didn't turn on the light). Didn't take the other side of the wall where shower head is installed because the worker is fixing some stuff up.

1stflrtoilet.jpg

Bathroom in Master bedroom. Might request the contractor to move the washbasin slightly to the right-hand side so that is not too close to the toilet bowl.

mbrtoilet.jpg

Edited by kooky
 

Share this post


Link to post
Share on other sites

Shoes cabinet is up! Black to match my dinning set.

shoescabinet.jpg

Kitchen cabinets in the sink area/yard. Glass work and sink are not installed.

carpentry1.jpg

Carpentry works in the living room. Some display shelves and cabinets that we decided to have just last week.

carpentry.jpg

Edited by kooky
 

Share this post


Link to post
Share on other sites

Cupboard at the hallway on 2nd floor. To store towels, bedsheets and blankets but can also put our luggage bags when shelves are removed.

hallwaycarpentry.jpg

Ignore that woman in the reflection of the glass panel; she is me.......LOL

 

Share this post


Link to post
Share on other sites

Wardrobe in my daughter's room

kwardrobe.jpg

Wardrobe in our bedroom.

mbrwardrobe.jpg

TV console and drawers under the window recess area in the Master bedroom

mbrcarpentry.jpg

Due to budget constraint, we did not do up the guest's room. However, we will acquire some off the shelves furniture to furnish that room over the next couple of months since we do not normally have guest who will stay overnight.

 

Share this post


Link to post
Share on other sites

Acid wash has been done and sofa set will be delivered in late afternoon today. Some glass works in the living area, MBR bathroom and kitchen will be installed today or tomorrow. The rest of the carpentry works in the kitchen should be up latest by tomorrow.

Our packing is 75% completed.

According to my contractor, there will be minor touch-up and installation of the breakfast counter top will only be done after we've move-in which we feel it's not a drama and we can live without the breakfast top temporarily.

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×