kooky

K's Home

Recommended Posts

Hi sherting, it was originally a PLC light but we have requested to change it to LED light. It is a 40W LED for the kitchen. The cost is $238 before GST.

 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

We chose this quartz for our kitchen top to match the laminate that's selected.
blackstark.jpg

Edited by kooky
 

Share this post


Link to post
Share on other sites

The workers are sanding the parquet floor and the newly installed treads on the first flight of stairs.

Image 1 - Guest's Room

parquetfloor1.jpg

Image 2 - Our daughter's room

parquetfloor2.jpg

Image 3 - Master Bedroom

parquetfloor4.jpg

Image 4 - Hallway

parquetfloor3.jpg

Image 5 - Stairs.

Treads on the lower flight are new. We retain the treads on 2nd floor to save cost. Is there a big difference in colour?

parquetfloor5.jpg

Edited by kooky
 

Share this post


Link to post
Share on other sites

I understand u changed the orientation of ur lower flight of stairs. Is the gradient the same as before? Any reason for the change? Fengshui reason?

 

Share this post


Link to post
Share on other sites

We don't believe in FS. If go by FS theory, our layout has lots of taboos and we are doomed......LOL

Change the direction of the stairs for (1) to breaks the eyeline sight between the entrance and the living area; meaning people walking past the corridor do not look right into the living area (2) to create more space for our round dining table

The gradient looks almost the same. I didn't really check but contractor said same.

Edited by kooky
 

Share this post


Link to post
Share on other sites

Use Panorama effect of the cellphone to take this image. View is taken from Kitchen.

overview1l.jpg

Image 1 - View from Master bedroom with lights switched on

mbrn.jpg

Image 2 - Bathroom in Master bedroom.

mbr1.jpg

Image 3 - View from my daughter's room

daughtersroom.jpg

Edited by kooky
 

Share this post


Link to post
Share on other sites

Last visit to the flat was last Sunday. After 4 days, finally carpentry work has started!

I can see some carpentry works done in the dinning area, living area and bedrooms and the glass railings on the first flight of stairs are installed.

Carpentry work at recess area below windows in the living area (Image 1)

livingrmcarpentry1.jpg

(Image 2)

livingrmcarpentry2.jpg

Wardrobe in Master bedroom (Image 3)

mbr2brmcarpentry1.jpg

Wardrobe in Daughter's bedroom (image 4)

kcarpentry.jpg

Edited by kooky
 

Share this post


Link to post
Share on other sites

Carpentry work (vanity aera) and glass door is installed in the MBR's bathroom

mbrglassdoor.jpg

When glass door is closed

mbrglassdoor1.jpg

Carpentry work and glass door in Common bathroom.

entrancecbrglassdoor.jpg

Shower screen + glass door in the Common bathroom.

commonbrglassworks.jpg

We asked the carpenter to built a cupboard in the hallway (next to the common bathroom and outside my daughter's room) for storage of towels/bedsheets/pillow cases etc

hallwaycarpentry.jpg

Edited by kooky
 

Share this post


Link to post
Share on other sites

Tempered glass railings for the 1st flight of stairs have been installed.

Image 1

glassrail.jpg

Image 2 (left hand side, below the windows the structure of the shoes cabinets is built)

glassrailshoecabinet1.jpg

Image 3

glassrailshoecabinet.jpg

 

Share this post


Link to post
Share on other sites

Thanks, HappyAng.

He said most likely on April 20th but by the look of the progress I wouldn't hold my breath.

9 more days.. I help u countdown.. :sport-smiley-004:

Must press contractor when date is near. I went down on site everyday this week just to ensure things are done correctly and speed up the process.

 

Share this post


Link to post
Share on other sites

Thanks heap......LOL.

I went down last Sunday and then this afternoon. I can't afford to go down daily as everyday when I go during lunch hour, I ended up with an extended lunch break! If this goes on, I might lose my job! My spouse used to go down in my absence but he is away on a business trip since last week.

 

Share this post


Link to post
Share on other sites

Thanks heap......LOL.

I went down last Sunday and then this afternoon. I can't afford to go down daily as everyday when I go during lunch hour, I ended up with an extended lunch break! If this goes on, I might lose my job! My spouse used to go down in my absence but he is away on a business trip since last week.

Congrats on ur near completion .... soon it would be over. You glass panels for the staircase look great!

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×