kooky 2 Report post Posted April 2, 2013 Hi sherting, it was originally a PLC light but we have requested to change it to LED light. It is a 40W LED for the kitchen. The cost is $238 before GST. Share this post Link to post Share on other sites
kooky 2 Report post Posted April 3, 2013 (edited) We chose this quartz for our kitchen top to match the laminate that's selected. Edited April 23, 2013 by kooky Share this post Link to post Share on other sites
kooky 2 Report post Posted April 5, 2013 (edited) Lights and ceiling fans are up! Living Area Edited April 5, 2013 by kooky Share this post Link to post Share on other sites
kooky 2 Report post Posted April 5, 2013 (edited) The workers are sanding the parquet floor and the newly installed treads on the first flight of stairs.Image 1 - Guest's Room Image 2 - Our daughter's roomImage 3 - Master BedroomImage 4 - HallwayImage 5 - Stairs. Treads on the lower flight are new. We retain the treads on 2nd floor to save cost. Is there a big difference in colour? Edited April 5, 2013 by kooky Share this post Link to post Share on other sites
potatoes 0 Report post Posted April 5, 2013 I understand u changed the orientation of ur lower flight of stairs. Is the gradient the same as before? Any reason for the change? Fengshui reason? Share this post Link to post Share on other sites
kooky 2 Report post Posted April 5, 2013 (edited) We don't believe in FS. If go by FS theory, our layout has lots of taboos and we are doomed......LOLChange the direction of the stairs for (1) to breaks the eyeline sight between the entrance and the living area; meaning people walking past the corridor do not look right into the living area (2) to create more space for our round dining tableThe gradient looks almost the same. I didn't really check but contractor said same. Edited April 23, 2013 by kooky Share this post Link to post Share on other sites
kooky 2 Report post Posted April 6, 2013 (edited) Use Panorama effect of the cellphone to take this image. View is taken from Kitchen.Image 1 - View from Master bedroom with lights switched onImage 2 - Bathroom in Master bedroom.Image 3 - View from my daughter's room Edited April 6, 2013 by kooky Share this post Link to post Share on other sites
kooky 2 Report post Posted April 11, 2013 (edited) Last visit to the flat was last Sunday. After 4 days, finally carpentry work has started!I can see some carpentry works done in the dinning area, living area and bedrooms and the glass railings on the first flight of stairs are installed. Carpentry work at recess area below windows in the living area (Image 1)(Image 2)Wardrobe in Master bedroom (Image 3)Wardrobe in Daughter's bedroom (image 4) Edited April 11, 2013 by kooky Share this post Link to post Share on other sites
kooky 2 Report post Posted April 11, 2013 (edited) Carpentry work (vanity aera) and glass door is installed in the MBR's bathroomWhen glass door is closedCarpentry work and glass door in Common bathroom.Shower screen + glass door in the Common bathroom.We asked the carpenter to built a cupboard in the hallway (next to the common bathroom and outside my daughter's room) for storage of towels/bedsheets/pillow cases etc Edited April 11, 2013 by kooky Share this post Link to post Share on other sites
kooky 2 Report post Posted April 11, 2013 Tempered glass railings for the 1st flight of stairs have been installed.Image 1Image 2 (left hand side, below the windows the structure of the shoes cabinets is built)Image 3 Share this post Link to post Share on other sites
HappyAng 0 Report post Posted April 11, 2013 Looking good! When can ur contractor handover the unit back to u? Share this post Link to post Share on other sites
kooky 2 Report post Posted April 11, 2013 Thanks, HappyAng.He said most likely on April 20th but by the look of the progress I wouldn't hold my breath. Share this post Link to post Share on other sites
HappyAng 0 Report post Posted April 11, 2013 Thanks, HappyAng.He said most likely on April 20th but by the look of the progress I wouldn't hold my breath.9 more days.. I help u countdown.. Must press contractor when date is near. I went down on site everyday this week just to ensure things are done correctly and speed up the process. Share this post Link to post Share on other sites
kooky 2 Report post Posted April 11, 2013 Thanks heap......LOL. I went down last Sunday and then this afternoon. I can't afford to go down daily as everyday when I go during lunch hour, I ended up with an extended lunch break! If this goes on, I might lose my job! My spouse used to go down in my absence but he is away on a business trip since last week. Share this post Link to post Share on other sites
potatoes 0 Report post Posted April 11, 2013 Thanks heap......LOL. I went down last Sunday and then this afternoon. I can't afford to go down daily as everyday when I go during lunch hour, I ended up with an extended lunch break! If this goes on, I might lose my job! My spouse used to go down in my absence but he is away on a business trip since last week.Congrats on ur near completion .... soon it would be over. You glass panels for the staircase look great! Share this post Link to post Share on other sites