Xuxy 0 Report post Posted February 3, 2013 Can I check why some woodwork contractor charge 400rm per foot run while another charge 600 to 700rm per ft run. Do they use better material or just same. Thank you Share this post Link to post Share on other sites
jeff23 0 Report post Posted February 25, 2013 400 pfr??? Thats so ex Share this post Link to post Share on other sites
KuanWei82 0 Report post Posted February 27, 2013 Can I check why some woodwork contractor charge 400rm per foot run while another charge 600 to 700rm per ft run. Do they use better material or just same. Thank youRM400 is it? not sure abt JB price but i think mine in SG is ard 110/ft.. Share this post Link to post Share on other sites