bbshares 0 Report post Posted February 3, 2013 On the 4th Days.... of reno.... update1. Living room -- eh seems like no change leh (4th days)2. view from Living room towards the Kitchen (4th Days) - blemish my contract and my pictures as i promise him that i would not show his face and i also quite shy.3. Master Bedroom 4th days4. Bedroom 2 on the 4th days5. Bedroom 3 on the 4th dayswall tiles for kitchen is up.... other than that on 4th days its even more messier than 1st day.... i still want my marble tiles... Share this post Link to post Share on other sites
bbshares 0 Report post Posted March 5, 2013 was very very busy with house moving and its has been over more like a month since i move here.. things are not getting ready yet... Share this post Link to post Share on other sites
bbshares 0 Report post Posted March 5, 2013 think will just straight away post the after finish job in one or two days time... have so many books.. really not sure how to store stuff as i realize i have too many stufff..any suggestion ? Share this post Link to post Share on other sites
Makanology 29 Report post Posted March 5, 2013 (edited) Time for spring cleaning? keep those you need only & donate the rest to Salvation Army?Will wait here for your post-reno pics. Like your broken marble flooring! Edited March 5, 2013 by Makanology Share this post Link to post Share on other sites
Z3phy 2 Report post Posted March 7, 2013 I think we have almost the same things done up by our respective previous owners! Roman pillars, cornies, broken marble flooring... But unlike you, im not keeping the flooring. Not my cup of tea. All must go! U wan store permanent or temp? If temo can try storage warehouses. Share this post Link to post Share on other sites
bbshares 0 Report post Posted March 14, 2013 1. the TV console at the living room 2. The Kitchen Cabinet and the table top3. Master Bedroom toilet4. Master bedroom Share this post Link to post Share on other sites
bbshares 0 Report post Posted March 14, 2013 Thanks Makanology for your words of compliment and thank you for waiting, actually thanks to my contractor, he is the one who ask me to keep the flooring since its in good condition and broken marble are cooling and suitable for our weather here in singapore during...oh well... need to do alot of "SUPER SPRING CLEANING"... Z3phy .. oh well guess people at that time like this kind of design...hahaha, hope all went well with your reno ? At first we want to hack off the marble too... but since the contractor said the flooring still in good condition so decided to keep to save reno cost .... haha.. Share this post Link to post Share on other sites
bbshares 0 Report post Posted March 14, 2013 At first i did not want to use this contractor as he actually sound quite lukewarm over the phone as in meeting me, as i have not got my keys yet, and he prefer to survey on site and give quote on site, but then after i called my friend, he insisted me to get him, so i called him and meet up with him, he gave me lots of assurance, well i am in tight budget, really tight and yet my significance other demand good quality and fast must be done before Chinese New Year.... so it's a big challenge, anyway i feel i can trust him so i sign up with him on next week. have not yet settle from house moving, still like what Makanology said .... have too much things to donate to people due to no store room... so was busy tidy up and also working and cleaning.... so sorry for the slow updating, cos most of the time was so tired tidy up and thinking how to arrange furniture.... cannot believe still tidy up after few weeks moving in..Well not all went well after settling in, still have some "touch up" need to get done by the contractor, such as the toilet grouting, anyway, the contractor say anything just call him, so there some small small things that need to "touch up" .. i am consolidating everything that need touch up and will call him to do it in one shot.the only bad thing about this contractor is he is quite forgetful... you need to keep on reminding him as he don't take down notes... so most of the times i take down notes and remind him, since he do his best to keep his promise, things that he said he will do it and give discount or he did not charge as long as he mention, he will keep it...(after some reminder from me of course)Personally i think his workmanship is about 7/10, not so perfect, still you can ask him to do touch up and follow up, maybe because its chinese new year rushing job, but still grateful he can finish nicely for us and for this guy you may need to see him at least once a week as in deciding what you want to do for the house, since no 3D pictures to show, because i meet him at least once a week to check on the house progress and deciding on those toilet stuff, lightings so on and so forth.. in terms of responsibility he is 9/10.. he is a responsible guy as in he return your calls. he is not a perfect contractor, but glad for his help in finishing the job fast, with follow up, advice, i think he is honest also can be trusted and definitely cost me lesser with no headache and i can sleep at night knowing the job is going to be on time... hahahaha... In future if i have more problems in my house as in change the fan, change the lighting, or just renovate again ( which i think not going to happen at least in the next 10 years) i will just drop a call him for the jobs.. to me its easier...for those who may need to visualize via 3D pictures so to get better idea on the flat and need someone to monitor the progress for you due to tight work schedules and don't mind paying higher, ID would be a better choice Share this post Link to post Share on other sites
bbshares 0 Report post Posted March 14, 2013 oh ya this is the wardrobe design that i opted for my MBR...ya its white and its sliding.... oh well prefer simple design.... that's all for tonight folks! Good night ! Share this post Link to post Share on other sites
Makanology 29 Report post Posted March 14, 2013 Post some pix when your furniture is here Share this post Link to post Share on other sites
Z3phy 2 Report post Posted March 21, 2013 We hacked the floor coz the theme could clash.White and black.. then with green broken marble. NONONO!lol. so hack lo. usually contractor dun like to hack marble.. coz very hard. alot of effort required. so far hacking is done for my place. starting with plastering and tiling onle =) long way to go. Share this post Link to post Share on other sites
spikedoll 2 Report post Posted March 21, 2013 I like your kitchen and toilet wall tiles ! Nice ! Share this post Link to post Share on other sites
Z3phy 2 Report post Posted March 22, 2013 yup.. agree with spikedoll.Kitchen colors very pleasant. Share this post Link to post Share on other sites