aurora83 1 Report post Posted December 2, 2012 Hi all,I intend to do the sourcing of the individual contracttors myself. Be it installing of aircon to assembly of kitchen furniture etc.If i get the keys of a new BTO flat, what are the steps that I need to do for renovation? Do i install aircon first then lay the tiles etc? Share this post Link to post Share on other sites
Joanne Chua 0 Report post Posted December 3, 2012 Do the works usually in this sequence/concurrentlyDesign planningHackingTiling wet worksElectrical / air con pipingShower screens / aluminium worksceiling partition worksPlumbingPaintingLightingsLaminated floor if anycarpentry / mirrorsCountertops/glass backsplashElectrical finish upPlumbingcleaningID have sub-contractors for all above doing all above works. You can also engage direct contractors like you have suggested doing it yourself and save some money. The only problem is you have many parties to coordinate and be at site many times. Also need to coordinate with different contractors when plans changes or modifications arise. There are also direct contractors who do multiple trades or works and reduce the amount of coordination needed. I did mine using one contractor K with own workers covering hacking, tiling, painting, electrical, plumbing, ceiling and laminate flooring. If you are keen, I can PM you his contact.can PM me contact pls.. thanx Share this post Link to post Share on other sites
aurora83 1 Report post Posted December 3, 2012 Do the works usually in this sequence/concurrentlyDesign planningHackingTiling wet worksElectrical / air con pipingShower screens / aluminium worksceiling partition worksPlumbingPaintingLightingsLaminated floor if anycarpentry / mirrorsCountertops/glass backsplashElectrical finish upPlumbingcleaningID have sub-contractors for all above doing all above works. You can also engage direct contractors like you have suggested doing it yourself and save some money. The only problem is you have many parties to coordinate and be at site many times. Also need to coordinate with different contractors when plans changes or modifications arise. There are also direct contractors who do multiple trades or works and reduce the amount of coordination needed. I did mine using one contractor K with own workers covering hacking, tiling, painting, electrical, plumbing, ceiling and laminate flooring. If you are keen, I can PM you his contact.Is the service and worksmanship good? Don't want to kenna those who always do shortcut here and there Share this post Link to post Share on other sites
aurora83 1 Report post Posted December 5, 2012 They are responsive and workmanship good by my standard, don't know about yours. One experience which I am impressed, the boss came in after they install a third of the mosaic wall in my toilet. He told his workers to hack and redo at his material costs as he is not happy with the alignment. Mosaic at $19 per sheet of 300 x 300 is not cheap. I only realized that when I came in and asked him what happened to the nearly half done mosaic wall? I would say they are contractor but more like ID with added advantage of having own workers of hacking, tiling, painting, plumbing, electrical, ceiling partition, marble polishing, laminate floor installation and carpentry. They handled the whole house renovation and I deal with only one guy.Can you give me his contact please? Thanks. Share this post Link to post Share on other sites
petertan 0 Report post Posted December 9, 2012 i can pm you the contact of direct factory for granite kitchen top. Share this post Link to post Share on other sites
eaglef18 1 Report post Posted December 9, 2012 i can pm you the contact of direct factory for granite kitchen top.Hi, can forward me the contact of the contact for direct factory for granite kitchen top. Thank you. Share this post Link to post Share on other sites
ngensys 0 Report post Posted March 3, 2013 Do the works usually in this sequence/concurrentlyDesign planningHackingTiling wet worksElectrical / air con pipingShower screens / aluminium worksceiling partition worksPlumbingPaintingLightingsLaminated floor if anycarpentry / mirrorsCountertops/glass backsplashElectrical finish upPlumbingcleaningID have sub-contractors for all above doing all above works. You can also engage direct contractors like you have suggested doing it yourself and save some money. The only problem is you have many parties to coordinate and be at site many times. Also need to coordinate with different contractors when plans changes or modifications arise. There are also direct contractors who do multiple trades or works and reduce the amount of coordination needed. I did mine using one contractor K with own workers covering hacking, tiling, painting, electrical, plumbing, ceiling and laminate flooring. If you are keen, I can PM you his contact.Hi can PM the contacts? Looking for a contractor for my 4rm flat. Share this post Link to post Share on other sites
happytogether 0 Report post Posted March 5, 2013 Can PM the contact? Thx Share this post Link to post Share on other sites
happytogether 0 Report post Posted March 5, 2013 Can PM the contact? Thx Share this post Link to post Share on other sites
tcm 3 Report post Posted March 6, 2013 Hi Hyberg3,Can PM me yr contractor contacts ? Thanks. Share this post Link to post Share on other sites
ZiezLisa 0 Report post Posted March 7, 2013 (edited) PM me Mr K contact too! Thanks! Edited March 7, 2013 by ZiezLisa Share this post Link to post Share on other sites
vw7983 0 Report post Posted March 8, 2013 hi can PM Ken's contact? thanks.is he the famous Mr K in t-blog? Share this post Link to post Share on other sites
choi 0 Report post Posted March 8, 2013 Hi, appreciate if you can PM me the contact. I'm collecting keys to my place this month. Share this post Link to post Share on other sites