jsll 2 Report post Posted December 17, 2012 Super nice ideas! I love your big space and recreated layout and space.Looking forward to see more hoots of your Reno journey. Share this post Link to post Share on other sites
adidaem 6 Report post Posted December 17, 2012 Nice inspiration pics! Unfortunately HDB ceilings tend to be low and pose a challenge to achieving an airy feel. Looking forward to see your end results. Share this post Link to post Share on other sites
clouds00007 1 Report post Posted December 18, 2012 Nice inspiration pics! Unfortunately HDB ceilings tend to be low and pose a challenge to achieving an airy feel. Looking forward to see your end results. ya. everyone is telling me that Top flr units come with higher ceiling. but after getting the keys,i know that its not true anymore. Share this post Link to post Share on other sites
clouds00007 1 Report post Posted December 30, 2012 (edited) We just had our housewarming yesterday, though there was this big storm in the afternoon, on the overall, it was a pleasant one.Here, I would like to express my thanks to my friends and relative who came to express their well wishes and appreciation to our home.Ok, enough blabbering, here comes the photos of the House before we dismantle and rebuilt it.A shot of the MBR from the doorZooming in shows the MBR's window & the door to the MBR Toilet on the right.Here is a shot of the MBR from its windowAnd here is a shot from the MBR door to outside of the room Edited January 5, 2013 by clouds00007 Share this post Link to post Share on other sites
clouds00007 1 Report post Posted December 30, 2012 (edited) Here is the view of the room Next to the MBR taken from its door way. Edited January 5, 2013 by clouds00007 Share this post Link to post Share on other sites
clouds00007 1 Report post Posted December 30, 2012 (edited) Here is a view of its living room from the MBRAnd here is a view from the other side of the living taken near the main door.Close up view of the hall at MBR sideClose up view of the hall at main door side Edited January 5, 2013 by clouds00007 Share this post Link to post Share on other sites
clouds00007 1 Report post Posted December 30, 2012 (edited) From this view , we can see the door to the storeroom which obviously will be removeHere, we can see the 4th room's door, which this room will also be demolished.View of the 4th roomfrom this image, we can see the toilet door in the 4th room which we will be sealing up. Edited January 5, 2013 by clouds00007 Share this post Link to post Share on other sites
clouds00007 1 Report post Posted December 30, 2012 (edited) So now lets take a look at the Kitchen, which every thing has to go. Edited January 5, 2013 by clouds00007 Share this post Link to post Share on other sites
clouds00007 1 Report post Posted December 30, 2012 (edited) And here is the toliet viewAnd looking back at the kitchen from the toilet side Edited January 5, 2013 by clouds00007 Share this post Link to post Share on other sites
clouds00007 1 Report post Posted December 30, 2012 ok, maybe now it might still be a little difficult to visualise what we will be dealing with, so let's removed all the existing fittings, furnitures and such and take a look at the space again.But of cos before we do, let get on the basic tradition. Better be safe than sorry right Huat AhHere is the MBR views from the door with all the stuff removed.View from MBR on the window side.gonna do something to this space at MBR area. Share this post Link to post Share on other sites
clouds00007 1 Report post Posted December 30, 2012 as this is originally 2 3rm flat combine to one, it means that we have 2 kitchen area which means the pipes as well. In this case, I have these in my MBR area.And although some ppl might think, "oh 2 3rms, does that means u have 4 toliet?" and the answer is yes. but its not as big as we wanted and there is this stupid pipe smack right in the middle. and it really cramped up the entire bathroom. Share this post Link to post Share on other sites
clouds00007 1 Report post Posted December 30, 2012 So now lets proceed on to the adjourning room, which will eventually be part of the MBR. Share this post Link to post Share on other sites
clouds00007 1 Report post Posted December 30, 2012 And lets take a look at the hall area to judge its size for the planning. Share this post Link to post Share on other sites
clouds00007 1 Report post Posted December 30, 2012 the fourth room which eventually will be demolish to become part of my socialising space.And here is the extra toilet door which we will be sealing up. Share this post Link to post Share on other sites
clouds00007 1 Report post Posted December 30, 2012 The original puny storeroom which will also be teared down, relocate and rebuilt Share this post Link to post Share on other sites