HondaSteam 0 Report post Posted November 2, 2012 5) Children Bathroom Share this post Link to post Share on other sites
HondaSteam 0 Report post Posted November 2, 2012 6) Kitchen Share this post Link to post Share on other sites
split84 0 Report post Posted November 2, 2012 The condition of the house looks gd Share this post Link to post Share on other sites
split84 0 Report post Posted November 2, 2012 U mind if I ask how much is ur cov? I was looking around for an em at khatib for awhile but nv come across such unit so lucky of u Share this post Link to post Share on other sites
spikedoll 2 Report post Posted November 2, 2012 I really like your mable flooring!!! Lucky u! Save u alot money ! Share this post Link to post Share on other sites
HondaSteam 0 Report post Posted November 2, 2012 U mind if I ask how much is ur cov? I was looking around for an em at khatib for awhile but nv come across such unit so lucky of uFrankly, I think it's because the silly agent posted in property guru in such a silly way tat nobody would ever find the advisement. One reason might oso be the owner is not really eager to sell because she was looking at 70k and above. Other readers: dont be surprize khatib flats are in great demand, typically cov can range from at least 40k and above.. but the flat was designated for me, so quite lucky to get it below the owner's expectation as we expressed sincerity.. joking la Share this post Link to post Share on other sites
andrina 0 Report post Posted November 2, 2012 U got ur Hse today too? Wow we are on the same day! Monday my hacking works will start! How abt you're? Share this post Link to post Share on other sites
potatoes 0 Report post Posted November 2, 2012 Nice marble flooring.... Share this post Link to post Share on other sites
HondaSteam 0 Report post Posted November 2, 2012 (edited) U got ur Hse today too? Wow we are on the same day! Monday my hacking works will start! How abt you're?Yes, Monday.. today contractor called me this morn asked whther i got call sp to cut off gas supply as mandatory because will cause explosive.. realize the gas valve can be off easily but contractor insisted sp has to do it because anything can happen and claiming insur can be a prob since not done by the proper authority... cut story short.. today call sp, appt to cutt off gas supply is on next tue morn.. so inform contractor to hack other things 1st.. wth, such thing oso can happen.. look like need to monitor daily on the progress.. Edited November 3, 2012 by HondaSteam Share this post Link to post Share on other sites
split84 0 Report post Posted November 2, 2012 Ic so lucky I love ur marble flooring.. Yeah I know khatib flats are asking high place too bad I sold mine at not so gd price despite was renovated and well maintain.. Share this post Link to post Share on other sites
HondaSteam 0 Report post Posted November 2, 2012 (edited) Happened to recee upon this landscaping company in Kranji area. Should look nice if place at the balcony area: Edited November 3, 2012 by HondaSteam Share this post Link to post Share on other sites
HondaSteam 0 Report post Posted November 3, 2012 Adding more pictures: Share this post Link to post Share on other sites
potatoes 0 Report post Posted November 3, 2012 That's what I like about Gen 1 EMs.... It's huge balcony where I can create a gardening area Share this post Link to post Share on other sites
Sygnur 0 Report post Posted November 3, 2012 Love love those greens.... Share this post Link to post Share on other sites
HondaSteam 0 Report post Posted November 4, 2012 (edited) Went to M-Flow Plumbling Trading in Chong Pang which sells kitchen & bathroom accessories. Heard from my contractor about this shop is having closing down sales. Never thought of spending so much for my kitchen & toilet accessories, the damage was 3.8k comprising ofa) 3 set of OTTO W/C (those retailing @ 599) with sinks, excluding taps, spray guns, towel bars and hidden accessories for W/C (10 yrs warranty for W/C)b) Hobz Cooker & hood (comes with 2 yrs warranty)c) 2x Rinnai instant heater (ease of maintenance & not worrying children would play or spoil while playing water)d) 1x rain show & mixer for MBR (retain old storage heater from previous owner)e) Kitchen sink + tapNow starting to worry about other costs for aircon, furnitures (not many as most carrying over) and lightings... I estimate to total up to 40k (renov) + 10~15k = ranges from 55k to 60k Edited November 4, 2012 by HondaSteam Share this post Link to post Share on other sites