bigbull 0 Report post Posted October 11, 2012 Day 8 (11 Oct 12)Completed Brick Wall.Cementing of the Kitchen Walls. Cabinets, where are you???Shower Kerb at Common Toilet Completed. Now waiting for the Glass Shower ScreenMy MBR Toilet with Wife's Favorite Subway Tiles.Closed up Shot of the Subway Tiles with the spacers inserted. I think it will look really nice when the black gout is applied. Makes the tiles stand up. Share this post Link to post Share on other sites
bigbull 0 Report post Posted October 12, 2012 Day 9 (12 Oct 12)Sorry for the blur pictures. It was taken in the evening...The MBR Toilet is Completed!!! Notice the black gout. My wife and I think its beautiful. Close up view of the Subway Tiles. Another view of the MBR Toilet with Cement Wall. Now the vanity, cupboard, wide mirror and shower screen can come in! The drainage for the Washing Machine. Initially K asked if we wanna a base for it but we didn't think we need it. He suggested moving it all the way to the corner. We thought it is a good ideal so the washing machine drainage pipe can be hidden away. All the mason work is about to be completed. On the list tomorrow, boxing up of all the water and aircon pipes. Share this post Link to post Share on other sites
bigbull 0 Report post Posted October 13, 2012 No update on my house renovation today as I didn't have time to go up and take a look.Anyway, my wife and I went to Logan today and bought the following sideboard for TV console.Btw, this is just a picture taken from their website. I think it should go well with my house. Hopefully... We have previously bought a tv console from some place prior to the renovation but it was a big mistake. Hopefully, we can get a refund for that or perhaps get it exchange for credits and settle for something else... A price to pay for being so impatient. Also after seeing the MBR toilet with the subway tiles, my wife and I made a hard decision to sink deeper into our pockets for K to do do the same for our Common toilet. Hope we made the right decision. Share this post Link to post Share on other sites
smartgold 0 Report post Posted October 13, 2012 Hi bigbull, your house Reno looking nice and neat. Can I have your Reno contact please? Please send me alex.yk.see@gmail.com thanks so much. Share this post Link to post Share on other sites
nick34 0 Report post Posted October 13, 2012 nice mbr toilet... Share this post Link to post Share on other sites
bigbull 0 Report post Posted October 14, 2012 Hi bigbull, your house Reno looking nice and neat. Can I have your Reno contact please? Please send me alex.yk.see@gmail.com thanks so much.Hi Smartgold, thank you. I have already send K's contact to your gmail account.nice mbr toilet... Hi Nick34, thanks. We took a long time to decide. Glad it came out to be nice. Share this post Link to post Share on other sites
Sygnur 0 Report post Posted October 14, 2012 Indeed, the tiles looks better.... Such beauty... Day 9 (12 Oct 12)Sorry for the blur pictures. It was taken in the evening...The MBR Toilet is Completed!!! Notice the black gout. My wife and I think its beautiful. Close up view of the Subway Tiles. Another view of the MBR Toilet with Cement Wall. Now the vanity, cupboard, wide mirror and shower screen can come in! Share this post Link to post Share on other sites
bigbull 0 Report post Posted October 14, 2012 Day 11 (14 Oct 12)Preparation for overlaying in Common Toilet.Boxing up of Air-con Trunkings.Boxing up of Water Pipe above the SY Door and finish with Cement.Shower Kerb in MBR Toilet.Progress for next weekI was talking to K and these are the jobs that may likely happen next week.- Overlaying of Common toilet with Subway Tiles.- Running of Citygas piping.- Polishing the parquet floors in the three bedrooms.- Cleaning up of the whole house.- Painting of the house. (First Coat)- Overlaying of Living Room, Kitchen and Walkway with Veener flooring. (Might be delayed because of the last min insertion of the overlaying in common toilet.) Share this post Link to post Share on other sites
felicialsg 0 Report post Posted October 16, 2012 Hi, r u at 7th floor? 271A? Share this post Link to post Share on other sites
gohlex 0 Report post Posted October 16, 2012 Day 11 (14 Oct 12)Preparation for overlaying in Common Toilet.Boxing up of Air-con Trunkings.Boxing up of Water Pipe above the SY Door and finish with Cement.Shower Kerb in MBR Toilet.Progress for next weekI was talking to K and these are the jobs that may likely happen next week.- Overlaying of Common toilet with Subway Tiles.- Running of Citygas piping.- Polishing the parquet floors in the three bedrooms.- Cleaning up of the whole house.- Painting of the house. (First Coat)- Overlaying of Living Room, Kitchen and Walkway with Veener flooring. (Might be delayed because of the last min insertion of the overlaying in common toilet.) hi Bigbull, do you mind to PM me K's contact? May I know which firm he is from? Thanks in advance. Share this post Link to post Share on other sites
bigbull 0 Report post Posted October 16, 2012 (edited) Hi, r u at 7th floor? 271A?Hi Felicialsg,Nope. On other floors. Pm you separately. I suppose you are another PRian. Bigbull Edited October 16, 2012 by bigbull Share this post Link to post Share on other sites
bigbull 0 Report post Posted October 16, 2012 hi Bigbull, do you mind to PM me K's contact? May I know which firm he is from? Thanks in advance.Hi Gohlex,PMed!Bigbull Share this post Link to post Share on other sites
smartgold 0 Report post Posted October 16, 2012 Hi Bigbull, do you mind sharing your quote with me? I want to check my budget to see what I can achieve with it. Your new place is a 4 or 5 rm flat? Email me alex.yk.see@gmail.com Thanks in advance Share this post Link to post Share on other sites
bigbull 0 Report post Posted October 17, 2012 Day 13 (16 Oct 12)Today the Citygas came and installed the gas pipings for my Stove, Heater and Dryer.The Citygas contractor was very nice to accomodate my request to try to make the pipings to be as neat as possible. We ran into some problem because the builders did not cater a hole for the gas pipe to run through to the SY. They drilled a hole for me and solve the problem straightaway. It will be less visible when the SY windows are up. Kudos to them! The heater and dryer connection.Later in the afternoon, K managed to hijack the Carpenter to our place! The following is a sneek preview of what the carpentry may be like. Behold, the carpenter's graffiti on the wall:The Shoe CabinetThe KitchenThe WIWHope to see the real thing soon... Share this post Link to post Share on other sites
bigbull 0 Report post Posted October 17, 2012 Day 14 (17 Oct 12)My wife and I went up to our place to take a look at the sample veneer flooring that K left for us and we were surprised to see a worker still working !!The Common Toilet with Subway Tiles. The worker will be coming back up tomorrow to finish up the toilet and hopefully after that, a lot of the other works can begin. Just thought I mention something about K's work. He was talking to me about re-doing the cement creed wall at the MBR toilet and I was confused, thinking if something has happened. He told me the texture wasn't right and I went to compare it with the kitchen cement creed wall and realised that it is really not as nice. Kudos to K for his quality of work !! Share this post Link to post Share on other sites