RemyLebeau 0 Report post Posted December 2, 2012 Thks. Yes the more rush u have the more errors and prcier. As I just need basic renovation, no design in place just my ideas here and there. Probably u need to move in soon,I guess a 3 room flat need 3 to 4 weeks at least for complete reno. U have to be ard to make sure they do what u expect or u can trust the ID. No experience with rainshower as I didnt use it and not installing. Your stuffs bought is place inside the new house? Not sure this will obstruct the works.Thats right i'm in a rush to move in as i'm staying at a rented place. Before i sign the dotted line i ask 2 ID's and both are willing to take the job and both gave the same answer that it will be the kitchen last to complete. I fully understand as the time frame is short. As of now he's left with 20 more days before i can move in temporary. Most of the bathroom stuff will be sent on 7 Dec and lighting will be on the 10th dec. Crossing my fingers that all will go well this week. Share this post Link to post Share on other sites
limbj 0 Report post Posted December 4, 2012 Thats right i'm in a rush to move in as i'm staying at a rented place. Before i sign the dotted line i ask 2 ID's and both are willing to take the job and both gave the same answer that it will be the kitchen last to complete. I fully understand as the time frame is short. As of now he's left with 20 more days before i can move in temporary. Most of the bathroom stuff will be sent on 7 Dec and lighting will be on the 10th dec. Crossing my fingers that all will go well this week.My work slowed down no difference since last Saturday. Only 1 tiling worker i/o 2 probably they have multiple jobs at a time. He said can complete 2 weeks to 3 weeks now I doubt so. Good luck my friend, wheres your new flat at, later I check your blog. Share this post Link to post Share on other sites
RemyLebeau 0 Report post Posted December 4, 2012 My work slowed down no difference since last Saturday. Only 1 tiling worker i/o 2 probably they have multiple jobs at a time. He said can complete 2 weeks to 3 weeks now I doubt so. Good luck my friend, wheres your new flat at, later I check your blog.Ic, All the best to you and everyone undergoing reno now. Gonna pop by again to see what had been done later. Mine is at Hougang. Share this post Link to post Share on other sites
limbj 0 Report post Posted December 7, 2012 (edited) After 1 week+, kitchen wall tiles are in progress Edited December 7, 2012 by limbj Share this post Link to post Share on other sites