Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
limbj

First Resale Home@bedok Reservoir Road

Recommended Posts

Anyone knows how to remove such stains?

pa010363.jpg

1st appointment for purchase of flat : 1 Oct 2012 --> Completed

2nd appointmemt for purchase of flat: TBC

Shortlisting Quotation from contractors in progress :

Edited by limbj
 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

We got to know what kind of stain is that? Maybe you can ask the contractor to do a acid wash after your Reno?

 

Share this post


Link to post
Share on other sites

Thanks all, current 4 room flat is not well maintained due to renting out to 3 tenants. Saw your blog posting,congrats to your childhood dream coming true:p

My initial plan is to redo the 2 toilets completely+kitchen cabinet and tilings, minor electrical works, acid wash, repainting etc. Idea is to budget and reuse existing fixtures as possible.

I guess a budget cost between 10k to 15k should be reasonable. Thanks for some comments. Yes I will get a few contractors to estimate the quote soon. No need an ID I suppose as I do not need a personal customisation.

Just a common simple design.

 

Share this post


Link to post
Share on other sites

Hi,

are u the one email me on my blog? I'm glad that it provides information to you.

Regarding the stain in your pic, I doubt it can be cleaned as it seemed some sort of chemical stain which damaged the tiles e.g. bleach. U can either change it or put a carpet to cover it.

 

Share this post


Link to post
Share on other sites

Hi,

are u the one email me on my blog? I'm glad that it provides information to you.

Regarding the stain in your pic, I doubt it can be cleaned as it seemed some sort of chemical stain which damaged the tiles e.g. bleach. U can either change it or put a carpet to cover it.

Yes, thanks alot for your information :->

 

Share this post


Link to post
Share on other sites

Thks to all, seems this stain is like cheimical seep out of the tiles from a few contractors comments too. One said can easily hacked it and replace part like design for the balcony area since its nearer the door.

Anyone knows that kitchen nowadays not using wall tiles as many condos designed this way?

 

Share this post


Link to post
Share on other sites

I have viewed several homogenous and ceramic tiles. Anyone has used them before, thks for any comments

pb192107.jpg

pb192098.jpg

Edited by limbj
 

Share this post


Link to post
Share on other sites

After 1 day of hacking, I went second day like most of debris has been cleared, waiting for cementing.

Kitchen/Balcony Hacked

pb282215.jpg

Kitchen Toilet Hacked

pb282221.jpg

Master Bathroom Hacked

pb282234.jpg

Edited by limbj
 

Share this post


Link to post
Share on other sites

After 1 day of hacking, I went second day like most of debris has been cleared, waiting for cementing.

Kitchen/Balcony Hacked

pb282215.jpg

Kitchen Toilet Hacked

pb282221.jpg

Master Bathroom Hacked

pb282234.jpg

After 5 days both toilets have wall tiles up and in progress

pc012268.jpgpc012308.jpg

 

Share this post


Link to post
Share on other sites

wow thats kinda fast, my progress seems slow. Anyway did you check during weekends if they got do any small work?

Hi Remy,

Thks for visiting. I learn alot from Renotalk. I engage a contractor and he has his own friends do hacking and his own Msian tilers and granite stove. First day the hacking is done, followed by cementing etc. Yes hes fast say ard 2 to 3 weeks to complete.

He follows HDB rule, Sunday off to avoid neighbours complaining noise although no hacking. Saturday is full day working:p Have u bought your toliet and kitchen wares etc

I just saw your blog, u are hacking the whole house of course slower as I only kitchen and 2 bathrooms. For yours your workers do the floor bases first as mine is starting the wall first. Also no electrical rewiring for me.

Edited by limbj
 

Share this post


Link to post
Share on other sites

Hi Remy,

Thks for visiting. I learn alot from Renotalk. I engage a contractor and he has his own friends do hacking and his own Msian tilers and granite stove. First day the hacking is done, followed by cementing etc. Yes hes fast say ard 2 to 3 weeks to complete.

He follows HDB rule, Sunday off to avoid neighbours complaining noise although no hacking. Saturday is full day working:p Have u bought your toliet and kitchen wares etc

I just saw your blog, u are hacking the whole house of course slower as I only kitchen and 2 bathrooms. For yours your workers do the floor bases first as mine is starting the wall first. Also no electrical rewiring for me.

IC, wow lucky you sir. I've yet to check the works for yesterday plus not sure if there's any minor works done yesterday. Furthermore my time frame is kinda short also. Hopefully everything will be done up asap. Its total overhaul for everything. Bought most of my stuff already but there's some errors. Probably i bought in a rush. Not sure if the rain shower will affect the height due to the pipings in my common room toilet. As for lightings i might get the wrong designs as well cos ID only bring me to 1 lighting shop. Didn't bring me to balestier see see look look.

 

Share this post


Link to post
Share on other sites

IC, wow lucky you sir. I've yet to check the works for yesterday plus not sure if there's any minor works done yesterday. Furthermore my time frame is kinda short also. Hopefully everything will be done up asap. Its total overhaul for everything. Bought most of my stuff already but there's some errors. Probably i bought in a rush. Not sure if the rain shower will affect the height due to the pipings in my common room toilet. As for lightings i might get the wrong designs as well cos ID only bring me to 1 lighting shop. Didn't bring me to balestier see see look look.

Thks. Yes the more rush u have the more errors and prcier. As I just need basic renovation, no design in place just my ideas here and there. Probably u need to move in soon,I guess a 3 room flat need 3 to 4 weeks at least for complete reno. U have to be ard to make sure they do what u expect or u can trust the ID. No experience with rainshower as I didnt use it and not installing. Your stuffs bought is place inside the new house? Not sure this will obstruct the works.

So far hope u satisfied with our ID. I do not know about lightings at first but after read Renotalk and walk along Jalan Besar, I know there are shops like Lightings.com etc. Also - sell those ceiliing energy saving lights those rectangular squarish one like each ard 36W very bright than those round types 22,32,40W.

Edited by limbj
 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×