After searching high and low for a flat that is suited to our fs needs, finally we found a unit that fits what we are looking for :yamseng: :yamseng:

The OTP is in July and we had already completed our first appointment and we had the keys to start our reno :sport-smiley-018:

Reno had started yesterday with all the hackings done but yet to go up and check the latest status of it.

Decided to build a store room in between the 2 common bedrooms - Permit still pending for approval.

Also wanted to hack the wall at the kitchen entrance and was not approved :bangwall: Now i am at a loss of idea of what to do to it.

4SCORRIDORa_zpse79557c5.jpg

I had seen other 4S units whereby the kitchen wall can be hacked :dribble:

Option 1:

Shift the dining to the living and have a big kitchen.

Option 2:

Do a dry and wet kitchen kinda layout.

Our Works:

Hacking all floor and wall tiles for living, kitchen & toilets.

Dismantle & dispose off all cabinets, wardrobes, basin....

Hack wall and door area between 2 common rooms.

Supply labor & material to build new store c/w 1nos door and door frame.

Supply & lay homogeneous flooring for living & dining.

Supply & lay laminate flooring for 3 bedrooms.

Supply & lay heavy duty homogenous flooring for kitchen.

Supply & lay non slip homogenous flooring for both bathrooms.

Supply & lay homogenous wall tiles for kitchen.

Supply & lay full height wall tiles for both bathrooms.

Application of water proofing membrane for kitchen and both bathroom.

Supply labor & materials to change exposed copper piping for both bathrooms.

Supply labor & materials to run washing machine & sink inlet/outlet pipe.

Supply labor to install 2 set pedestal pans & wash basins.

Supply labor to install 2 set instant heater.

Supply and install white powdered coated aluminum bi-fold door for both bathrooms.

Construct 30ft Top and bottom kitchen cabinets w soft closing.

Supply and install 13ft solid surface table top.

Supply and install L box **** area.

Supply and install false ceiling at dining and passageway to bedrooms.

Construct 2ft praying alter.

Haulage & debris.

Floor protection.

General acid washing for whole house wall and floor.

To supply and install PD door for kitchen entrance.

Construct 50mm washing machine base.

Construct 50mm kitchen cabinet base.

Construct 50mm fridge base.

Supply & install 1 nos new stainless steel rubbish chute.

Supply & install 1nos tempered glass shower screen for MBR toilet.

Electrical wiring for whole house.

Edited by comfyhome
 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

Went to Hafary to choose tiles last week. We chose 2 diff white tiles (pop up dots and wave like) for the common toilet so as to make it look bigger as its really teeny weeny in size. The feature wall in the MBR toilet was chosen by hubby and its not really my taste of it :bleah: Kitchen tiles will be white and brown as per our fsm so as the cabinet and solid surface. As for toilet floor tiles, we would like to have those with rough feel so that it wont be slippery like our current flat (stupid ID chose a wall tile as floor tile).

B610k_zps5f557457.jpg

 

Share this post


Link to post
Share on other sites

Thanks Yunyun :D The condition not very bad but the floor very sticky and previous owner dun seem to maintain it, they even wear shoes into their house.. :bow:

Edited by comfyhome
 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×