Jgal 0 Report post Posted September 7, 2012 Let's the Hacking began - Thanks to my ID who is there almost everyday to ensure that the right wall is hacked and report every details. Share this post Link to post Share on other sites
casa 0 Report post Posted September 7, 2012 Post more pics to share Share this post Link to post Share on other sites
Jgal 0 Report post Posted September 7, 2012 Some 3d pic of the new place hmm.. i think the actual shld looks better, but at least we have an idea. Ha ha ha Master Bathroom Junior Bathroom Living Room - missing window!! actual shld look bright Ex-storerm cabinet - the storerm is "flatten" to a cabinet depth.Kitchen cabinets - i like the flooring.. hope it turns out as well. Share this post Link to post Share on other sites
Jgal 0 Report post Posted September 7, 2012 Photos that I received 2 days ago ...Ex-stormrm .. with the newly located powerbox Here's the junior bathrm Great id remember to create space for me to put my shampoo etc... Save $$ and frustration from fixing shelves for the bath area. Share this post Link to post Share on other sites
El LoCo 3 Report post Posted September 7, 2012 The raw brick walls are very nice...would love to keep them intact... Share this post Link to post Share on other sites
Jgal 0 Report post Posted September 9, 2012 Setting the tone.Been reading quite a lot of t-blog these few days, most people have the similar color scheme.Wood floor , either in parquet or wood-like tiles seem to be in every new new home. 2-toned toilet walls , if not mosaic borders is the 'in' look now. Carpentry is mainly wood pattern. Not sure if I had chosen the right tone for my new house. Will it be the same as others or will it stand out as its own. *let's see* Share this post Link to post Share on other sites
Jgal 0 Report post Posted September 9, 2012 Another job well done. Checked the aircon piping yesterday. As promised, even the drainage pipes to the toilet are insulated to ensure that there would be leaking. Share this post Link to post Share on other sites
Jgal 0 Report post Posted September 9, 2012 Design as we renovateDuring our previous renovation, we had a standard new flat and working with a id that completed at least 6 similar flat in the same estate. Designs was confirmed way before renovation started, we were able to visualize the space and lights ensuring it's does not look over-done. This time round, we had a old unit. BCA floorplan is only as helpful as identify where is beam, but cant tell how "big" it's going to be. With hacking and constructing of walls, we could only design as we renovate. Share this post Link to post Share on other sites
momiji 0 Report post Posted September 9, 2012 May I know which supplier do you get the wood tiles from? Any model/name? price range? Thanks. Share this post Link to post Share on other sites
Jgal 0 Report post Posted September 10, 2012 SGD3 psf china tiles from hafary.ID said he'll absorb the extra charge by the tiler for tiling because it is 30x60. Not sure how it will turn out. After they tile will let post the pic. Share this post Link to post Share on other sites
Jgal 0 Report post Posted September 11, 2012 (edited) neighbour Next door neighbour complaint to my Id that her place is leaking because of our hacking... Does this spell trouble days ahead. ... :/ Edited September 11, 2012 by Jgal Share this post Link to post Share on other sites
Jgal 0 Report post Posted September 18, 2012 Yuppie... Just come back from site visit. Everything on schedule and its completing faster than what I expected.Pending job now1) False ceiling & partition - complete by tmr (ID say : 1 day job only) 2) Carpentry ( Carpenter coming down to measure tmr)3) Lights / Electricity - all points confirmed today. 4) Alumix wardrode 5) Install glass 6) Toiletry installationShld end by 27 Sept ! Excellent work. Share this post Link to post Share on other sites
Jgal 0 Report post Posted September 25, 2012 Very happy with what i saw today. the ceiling and partition work are excellent. And i was pleasantly surprise by the tiling too. Here's some pic to share.Excellent flooring / the living room tiles gaps are small. Workmanship for the kitchen tiles is great too. And these are china tiles.. Excellent ceiling work & painting work / Painters said they spent alot of time scrapping off the old paint. And when i was there, the put plastic sheet to protect the tiles from getting strains. Share this post Link to post Share on other sites
Jgal 0 Report post Posted September 25, 2012 1) False ceiling & partition - complete by tmr (ID say : 1 day job only) 2) Carpentry - installation on thursday3) Lights / Electricity - installation on tmr4) Alumix wardrode - installation on Sat5) Install glass -installation on Mon 6) Toiletry installation - installation on tmr7) Praquet vanishing - Friday8) Last round of painting - Tuesday9) aircon installation - Monday Project was delayed a bit (4 Oct ) because we made some changes to partition and kitchen. But i am not complaining .. ha ha ha to complete these jobs in a short 6 wks.. is quite a feat :yamseng: Share this post Link to post Share on other sites