Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
Jgal

Jpad

Recommended Posts

Let's the Hacking began - Thanks to my ID who is there almost everyday to ensure that the right wall is hacked and report every details. :)

7948601946_47bb6ca6f9.jpg

7948602052_0afe37e22e.jpg

7948602368_0fda585c5d.jpg

7948603358_23bfaa12c7.jpg

7948603108_d0590218a8.jpg

 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

Some 3d pic of the new place :)

hmm.. i think the actual shld looks better, but at least we have an idea. Ha ha ha

Master Bathroom

7949180490_24a45ef701.jpg

Junior Bathroom

7949179876_5e8caf9809.jpg

Living Room - missing window!! actual shld look bright

7949179324_6df29ece15.jpg

Ex-storerm cabinet - the storerm is "flatten" to a cabinet depth.

7949173628_cdfd97787a.jpg

Kitchen cabinets - i like the flooring.. hope it turns out as well.

7949173238_69b413ee34.jpg

 

Share this post


Link to post
Share on other sites

Photos that I received 2 days ago ...

Ex-stormrm .. with the newly located powerbox :)

7949167278_d67c776150.jpg

Here's the junior bathrm

Great :) id remember to create space for me to put my shampoo etc...

Save $$ and frustration from fixing shelves for the bath area.

7949167656_316da7cdc6.jpg

 

Share this post


Link to post
Share on other sites

Setting the tone.

Been reading quite a lot of t-blog these few days, most people have the similar color scheme.

Wood floor , either in parquet or wood-like tiles seem to be in every new new home. 2-toned toilet walls , if not mosaic borders is the 'in' look now. Carpentry is mainly wood pattern.

Not sure if I had chosen the right tone for my new house. Will it be the same as others or will it stand out as its own. *let's see*

 

Share this post


Link to post
Share on other sites

Another job well done. :)

Checked the aircon piping yesterday. As promised, even the drainage pipes to the toilet are insulated to ensure that there would be leaking.

7954005330_1a7076c708.jpg

7954010024_54b0ec6a1f.jpg

 

Share this post


Link to post
Share on other sites

Design as we renovate

During our previous renovation, we had a standard new flat and working with a id that completed at least 6 similar flat in the same estate. Designs was confirmed way before renovation started, we were able to visualize the space and lights ensuring it's does not look over-done.

This time round, we had a old unit. BCA floorplan is only as helpful as identify where is beam, but cant tell how "big" it's going to be. With hacking and constructing of walls, we could only design as we renovate.

 

Share this post


Link to post
Share on other sites

SGD3 psf china tiles from hafary.

ID said he'll absorb the extra charge by the tiler for tiling because it is 30x60. Not sure how it will turn out. After they tile will let post the pic.

 

Share this post


Link to post
Share on other sites

neighbour

Next door neighbour complaint to my Id that her place is leaking because of our hacking... Does this spell trouble days ahead. ... :/

Edited by Jgal
 

Share this post


Link to post
Share on other sites

Yuppie... Just come back from site visit. :)

Everything on schedule and its completing faster than what I expected.

Pending job now

1) False ceiling & partition - complete by tmr (ID say : 1 day job only)

2) Carpentry ( Carpenter coming down to measure tmr)

3) Lights / Electricity - all points confirmed today. :)

4) Alumix wardrode

5) Install glass

6) Toiletry installation

Shld end by 27 Sept ! Excellent work.

 

Share this post


Link to post
Share on other sites

Very happy with what i saw today. :)

the ceiling and partition work are excellent. And i was pleasantly surprise by the tiling too.

Here's some pic to share.

Excellent flooring / the living room tiles gaps are small. Workmanship for the kitchen tiles is great too. And these are china tiles.. :bow:

8023070247_61b37e8612.jpg

Excellent ceiling work & painting work / Painters said they spent alot of time scrapping off the old paint. :good: And when i was there, the put plastic sheet to protect the tiles from getting strains.

8023065826_3d61452dd5.jpg

8023065746_5f8a2fd0cf.jpg

 

Share this post


Link to post
Share on other sites

1) False ceiling & partition - complete by tmr (ID say : 1 day job only)

2) Carpentry - installation on thursday

3) Lights / Electricity - installation on tmr

4) Alumix wardrode - installation on Sat

5) Install glass -installation on Mon

6) Toiletry installation - installation on tmr

7) Praquet vanishing - Friday

8) Last round of painting - Tuesday

9) aircon installation - Monday

Project was delayed a bit (4 Oct ) because we made some changes to partition and kitchen. But i am not complaining .. ha ha ha to complete these jobs in a short 6 wks.. is quite a feat :yamseng: :yamseng:

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×