Norida 0 Report post Posted August 30, 2013 Hi Kenny, can you pls share ur ID with me pls? Their contact name and no. if u dun mind.my email id is hidayaisa@gmail.comWe looking for reno cpntractors for our 4 rm resale hdb soon.thanks in advance! Share this post Link to post Share on other sites
Devilaz 0 Report post Posted September 3, 2013 Sorry i seems to miss this post. Have u engage him already? Share this post Link to post Share on other sites
yapfamily 0 Report post Posted October 25, 2013 Hi Kenny,Do you mind sharing with me your ID's contact too? eveleeht@gmail.comTIA! Share this post Link to post Share on other sites
Miichele 1 Report post Posted October 29, 2013 Please PM me your contrator ID too.. Share this post Link to post Share on other sites
HomeDaze 0 Report post Posted October 31, 2013 KennyNG mind sharing with me your contractor details Share this post Link to post Share on other sites
luvhenny 9 Report post Posted November 1, 2013 Hi KennyNG Do you mind PM me your ID number. My email is solewholesaler@gmail.com Share this post Link to post Share on other sites
Devin 2 Report post Posted November 10, 2013 Hi kenny!Possible to share your contact? Share this post Link to post Share on other sites
pastrygirl 0 Report post Posted November 12, 2013 Hi all, getting my key for my house in 2weeks time for renovating.Can help me check the price is it ok so I can sign with the ID? My friend told me to price check here .Foyer, Living hall , passageway and 3 bedroomsSupply and lay 60 x 60 cm designer floor tiles for Foyer , Living hall , passageway and ($4800)3 bedrooms c/w skirting( Tiles @ $3 per sqf range )3. Professional engineer (Fee) ($200)Construct Works1. To construct shower kerbing at Master toilet c/w tiles. ($150)2. To construct cabinet base c/w tiling & cement screed at Kitchen (both Side) . ($320) Tempered Glass Works1. To supply & install Sliding Clear Tempered glass at Master bathroom 10mm. ($580)2. To supply & install 2 fixed (clear) Tempered glass at Kitchen entrance. (10mm). ($780)3. To supply & install 1 sliding (clear) Tempered glass at Ktchen entrance. (10mm). ($420)Ceiling Works1. To supply & construct design L-Box light holder cw false ceiling Living & Dining Hall. ($1000)2. To supply & construct false ceiling at passage way. ($300)3. To supply & construct design L-Box light holder c/w false ceiling at Master bedroom. ($580) 4. To supply & construct L-Box for curtain Master room window. ($150)5. To supply & construct L-Box for bedroom 2 ($350)6. To supply & construct L-Box for bedroom 3 ($350)Carpentry Works - Kitchen1. To supply & fabricate 10ft Bottom Kitchen cabinet selected laminated finish& ABS door trimming c/w ANTI-Slam door c/w internal colour PVC. ($1250)2. To supply & fabricate 10ft Top Kitchen cabinet selected laminated finish& ABS door trimming c/w ANTI-Slam door c/w internal colour PVC. ($1250)Master bedroom1. To supply & fabricate full height 8ft alum sliding c/w glass or w/o glass doorwardrobe selected laminate finish ABS trimming internal colour PVC . ($2080)2. To supply & fabricate 5ft feature wall c/w TV console ($1250)selected laminate finish ABS door trimming.4. To supply & fabricate 2.5ft Vanity internal colour PVC at MBR ( $450 )Living & Dining Hall2. To supply & fabricate 10ft feature wall c/w TV console ($2500)selected laminate finish ABS door trimming.Solid Surface Works1. Supply and install 10ft granite top (Black Galaxy ) ($1350)2. Supply and install 2.5ft solid surface at MBR ($200)Painting Works 1. To paint whole house wall & ceiling w/ ICI or NIPPON original. ($1450)Master room, Bedroom 2 & Bedroom 3.Kitchen & 2 toilet ceiling.Metal door frameWhole house painting - Max 5 colour.Plumbling workSupply and install new in/out-let pipe for kitchen sink ($150)Supply and install new in/out-let pipe for washing machine ($150)Supply labour to install 1nos new wash basin and taps ($100)Supply labour to install 2nos instant heater / 1nos of Tank heater ($150)Supply labour to install 2 set of acessory ($160)additional of hot point will be charge ($100 per Point )OthersAcid wash for whole unit ($250)Total $24300Payment Terms and Conditions1 10% Down payment is payable upon confirmation of Contract Order.2 40% of payment should be paid upon commencing of works.3 40% Progressive payment upon measurement of carpentry works.4 10% Balance payment upon completion of major renovation works.5 No cancellation when Contract/Tax Invoice is sign or 20% compensation will be chargedaccording to contract value.6 All payment must be made payable to "Company"7 An official receipt must be obtain when payment is made.8 No payment will be considered valid except our Company's official receipt.9 We reserves the right to stop work if progressive payment is not received.10 Warranty period 01 year after completion.11 Alteration or additional of items not listed in the above mentioned will be charge accordingly.Hi can PM me @ lindasim23@hotmail.com your ID too? Share this post Link to post Share on other sites
ecinreb 0 Report post Posted November 16, 2013 Hi Kenny, can PM me your contractor/ID contacts? Share this post Link to post Share on other sites
renoshy 1 Report post Posted November 19, 2013 Hi KennyNG, can PM me @ tracypang66@yahoo.com your ID too? Thk u. Share this post Link to post Share on other sites
luvhenny 9 Report post Posted November 19, 2013 Hi KennyNG, can PM me @ tracypang66@yahoo.com your ID too? Thk u.Just realise KennyNG do not online since 1 year ago... anyone had his ID can share? Share this post Link to post Share on other sites
sushitoki 0 Report post Posted November 22, 2013 hi can pm me your id contact>? Share this post Link to post Share on other sites