Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
hoaili

Our 142Sqm Ea @ Sk

Recommended Posts

Carpentry are all here ! Saw the truck parked at the loading bay since 8.45am. The driver told me he start driving from JB at 7am !

When the carpenters arrived, they unload the stuff and brought up to 15 floor, the process took them 2 hours.

Now the house is like a battlefield, carpentry everywhere !

20121010111306.jpgUploaded with ImageShack.us

20121010111312.jpgUploaded with ImageShack.us

20121010111319.jpgUploaded with ImageShack.us

20121010131317.jpgUploaded with ImageShack.us

20121010131327.jpgUploaded with ImageShack.us

 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request

Kudos to the carpenters who carried the doors that covers the bomb shelter and walkway to bedrooms in 2 trips consecutively from level 1 to level 15 :bow: :bow:

Wooden door for walkway

20121010133131.jpgUploaded with ImageShack.us

Wooden door for bomb shelter

20121010133150.jpgUploaded with ImageShack.us

Kitchen is the first area to be fixed !

20121010143228.jpgUploaded with ImageShack.us

The painter is preparing the wall at bomb shelter area for my ID to create "special effect" personally. Can't wait to see the end result :dribble:

20121010152258.jpgUploaded with ImageShack.us

 

Share this post


Link to post
Share on other sites

11 Oct 2012 to 12 Oct 2012 - Updates on Carpentry Work

Prince's room completed

Left side of the room

20121015130935.jpgUploaded with ImageShack.us

Reccess area at the right side of the room

20121015130838.jpgUploaded with ImageShack.us

Princess' room completed - Big big wardrobe with full height mirror for a 11 year-old girl !

20121012122759.jpgUploaded with ImageShack.us

Study table and shelving (picture taken from the reflection of the mirror)

20121012163506.jpgUploaded with ImageShack.us

TV console and feature wall - love the wood grain, so natural !

20121015131820.jpgUploaded with ImageShack.us

 

Share this post


Link to post
Share on other sites

Divider at Foyer (view from main entrance)

20121012121219.jpgUploaded with ImageShack.us

View from Living Room

20121012121233.jpgUploaded with ImageShack.us

L-shape shoe cabinets - long and big !

20121015120031.jpgUploaded with ImageShack.us

20121015132129.jpgUploaded with ImageShack.us

Divider between Living and Dining area, behind this divider will be full height mirror (pending installation)

20121015115954.jpgUploaded with ImageShack.us

Edited by hoaili
 

Share this post


Link to post
Share on other sites

Kitchen - left with solid top

20121012122852.jpgUploaded with ImageShack.us

20121012163349.jpgUploaded with ImageShack.us

Contractor forgot to built a layer beneath the varnity counter. Last minute job :dunno:

20121012114230.jpgUploaded with ImageShack.us

Remembered I mentioned my ID will create "special effect" personally for the wall at household shelter ? Here it is ! :paint:

Boxing up the ugly door in progress.

20121015124609.jpgUploaded with ImageShack.us

 

Share this post


Link to post
Share on other sites

Today - 15 Oct 2012

Wrought Iron Gate installation by Ho Ho Engineering & Renovation Works

Comment - Fast and efficient

Workmenship - Very Good :good:

Engaged Ho Ho Engineering when visited Expo in August. Came back and checked the forum, learnt that lots of negative reviews about this company. Was so worried about their workmenship back then. Today, saw the way they work, very "fast hand fast leg" - the whole process only took them 20 minutes to complete :bow:

Initially thought the gate will not be steady and secure, surprisingly, it is not ! :thumbs up:

20121015122716.jpgUploaded with ImageShack.us

20121015122754.jpgUploaded with ImageShack.us

20121015122944.jpgUploaded with ImageShack.us

20121015124304.jpgUploaded with ImageShack.us

 

Share this post


Link to post
Share on other sites

Your very clear and big images are a rare find in this forum.

Did not see any ventilation for your shoe cabinets? or it is not shown in photo?

Hi matrix0405,

Thanks for visiting !

Your are right, no ventilation holes seen as normal shoe cabinet. The ventilation is thru upper and lower level from the casement door itself. There is a gap between the door and cabinet.

 

Share this post


Link to post
Share on other sites

Feature wall covering bomb shelter half way done

20121016101145.jpgUploaded with ImageShack.us

20121016101814.jpgUploaded with ImageShack.us

Can you see how bad the wall alignment was done when HDB built the block ! Everywhere is uneven, too bad no budget for plastering else sure will make all the walls nice nice ! :bangwall:

20121016103001.jpgUploaded with ImageShack.us

Carpenter is singing. This showed how happy he is, hahaha ! ;)

20121016110502.jpgUploaded with ImageShack.us

Back view of the door

20121016163739.jpgUploaded with ImageShack.us

 

Share this post


Link to post
Share on other sites

The carpenters are installing the solid wooden door at the passage way to bedrooms. This is a 70kg full height solid wooden door, which can't go into the lift. Need 4 persons to carry it all the way from ground floor to 15th floor :bow:

20121016105810.jpgUploaded with ImageShack.us

20121016101317.jpgUploaded with ImageShack.us

17 Oct 2012

My full height display cabinet which covering the ugly bomb shelter completed !

20121017115022.jpgUploaded with ImageShack.us

20121017115013.jpgUploaded with ImageShack.us

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×