hoaili 3 Report post Posted October 10, 2012 Carpentry are all here ! Saw the truck parked at the loading bay since 8.45am. The driver told me he start driving from JB at 7am !When the carpenters arrived, they unload the stuff and brought up to 15 floor, the process took them 2 hours.Now the house is like a battlefield, carpentry everywhere !Uploaded with ImageShack.usUploaded with ImageShack.usUploaded with ImageShack.usUploaded with ImageShack.usUploaded with ImageShack.us Share this post Link to post Share on other sites
hoaili 3 Report post Posted October 10, 2012 Kudos to the carpenters who carried the doors that covers the bomb shelter and walkway to bedrooms in 2 trips consecutively from level 1 to level 15 :bow: Wooden door for walkwayUploaded with ImageShack.usWooden door for bomb shelterUploaded with ImageShack.usKitchen is the first area to be fixed !Uploaded with ImageShack.usThe painter is preparing the wall at bomb shelter area for my ID to create "special effect" personally. Can't wait to see the end result Uploaded with ImageShack.us Share this post Link to post Share on other sites
casa 0 Report post Posted October 10, 2012 Looking niceI love your vanity top looks greatpost more pics to share Share this post Link to post Share on other sites
hoaili 3 Report post Posted October 10, 2012 Looking niceI love your vanity top looks greatpost more pics to share Thanks bro Casa !More pics coming up ! Share this post Link to post Share on other sites
hoaili 3 Report post Posted October 15, 2012 11 Oct 2012 to 12 Oct 2012 - Updates on Carpentry WorkPrince's room completedLeft side of the roomUploaded with ImageShack.usReccess area at the right side of the roomUploaded with ImageShack.usPrincess' room completed - Big big wardrobe with full height mirror for a 11 year-old girl !Uploaded with ImageShack.usStudy table and shelving (picture taken from the reflection of the mirror)Uploaded with ImageShack.usTV console and feature wall - love the wood grain, so natural !Uploaded with ImageShack.us Share this post Link to post Share on other sites
hoaili 3 Report post Posted October 15, 2012 (edited) Divider at Foyer (view from main entrance)Uploaded with ImageShack.usView from Living RoomUploaded with ImageShack.usL-shape shoe cabinets - long and big !Uploaded with ImageShack.usUploaded with ImageShack.usDivider between Living and Dining area, behind this divider will be full height mirror (pending installation)Uploaded with ImageShack.us Edited October 15, 2012 by hoaili Share this post Link to post Share on other sites
hoaili 3 Report post Posted October 15, 2012 Master Bedroom - Mini Walk-in Wardrobe in progressLeft sideUploaded with ImageShack.usRight sideUploaded with ImageShack.usIn between - Mirror door to my mini toiletUploaded with ImageShack.usWith door openedUploaded with ImageShack.usWith door closedUploaded with ImageShack.us Share this post Link to post Share on other sites
hoaili 3 Report post Posted October 15, 2012 Kitchen - left with solid topUploaded with ImageShack.usUploaded with ImageShack.usContractor forgot to built a layer beneath the varnity counter. Last minute job Uploaded with ImageShack.usRemembered I mentioned my ID will create "special effect" personally for the wall at household shelter ? Here it is ! Boxing up the ugly door in progress.Uploaded with ImageShack.us Share this post Link to post Share on other sites
hoaili 3 Report post Posted October 15, 2012 Today - 15 Oct 2012Wrought Iron Gate installation by Ho Ho Engineering & Renovation WorksComment - Fast and efficientWorkmenship - Very Good Engaged Ho Ho Engineering when visited Expo in August. Came back and checked the forum, learnt that lots of negative reviews about this company. Was so worried about their workmenship back then. Today, saw the way they work, very "fast hand fast leg" - the whole process only took them 20 minutes to complete Initially thought the gate will not be steady and secure, surprisingly, it is not ! Uploaded with ImageShack.usUploaded with ImageShack.usUploaded with ImageShack.usUploaded with ImageShack.us Share this post Link to post Share on other sites
hoaili 3 Report post Posted October 15, 2012 Went to Harvey Norman Suntec yesterday to change the fridge model from thisUploaded with ImageShack.usto this new model (top up only $100) Uploaded with ImageShack.us Share this post Link to post Share on other sites
matrix0405 0 Report post Posted October 15, 2012 Your very clear and big images are a rare find in this forum. Did not see any ventilation for your shoe cabinets? or it is not shown in photo? Share this post Link to post Share on other sites
hoaili 3 Report post Posted October 15, 2012 Your very clear and big images are a rare find in this forum. Did not see any ventilation for your shoe cabinets? or it is not shown in photo?Hi matrix0405,Thanks for visiting !Your are right, no ventilation holes seen as normal shoe cabinet. The ventilation is thru upper and lower level from the casement door itself. There is a gap between the door and cabinet. Share this post Link to post Share on other sites
hoaili 3 Report post Posted October 21, 2012 Busy busy busy ! Was so freaking busy for the past few days Here's the updates for the past few days16 Oct 2012Bedroom doors are up ! Besides the windows and grilles, also get the bedroom doors from Alex. Uploaded with ImageShack.usUploaded with ImageShack.usUploaded with ImageShack.usUploaded with ImageShack.us Share this post Link to post Share on other sites
hoaili 3 Report post Posted October 21, 2012 Feature wall covering bomb shelter half way doneUploaded with ImageShack.usUploaded with ImageShack.usCan you see how bad the wall alignment was done when HDB built the block ! Everywhere is uneven, too bad no budget for plastering else sure will make all the walls nice nice ! Uploaded with ImageShack.usCarpenter is singing. This showed how happy he is, hahaha ! Uploaded with ImageShack.usBack view of the door Uploaded with ImageShack.us Share this post Link to post Share on other sites
hoaili 3 Report post Posted October 21, 2012 The carpenters are installing the solid wooden door at the passage way to bedrooms. This is a 70kg full height solid wooden door, which can't go into the lift. Need 4 persons to carry it all the way from ground floor to 15th floor Uploaded with ImageShack.usUploaded with ImageShack.us17 Oct 2012My full height display cabinet which covering the ugly bomb shelter completed !Uploaded with ImageShack.usUploaded with ImageShack.us Share this post Link to post Share on other sites