hoaili 3 Report post Posted September 23, 2012 The marble chips looks intetesting n nice.... Show ur final product when installed Thanks for dropping by, potatoes ! Fell in love with the marble chips when ID first shown me the picture how will it look like. Can't wait to see the end result ! Will post the picture once it's done ! Stay tune ya Share this post Link to post Share on other sites
hoaili 3 Report post Posted September 25, 2012 (edited) Floor tiles for Bedroom 2 & 3 are done, MBR half way, Study room not yetBedroom 2Uploaded with ImageShack.usBedroom 3Uploaded with ImageShack.usMBRUploaded with ImageShack.usAccording to Contractor, floor tiles for Living / Dining will be completed by this week. ID coming on Thursday to place the marble chips personally at the Walk way to bedroom and Foyer. Arranging Hoe Kee to deliver stuff on Thursday as well. Edited September 29, 2012 by hoaili Share this post Link to post Share on other sites
hoaili 3 Report post Posted September 29, 2012 (edited) Updates on Marble chips flooring at the walk way to bedrooms, which ws done on Thursday (27 Sept)ID sieved out the imperfect marble chips and arranged them one by one personally. The whole process took nearly to 4 hours !Uploaded with ImageShack.usUploaded with ImageShack.usCloser look at the flooringUploaded with ImageShack.usGoing to completeUploaded with ImageShack.usFinally completed !Uploaded with ImageShack.usSo in love with the marble chips flooring We shall continue on Monday for the Foyer ! Edited September 29, 2012 by hoaili Share this post Link to post Share on other sites
May_dream1 14 Report post Posted September 29, 2012 The marble chips looks so nice! Envious!! Share this post Link to post Share on other sites
hoaili 3 Report post Posted September 29, 2012 The marble chips looks so nice! Envious!!Thanks May ! The end result is very satisfying, my kids also love the flooring very much ! Told my hubby that this flooring can treat insomnia - whenever we have sleepless night, can start counting the marble chips from foyer to the walkway instead of the sheeps Share this post Link to post Share on other sites
May_dream1 14 Report post Posted September 29, 2012 Thanks May ! The end result is very satisfying, my kids also love the flooring very much ! Told my hubby that this flooring can treat insomnia - whenever we have sleepless night, can start counting the marble chips from foyer to the walkway instead of the sheeps Can pm me how much it costs to do that? I really like marble. Share this post Link to post Share on other sites
Greyembers 0 Report post Posted September 29, 2012 Hi can you give me the contact for yor marble flooring and the price psf u paid for the flooring? Share this post Link to post Share on other sites
hoaili 3 Report post Posted October 1, 2012 Today, we finally completed the marble chips flooring at foyer area ID is arranging the marble chips, while tiler is sticking the chips one by one Uploaded with ImageShack.usUploaded with ImageShack.usUploaded with ImageShack.usCloser look at the marble chips, aren't them beautiful ?Uploaded with ImageShack.usView from main entranceUploaded with ImageShack.usThe next schedule :Tuesday - re-wiringThursday - aircon installation / PUB gas connectionFriday till next tuesday - paintingNext Wednesday - carpentry deliveryNext Thursday onwards - carpentry installationID & Contractor said, should be able to hand-over by 20 Oct, woo hoo Share this post Link to post Share on other sites
hoaili 3 Report post Posted October 3, 2012 Updates for yesterday progressBalcony was levelled up. The living room now looked spacious !Re-wiring work commencedUploaded with ImageShack.usUploaded with ImageShack.us Share this post Link to post Share on other sites
hoaili 3 Report post Posted October 3, 2012 Went up to the new house at evening, welcomed by a surprise from ID - my vanity top ! Using left-over floor tiles to create this effect. Like this very much, at least it is different from the normal solid surface or granite top ! Uploaded with ImageShack.usRiverstone at MBR toilet shower area. Can have foot massage and shower at the same time ! Uploaded with ImageShack.usRe-wiring completed today. Tomorrow is air-con installation ! Share this post Link to post Share on other sites
hoaili 3 Report post Posted October 7, 2012 04 Oct 2012Install Toshiba Inverter Sys 3 by All Best. The air-con installer worked from 10am till 7.30pm. As the lights are not up yet, the installer used a tiny torch light to connect all wires to the condenser Damage $2899, good deal as all blowers and condenser are Made In Japan ! MBR - 13K BTUUploaded with ImageShack.usDaughter's Room - 10K BTUUploaded with ImageShack.usSon's Room - 10K BTUUploaded with ImageShack.usGas piping at Kitchen by City GasUploaded with ImageShack.us Share this post Link to post Share on other sites
hoaili 3 Report post Posted October 7, 2012 5 & 6 Oct 2012Contractor and his staff are patching all the holes on the walls before proceed with painting. Forgot to take any picture of the activity. Went to Ikea on Friday (5 Oct 2012) to buy daughter's bedframe with underbed Uploaded with ImageShack.usUploaded with ImageShack.us7 Oct 2012Went to new house to see see look look after lunch, first coat of painting is in the progress! Whole house now look much brighter Uploaded with ImageShack.usUploaded with ImageShack.usUploaded with ImageShack.us Share this post Link to post Share on other sites
Sygnur 0 Report post Posted October 7, 2012 Wow..! Wow! Wow!!!! LOve the marble stone flooring... An the riverstone in the bath area.... Such great idea... And the vanity counter is something else too... who's ur id? And how much is the quote? Cant wait for ur kitchen to be up... Im sure will be as lovely as other areas too... Live the red tiles.. Share this post Link to post Share on other sites
hoaili 3 Report post Posted October 7, 2012 Wow..! Wow! Wow!!!! LOve the marble stone flooring... An the riverstone in the bath area.... Such great idea... And the vanity counter is something else too... who's ur id? And how much is the quote? Cant wait for ur kitchen to be up... Im sure will be as lovely as other areas too... Live the red tiles..Hi SygnurThanks for dropping by ! Yap, my ID is creative ! She propose something different from others and fell in love with her ideas immediately. She is an independent Interior Designer from JB sorry that not convenient to disclose the $$$ here Love so much the marble chips flooring and riverstone at bath area! The red tiles are from JB too, cause we can't find the red that we want in Singapore. The carpentry work will be up next week, keep a look out for more pics, ya ! Share this post Link to post Share on other sites
hoaili 3 Report post Posted October 10, 2012 10 Oct 2012Opennet staff came at 9am to instal the Terminal Point. The TP was installed at the Study Room instead of Living Room, pay $33 for extra 5 meter cabling.Uploaded with ImageShack.usWater closets and Instant Water Heaters for MBR Toilet and Common Toilet are up !MBR Toilet - Roz 1 piece WC and 707 PrincetonUploaded with ImageShack.us Common Toilet - Roz 2 WC and 707 ProtekUploaded with ImageShack.usUploaded with ImageShack.us Share this post Link to post Share on other sites