hoaili 3 Report post Posted September 12, 2012 Congrats in getting your dream flat. Now Reno time to make it your dream home!Thank you very much, May ! Reno started this morning 9am sharp. Share this post Link to post Share on other sites
hoaili 3 Report post Posted September 12, 2012 Got up at 6am and had "Open Door" ceremony before 7am. Took this chance to take pre-reno pics. Contractor and his workers came at 8.30am, gone through what are the things need to do for the next few days. DiningUploaded with ImageShack.usLivingUploaded with ImageShack.usKitchenUploaded with ImageShack.usStudy RoomUploaded with ImageShack.usBedroom 2 Share this post Link to post Share on other sites
hoaili 3 Report post Posted September 12, 2012 (edited) Bedroom 3Uploaded with ImageShack.usMBRUploaded with ImageShack.us Edited September 29, 2012 by hoaili Share this post Link to post Share on other sites
hoaili 3 Report post Posted September 12, 2012 (edited) Went up to new place at 1pm, guess what ? The hacking was 70% done! Only took 1 pic of the hacked Living. According to Contractor, they are going to remove the debris tomorrow! Progress is satisfying Cement was deliveredUploaded with ImageShack.us Edited September 18, 2012 by hoaili Share this post Link to post Share on other sites
casa 0 Report post Posted September 12, 2012 Wah congratsHope U heng heng buy your hse unit no and tio bey pio this weekend to cover your reno cost Share this post Link to post Share on other sites
hoaili 3 Report post Posted September 12, 2012 Wah congratsHope U heng heng buy your hse unit no and tio bey pio this weekend to cover your reno cost Hahaha, thanks Bro Casa ! Share this post Link to post Share on other sites
Nivle 0 Report post Posted September 12, 2012 Wah congratsHope U heng heng buy your hse unit no and tio bey pio this weekend to cover your reno cost Bro, not so easy...mine 11-100.. I box front and back till crazy from OTP... keep coming out 1111 last month.. Share this post Link to post Share on other sites
MamaO 1 Report post Posted September 13, 2012 Went up to new place at 1pm, guess what ? The hacking was 70% done! Only took 1 pic of the hacked Living. According to Contractor, they are going to remove the debris tomorrow and should be able to lay cement on Friday ! Progress is satisfying Cement was deliveredUploaded with ImageShack.usseem fast and its good since you need to move soon. Share this post Link to post Share on other sites
hoaili 3 Report post Posted September 13, 2012 Bro, not so easy...mine 11-100.. I box front and back till crazy from OTP... keep coming out 1111 last month..Somehow I agree with Bro Elvin, furthermore I am that kind of person NEVER got luck in 4D or Toto Share this post Link to post Share on other sites
hoaili 3 Report post Posted September 13, 2012 (edited) Hi MamaO, Indeed they are very fast. Just went up to inspect the progress this morning, hacking was 100% done as promised by the Contractor. Kudos to the workers, hacking only took 1 day to complete. The workers started work at 9am sharp, within an hour, they have cleared the debris in Living and study room, and transporting the sands up to the unit. Uploaded with ImageShack.usUploaded with ImageShack.us Edited September 18, 2012 by hoaili Share this post Link to post Share on other sites
hoaili 3 Report post Posted September 13, 2012 Common Toilet - wall / feature wall / floorUploaded with ImageShack.usReceived call from Contractor, minor hiccup from LSH that they forgot to reserve the floor tiles for Common Toilet, it is now out of stock! How can this happen ? Was told to choose either a slightly darker or lighter tone, now waiting for ID's reply on the tiles colour Share this post Link to post Share on other sites
hoaili 3 Report post Posted September 16, 2012 No updates for the last 2 days, but the tiles are delivered !Marble chips from JBUploaded with ImageShack.usKitchen Red tiles from JB (can't find the desired red that I want, so went to JB to source for it )Uploaded with ImageShack.usLiving/all bedrooms floor tilesUploaded with ImageShack.us Share this post Link to post Share on other sites
hoaili 3 Report post Posted September 16, 2012 (edited) Went to JB on last Friday to collect the lightings for Foyer, Dining and MBR.We use track light for Foyer, cost RM263, sorry that I forgot to take the picture of it.For Dining - 7 legged octopus, cost RM400 (equivalent to SGD161, based on exchange rate 2.48), so much cheaper than in Singapore !Uploaded with ImageShack.usFor MBR - cannot afford crystal lighting as it's too expensive. This one only cost us RM480 (equivalent to SGD193, based on exchange rate 2.48)Uploaded with ImageShack.usTOTAL DAMAGE FOR LIGHTINGS IN JB - RM 1143, (equivalent to SGD461)Other lightings are from Chan Huat, Balestier. Edited September 16, 2012 by hoaili Share this post Link to post Share on other sites
hoaili 3 Report post Posted September 16, 2012 (edited) Today is the shopping day ! Went to Harvey Norman at Suntec, bought the fridge, hood and hob ! Samsung FridgeUploaded with ImageShack.usTurbo Hob and HoodUploaded with ImageShack.usUploaded with ImageShack.usTOTAL DAMAGE $1928 Edited September 16, 2012 by hoaili Share this post Link to post Share on other sites
hoaili 3 Report post Posted September 16, 2012 Also bought the Four Star Single size mattress for our princess, sofa and TV console for our Study cum entertainment room from Furnitures and Furnishing located at Suntec. 3-seater recliner sofa Uploaded with ImageShack.usTV console Uploaded with ImageShack.usFour Star Single size mattressUploaded with ImageShack.usTOTAL DAMAGE $1392 Share this post Link to post Share on other sites